Double-Decker Stalls Checklist: 20 Things to Confirm Before Your Event

Checklists

Double-Decker Stalls Checklist: 20 Things to Confirm Before Your Event

Seven phases, one owner each: what to confirm for double-decker stalls, when it is due, and what breaks on site when it is assumed instead.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 14 min read

Short answer

For double-decker stalls, confirm in this order: the brief, area, open sides, height limit and budget; the design, with materials and electrical load specified; organiser approval, certificates and print-ready artwork; the pre-dispatch inspection and loading list; the build-up sequence and a signed handover a day before doors open; the daily show-day checks; and dismantle, clearance and lead follow-up. The failure mode is always the same — an item that was assumed rather than evidenced — so ask for a photograph, a certificate or a signature instead of a reassurance.

Key takeaways

  • Approve materials and finish codes, not only renders — "as per design" is not something a workshop can cut to.
  • Plan dismantle before build-up. Clearance deadlines and deposits are lost at the end of a show, when everyone has stopped paying attention.
  • Refuse to start a phase until the one before it has genuinely closed. Early starts cause rework, not speed.
  • The pre-dispatch inspection is the last cheap place to fix anything. Once the truck leaves, every fix is a site fix.
  • Every item needs a date and a name against it. An unowned item is an item nobody is doing.
  • Tick items on evidence — a photograph, a certificate, a signed list — never on a reassurance.

What this double-decker stalls checklist is for

Structurally certified two-storey stands with private meeting rooms upstairs and open display below.

Lists of nouns do not survive a busy fortnight. "Artwork" gets ticked as soon as somebody has emailed about artwork; "artwork at final size, with bleed, approved on the real substrate" cannot be ticked until it is true. Every item here carries the thing that goes wrong when it is skipped, because that is the only part of a checklist anybody reads twice.

Seven phases, strictly sequential. The value is in the gates between them rather than in the items themselves, because the expensive mistakes are all the same shape: somebody started the next phase on an assumption. Board cut against an unapproved drawing, panels printed from a file still in review, a truck loaded on a promise.

It is the same list whether you are exhibitors, procurement teams and agencies who need a stall built on time, to drawing, and safely at the venue or running your first show. What changes is who owns it. Pick one person on your side with the authority to decide, pair them with one named project manager on the build side, and keep one copy rather than two.

  1. 01

    Phase 1 — Lock the brief

    Closes when the show, hall, stand number, area, open sides, height limit, budget band and the single visitor action you are designing for are all written down in one place. Nothing should be designed before that is true, because every later decision inherits this one.

  2. 02

    Phase 2 — Design and specification sign-off

    Done when there is a version number everybody is agreeing to, a finish schedule standing behind the render, and no stakeholder left who has not yet seen it.

  3. 03

    Phase 3 — Approvals and pre-production

    Finished when nothing downstream is waiting on a piece of paper. Stamped drawings, certificates, final artwork and a signed scope — all four, or production has not really been released.

  4. 04

    Phase 4 — The pre-dispatch check

    Finished when the snag list is closed and re-walked, the load is labelled against the drawing, and the spares are packed on purpose rather than from memory.

  5. 05

    Phase 5 — Assembly on site

    Finished when you could open the stand to a buyer that minute. If it needs one more hour, build-up is not over, whatever the schedule says.

  6. 06

    Phase 6 — Show days

    Runs until the last visitor on the last day, repeating one short morning list: lights, screens, stock, cleaning, lead capture and a staff briefing. Stands fail on day three, not day one.

  7. 07

    Phase 7 — Strike and the week after

    The phase everybody stops managing, which is exactly why deposits are lost and leads go cold. It closes on paper: clearance confirmed, inventory listed, follow-up done.

Stage, owner, deadline

A schedule without owners is a wish. Below, every stage has exactly one accountable party — not a department, a party — and a deadline counted backwards from the show, which is the only form of deadline that still makes sense after a date change.

The useful column is the right-hand one. It tells you which slips are survivable and which are not, and the answer is rarely intuitive: the glamorous decisions are usually floatable, while the paperwork is what everything else is standing on.

What has to closeOwnerDeadlineBlocked until it does
Show, hall and stand number checked against the floor planExhibitor, with the organiser6 weeksTransport planning, crew sizing and how many sides the design must finish
Materials, finishes and lighting scheduleDesigner, with the exhibitor5 weeksProcurement and the workshop cut list
Itemised scope frozen and signed line by lineProject manager, exhibitor counter-signs5 weeksEvery later argument on site about what was included
Structural and fire certification where requiredFabricator, with a licensed engineer4 weeksDouble-deckers, staircases, hanging rigs and clearance at the gate
Power, water and internet ordered from the organiserProject manager4 weeksThe published rate, and sometimes availability altogether
Print-ready artwork at final sizeExhibitor brand team3 weeksEvery printed surface, which is most of what a visitor sees
Production release to the workshopProject manager3 weeksFabrication, finishing and the pre-dispatch date
Long-lead items ordered: screens, specialist lighting, importsProject manager3 weeksThe build itself, if the stock is committed elsewhere
Pre-dispatch inspection and snag closureWorkshop QC, exhibitor on a video call10 daysDispatch — nothing loads with snags still open
Transport, vehicle passes and unloading slotProject manager7 daysArrival time, and therefore your real build hours
Handover inspection, signedProject manager and exhibitor togetherShow day −1Your right to have snags fixed before doors open
Dismantle, clearance and deposit releaseProject managerAgreed before build-upReturn of reusable elements, and your deposit

These are defaults for a standard custom stall. A bigger or more heavily finished stand pushes every row earlier, by exactly what the planner's formula adds: +1 from 24 sq.m, +2 from 54 sq.m, +2 premium, +2 double-decker, on a 3-week base.

Phase 1 — constraints before concepts

Get this phase right and the rest is administration. Get it wrong and every subsequent decision is made on a guess. The brief is a list of constraints and one outcome, not a mood board, and it should be short enough to fit on a page.

Write the goal as a sentence, not an adjective. A stall layout with a clear entry, a working demo counter, storage that keeps the floor clean, and a closed meeting area for serious buyers is a goal you can design against and judge afterwards. "Premium and impactful" is not, and a stand briefed that way gets approved on taste and reviewed on results.

  • Who can say no, and by when — a stakeholder discovered in week four causes a redesign, while the same stakeholder listed in week one causes a review
  • Show name, city, venue, hall and stand number — crews have arrived at the right venue and the wrong hall, and an hour lost at two in the morning is an hour off your finishing time
  • What you are reusing from the last show, and where it is physically stored — elements nobody can locate are elements you will pay to build a second time
  • Budget band and exactly what it has to cover — a figure that silently excludes transport, installation, dismantle and taxes is not a budget, it is a deposit
  • Who will physically staff the stand, and whether they are free every show day — a roster agreed in week one avoids a stand run by whoever happened to be available
  • One named owner for this checklist on your side, with the authority to decide rather than only to report
  • Brand assets at print resolution, with logo variants and Pantone or CMYK references — a low-resolution logo pulled off a website is the most common reprint there is
  • The products that will actually stand on the stand, with their weight and dimensions — a machine that will not fit through the hall door is a problem with no on-site solution

Phase 2 — signing off the design properly

"Approved" usually means somebody liked the render. That is half a sign-off. The other half asks whether it can be fabricated at the quoted price, powered within the declared load, moved through the hall's doors, and stamped by the organiser — and that half is what protects the schedule.

This is the last cheap place to change your mind, and it is worth spending an extra day here rather than an extra week later. Moving a counter on a drawing takes a minute; moving it in a workshop costs material; moving it in a hall costs a night shift and whatever the crew happens to be carrying.

  • A dimensioned, version-numbered drawing set issued to everyone who needs it, so the site crew is not working from three different files with the same name
  • Concept approved in writing by every internal stakeholder who could reverse it, all against the same version number
  • A written note of what was rejected and why, so the same idea does not return in week five as a fresh suggestion
  • Electrical load added up circuit by circuit and declared to the organiser, with the point of supply located on the plan
  • Visitor circulation checked on the plan: where somebody enters without committing, where they stop, and where your team stands without blocking the entrance
  • A deliberate decision about what the stand does not do, written down, so scope does not grow quietly through the approval chain
  • Ramp, threshold and turning space checked on the floor plan — accessibility is easy on paper and impossible to retrofit
  • Eye-level views from the aisle, not only a flattering raised corner render — you should be approving what a visitor will actually see when they walk past
Dispatch is a decision, not a date.

Phase 3 — approvals, artwork and release

The work here is mostly waiting, and waiting is the hardest thing to manage because it generates no alarm. Submit early, chase deliberately, and treat every outstanding approval as a stopped production line rather than as an administrative loose end.

Organiser rules are constraints, not paperwork. They decide how high you may build, what may be hung, what may be brought into the hall and when it must leave — and a rejected submission does not cost a conversation, it costs a working week.

  • Fire-retardant certificates for every material entering the hall, carried physically by the site crew — uncertified material gets turned away at the gate, and the gate is not a place to argue
  • Floor loading checked against the hall's limit for anything heavy — a machine, a vehicle, a water feature or a fully stocked store
  • Payment milestones aligned to the production schedule, so finished work is never held at a workshop over an invoice during the last fortnight
  • Insurance and public liability cover in place for the build crew and the show days, in the name the organiser asks for
  • The written scope frozen and signed line by line, so that what the workshop builds and what you believe you ordered are demonstrably the same list
  • Vehicle, driver and crew details submitted for passes in the format the venue's security desk accepts
  • Power, water, compressed air and internet ordered from the organiser inside their deadline, while the published rate still applies
  • Lead capture chosen and tested now rather than in the taxi to the venue, with somebody named to export the data each evening

Double-Decker Stalls: what the order itself has to say

An order is a list, not a number. Written as a list it tells you what you are getting; written as a total it tells you only what you are paying, and leaves both double-counting and outright gaps invisible until somebody is standing in a hall.

Confirm the service scope first, then go hunting for the omissions. Freight, crew, strike and tax between them account for most of the gap between two quotes that look like they describe the same stand.

  • Structural engineer sign-off — pin the material and the finish code, because "as per design" is not a specification a workshop can cut to
  • Glass meeting rooms upstairs — write down who supplies it and who installs it; the items that go missing are always the ones both sides assumed the other was bringing
  • Organiser approval handling — check it against the venue's rules on height, load and fire rating before it is produced rather than after it is standing in the hall
  • Safe staircases and railings — ask what happens if it fails on day one — whether a spare exists, and who is carrying it
  • Electrical fittings, distribution and the labour to connect them, which are frequently a separate trade and a separate bill
  • Installation, supervision and the crew size that will genuinely be on site, not a nominal figure
  • Transport to the venue and back, with the vehicle type and the number of trips stated
  • Reprints and small changes after sign-off, priced now rather than negotiated under pressure later
  • GST, organiser charges and any venue levy, shown on their own lines rather than folded into the build

Exhibiting soon? Let's build your stall.

Or use the full form

Phase 4 — the pre-dispatch inspection

Assemble it before you load it. Every fault that is cheap to fix is cheap only while the stand is still in the workshop: a short panel, a mismatched laminate, a counter that blocks a door, a graphic printed from last week's file. The identical fault at the venue needs a van, a gate pass, a night shift and a conversation with the organiser's security desk.

Use one question as the gate: is this good enough to show a customer today? Not good enough to finish on site, not good enough with a bit of touching up — good enough now. Anything less and the load stays where it is, because site time is the most expensive time there is.

  • Crew travel, accommodation and site passes booked — a crew that reaches the venue without a pass is a crew standing outside your hall
  • Graphics checked against the final approved artwork file, not against the version that was approved three revisions ago
  • A copy of the packing list held by the exhibitor too, so a missing crate can be identified by somebody other than the person who mislaid it
  • All lighting powered up and run in — a failed driver found in the workshop is a spare part, and the same driver found on site is a dark brand wall
  • Photographed from every side and shared with you for written approval — you do not have to be in the workshop, but you do have to see it
  • Snag list raised, closed and then re-walked. A snag list that is raised and hoped about is a snag list that travels with the truck
  • Stock, samples and giveaways counted and packed separately from the build, with their own list and their own owner
  • Panel sizes checked against the hall's door and lift dimensions, because a wall that cannot get in is not a wall

Phase 5 — build-up at the venue

Build-up is a scheduling problem rather than a construction problem. The stand is already built; what happens on site is assembly in a shared, noisy, crowded hall with forklifts, other exhibitors and a hard stop at the end of it. Your real constraint is access hours, and those belong to the organiser. Sequence matters because each trade blocks the next, and out of order you either dismantle something you have just finished or hand over a stand with trunking visible from the aisle.

Everything in the table below is an ordering decision rather than a quality decision. Each row is finished before the next one starts, and the cost of getting the order wrong is in the final column. None of those costs are theoretical; they are the standard way a build-up goes late.

SequenceCondition to move onConsequence of moving on early
Platform and flooringRaised floor laid, cables run and hidden, edges finishedTrunking crossing the aisle — a trip hazard and a venue objection
Structure and joineryWalls, counters, storage and any staircase assembled, level and squareGraphics that will not sit flat, because the frame behind them is out of square
Storage and back-of-houseLockable store fitted out, stock placed, door clearances checkedCartons stacked in the display area, in full view of buyers
Lighting aim and focusEvery spot aimed at a product rather than at the floor or a visitor's eyesA stand that is lit and still looks flat from the aisle
Furniture and plant deliveryHired items checked in against the order and signed forA missing counter discovered on the morning of day one
HandoverWalkthrough with the exhibitor, signed off, spares and keys handed overNobody accountable for the stand at the moment it starts working

Finish a day early on purpose. The last day of build-up is the only slack the project has, and spending it on contingency rather than on construction is the difference between a calm opening and a visible one.

Phase 6 — show days, every morning

A show runs on a short list repeated daily. The temptation after a hard build-up is to stop managing and start selling, which is how stands arrive at day three with two lamps out, an empty brochure stand, a screen frozen on a dialog box and a lead form nobody has emptied since the first afternoon.

Work the roster from the area: one person per 9 sq.m, never fewer than two. That is about 4 on a 36 sq.m stand and 8 on a 72 sq.m one. Too few and ready buyers walk away unserved; too many and a browser will not step in at all.

  • A named person responsible for the stand at every moment, including lunch, the organiser's awards and the final hour of the last day
  • Stock, samples and brochures replenished from storage before the hall fills, not at lunchtime across a crowded aisle
  • A spare of everything that can fail in public: lamp, remote, cable, demo unit, printed brochure
  • Two or three agreed qualifying questions, so a thirty-second conversation separates a buyer from a bag collector without anybody being rude
  • Phones charged and out of hands. Staff looking at phones is the most reliable way to make a busy stand look empty
  • Meetings booked into slots rather than taken as they arrive, so the stand is never blocked by one long conversation
  • A staff roster with real breaks written into it. A tired team on day three is the actual reason conversion falls away, not the design
  • The stand cleaned and reset every morning — fingerprints on an acrylic panel are visible from the aisle and read as neglect

Phase 7 — strike, clearance and follow-up

Nobody plans the end of a show, which is why the end of a show costs money. Clearance deadlines are enforced, deposits are real, and crews are already committed elsewhere. Settle the strike plan while you are still planning the build.

The week after the show is where the return on the whole exercise is won or lost. A stand that produced three hundred conversations and no follow-up is an expense rather than an investment, and the cost of that failure is larger than anything else on this page.

  • Waste removed rather than left in the aisle, because clearance charges are billed to whoever the organiser can identify
  • A short post-show note on what to change: where visitors stopped, what they asked for that you did not have, and which element earned its cost
  • A final walk of the empty plot with somebody from the venue, so damage is agreed on the spot rather than invoiced a month later
  • Photographs taken on the first morning before the crowd arrives — an empty, lit, clean stand is the only usable image you are going to get all week
  • An internal debrief inside a fortnight, while the people who stood on the stand still remember what happened on it
  • Leads scored and followed up within 48 hours, while the conversation is still remembered on both sides of it
  • Products and samples packed by the people who own them, before a crew starts dismantling around them
  • Graphics kept flat and dry if the artwork will be reused, and scrapped deliberately if it will not

Where checklists usually fail

Three failure modes, in order of damage: no owner, two copies, and ticks given for intention rather than evidence. The last one is the one that gets all the way to the venue before anybody notices.

The recurring problems on this kind of work are specific. Sub-contracted builds with no quality control, and non fire-retardant materials rejected at the venue. Neither is discovered by looking at a render; both are discovered by asking who does the work and where.

  • Late arrival on site that eats into build-up time
  • Hidden extras for electrical, carpet or dismantling
  • Sub-contracted builds with no quality control
  • Non fire-retardant materials rejected at the venue
  • One person holding every detail in their head, with no handover if they fall ill during show week
  • No named owner for the final 48 hours, when every remaining task is urgent and nobody has the authority to choose between them
  • Verbal agreements with site crews that nobody carried back into the written scope
  • Items ticked on intention rather than evidence — ask for a photograph, a certificate or a signed list instead of a reassurance
  • Progress measured by how much has been done rather than by what is now unblocked

Next step: a checklist with your dates on it

Share your show name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept, an itemised double-decker stalls scope and a dated version of this checklist mapped to your show rather than to a generic calendar, usually within 48 hours.

Design is free with a confirmed fabrication order, the build happens in our own workshops, and the organiser submissions are ours to prepare. One project manager carries the schedule from brief to clearance, because a checklist with two owners is a checklist with none.

Frequently asked questions

What should be in the order besides the build?+

Transport both ways, installation and crew, dismantle and clearance, electrical fittings and the labour to connect them, and taxes — each on its own line. Those are the lines most often left out of a lump sum.

Who should own the checklist?+

One person on your side and one named project manager on the build side, reviewing a single shared copy every week. Two copies in two inboxes is functionally the same as no checklist at all.

Can you run this checklist for us?+

Yes. Every confirmed order gets a named project manager who owns the schedule, the organiser submissions, the pre-dispatch inspection, build-up, handover and dismantle, and who reports against this list weekly rather than when asked.

Is a double-decker stalls checklist different for a small stand?+

The phases are identical; the number of items in each is smaller. What does not shrink is the approval and artwork work, which is why small stands run late for exactly the same reasons large ones do.

Should deadlines be dates or weeks before the show?+

Weeks before the show. Show dates move, and a list of fixed dates silently becomes wrong the moment they do, whereas weeks-before-show survives the change intact.

How many staff should be on the stand?+

Roughly one for every 9 sq.m of stall area with a minimum of two — about 4 on a 36 sq.m stand and 8 on a 72 sq.m one. Build the roster with real breaks in it; a tired team on day three converts worse than an under-designed stand.

What goes wrong most often on site?+

Sequence. Graphics before the frame is square, electrical after the walls are closed, cleaning before the last fitting is done. The structure is rarely the problem; the order the trades work in usually is.

What paperwork should the site crew carry?+

The stamped organiser approval, fire-retardant certificates for every material, the structural certificate if there is a raised or two-storey element, vehicle and crew passes, the electrical load declaration and the signed loading list.