By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read
Short answer
Quoted per project; ideal for 72 sq.m and above. For double-decker stalls, stall area in square metres and number of open sides, finish level (laminate, paint, veneer, acrylic, metal) and height, hanging structures and double-decker elements do most of the work in the arithmetic. Decide those before you brief anyone, insist on an itemised quote, and compare like with like: the cheapest total is usually the one with the most left out.
Key takeaways
- Changing your mind is free while the concept is being designed and expensive at every stage after it.
- Quoted per project; ideal for 72 sq.m and above.
- Before anything else, settle stall area in square metres and number of open sides and finish level (laminate, paint, veneer, acrylic, metal) — the rest of the quote follows from them.
- Always compare itemised quotes, not lump sums — the cheapest total is usually the one with the most left out.
- Only 50% of this page's illustrative total is fabrication. The other ₹4,88,000 is everything a lump sum hides.
- Reuse beats negotiation. A second outing with the same structure is 30% of the first show's figure, with nothing haggled.
Double-decker stalls: the published ranges
Structurally certified two-storey stands with private meeting rooms upstairs and open display below.
Quoted per project; ideal for 72 sq.m and above. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.
Custom fabrication is published at ₹9,000–₹18,000 per sq.m. Below that sit system builds, where the frame is reused instead of cut fresh, and below those an upgraded shell scheme. Read those as three different bargains rather than three qualities: you are trading how bespoke the stand looks against how much of it you still own after the show.
The band has an arithmetic shape worth seeing. Because ₹18,000 is twice ₹9,000, the same build money buys either a large plain stand or half the area beautifully finished. Exhibitors who have decided which of those they need brief quickly and buy well; exhibitors who have not spend the whole process trying to have both.
| Construction type | Relative cost | What you keep afterwards |
|---|---|---|
| Shell scheme upgrade | Lowest | Graphics only |
| Octanorm / system build | Low | Frame and graphics |
| Modular with custom graphics | Medium | Frame, graphics, furniture |
| Custom wooden build | ₹9,000–₹18,000/sq.m | Limited |
| Double-decker | Quoted per project | Structure, with engineering |
Reuse is the column that decides cost over a year of shows, rather than cost at this one. Read it before the cost column if you exhibit more than twice.
What actually moves a double-decker stalls price
Price every double-decker stalls enquiry against the same short list and vendor comparison stops being guesswork. Each line below is something you can change; the total is only what they add up to.
Open sides are the variable exhibitors forget to price. Each additional open face adds finished surface, another lighting run and another person to staff it — which is why two stands of identical area can quote very differently.
Then there is the pair nobody prices at briefing stage: lead time and finish level. 5 weeks is the schedule for 54 sq.m — take that away and you have not saved anything, you have bought the same work on an overtime shift. Finish is the other one: specify veneer where laminate would read identically from the aisle and you have spent the lighting budget on something visitors cannot see.
- Height, hanging structures and double-decker elements
- LED walls, lighting and raised flooring
- Distance from the workshop to the venue and build-up hours
- Stall area in square metres and number of open sides
- Finish level (laminate, paint, veneer, acrylic, metal)
- The finish on surfaces visitors can touch, as against the ones they cannot
- How far the workshop is from the venue, and whether a lorry can reach the hall door
- Anything the organiser has to sign off: height, rigging, a raised floor, a second storey
- The number of open sides, which decides how many faces have to be finished
You cannot compare two quotes until both describe the same stand.
Reading a double-decker stalls quote properly
An itemised quote is not a courtesy, it is the only format in which a price can be checked. Each line is something you can question, reduce or delete; a single figure is something you can only accept or refuse.
Four lines go missing more often than the rest: the return journey, the on-site crew, the dismantle, and the tax. On this page's illustrative 54 sq.m figures, transport and installation alone are ₹1,60,000 — which is what a quote without them is quietly saving.
For fabrication work there are a few lines beyond the obvious ones that belong on the page: the certification the venue will ask for, the drawings the organiser will ask for, and the person whose phone you will be ringing at seven in the morning on build-up day. None of those are large figures. All of them are expensive to arrange late.
- Glass meeting rooms upstairs
- Organiser approval handling
- Safe staircases and railings
- Pre-build or dry assembly at the workshop before dispatch
- Installation, the on-site crew, and who supervises them
- Storage of reusable elements after the show, and for how long
- Dismantle and clearing the stand inside the organiser's window
- A named project manager, with a phone number, for the build-up days
- Graphics proofing, and what happens if a panel has to be reprinted
- Structural engineer sign-off
What 54 sq.m actually costs, line by line
An example is worth more than a range. This one is 54 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.
At ₹9,74,000 this stand works out at roughly ₹18,037 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹4,88,000, a little more than the fabrication itself.
Before you use that number, apply two adjustments. The structure is priced at the band's lower end, so a heavier finish specification pushes it toward ₹9,72,000 for the same 54 sq.m. And the total is before GST throughout. With both adjustments made, it is a sound planning figure for a mid-finish custom stand, and nothing more than that.
| Structure and joinery (54 sq.m × ₹9,000) | ₹4,86,000 |
|---|---|
| Lighting — track, aimed spots and backlit panels | ₹78,000 |
| Raised flooring and carpet | ₹62,000 |
| Furniture — counters, seating, planters | ₹54,000 |
| Graphics — brand wall, tensioned fabric and vinyl | ₹1,34,000 |
| Transport, both ways | ₹68,000 |
| Installation, crew and dismantle | ₹92,000 |
| Indicative total, before GST | ₹9,74,000 |
Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.
Area against finish: what the band actually means
Because the top of the published band is twice the bottom, every build budget describes two possible stands: a larger one at a plain finish, or one of half the area at a premium one. The table below is that arithmetic at the sizes exhibitors actually book. The right-hand column is what the spread between the two ends of the band is actually spent on.
Hold the two middle columns next to each other and the trade is exact: the difference between them, ₹9,000 per sq.m, is the same as the lower rate itself. Upgrade the finish or double the footprint — at the published band, those two cost the same. Few budget decisions are this clean, and almost nobody uses it.
Choose by the job, not the taste. Anything involving queuing, demonstrating, handling or sitting down is an argument for area, because the premium finish on a stand nobody can enter is money spent on photographs. Anything involving persuasion rather than throughput is an argument for finish — and in that case a smaller stand, properly lit, beats a larger one that looks provisional.
| Stall size | Plain finish, build only | Premium finish, build only | What separates the two |
|---|---|---|---|
| 18 sq.m | ₹1,62,000 | ₹3,24,000 | A raised floor, aimed lighting and furniture you do not have to apologise for |
| 24 sq.m | ₹2,16,000 | ₹4,32,000 | A branded floor, a demo counter that actually works, and a spare hero panel |
| 54 sq.m | ₹4,86,000 | ₹9,72,000 | Double-height brand elements, integrated AV and a storage wall that hides the cartons |
| 72 sq.m | ₹6,48,000 | ₹12,96,000 | Architectural form — curves, a ceiling element, and a stand that reads as a building |
| 100 sq.m | ₹9,00,000 | ₹18,00,000 | All of the above, plus the engineering a raised or second-storey element needs |
Both columns are build only, at the two ends of the published band. Read them as the first line of a quote rather than as a quote.
Reading the gap between two quotes
Two quotes for one brief rarely differ because one vendor is greedy. They differ because the brief left a dozen decisions open and each vendor closed them differently — one in the direction of looking affordable, the other in the direction of looking thorough.
The arithmetic below is the whole phenomenon in one table. Take the 54 sq.m example and make six substitutions a vendor could defend in a meeting, and ₹9,74,000 becomes ₹7,56,000. The 22% difference — ₹2,18,000 — is entirely scope, and none of it is visible in a lump-sum comparison.
So the fix sits with the buyer. Specify the things above in writing before you circulate the enquiry, and the spread between quotes collapses to something like the real difference between the vendors. Skip it, and you are not comparing prices at all — you are comparing assumptions.
| Line | The two readings of your brief | What to put in writing |
|---|---|---|
| Drawings and approvals | One vendor is preparing the organiser submission; the other expects you to | Who prepares the drawings, and who submits them? |
| Electrical | The organiser's power charge, the stand's own wiring, or neither | Who pays the organiser, and who wires the stand? |
| Lighting | Fourteen aimed fixtures against six, or against none at all | How many fixtures, of what type, aimed at what? |
| Risk | One vendor has priced the unknowns; the other will raise them later as variations | What happens to this price if the drawing changes? |
| Graphics | Tensioned fabric on a frame against printed flex taped to a panel | What is it printed on, and how is it fixed to the wall? |
| Dismantle | Frequently missing from the cheaper quote entirely | Is clearing the stand inside the organiser's window in this price? |
| Furniture | Hired against fabricated, and a four-piece package against an eight-piece one | List the pieces, and say which are hired and which are built |
| Installation | A day crew against a night-shift crew, with or without supervision | How many crew, on which shift, and who supervises them? |
Work down the list before you negotiate. A gap explained is usually a gap you no longer want closed, because you now know which stand you are buying.
| Installation and dismantle left as "to be advised" | ₹45,000 |
|---|---|
| Lighter board in the structure, with an exposed edge instead of a finished one | ₹62,000 |
| Printed flex taped to panels instead of tensioned fabric on a frame | ₹38,000 |
| Six aimed spots instead of fourteen, and no backlit panel | ₹26,000 |
| Carpet laid straight on the hall floor instead of a raised platform with cable management | ₹30,000 |
| A four-piece hired furniture package instead of eight pieces | ₹17,000 |
| Total difference between the two quotes | ₹2,18,000 |
Illustrative, built by making six substitutions to the 54 sq.m example above. The higher quote is ₹9,74,000 and the lower is ₹7,56,000; the difference is ₹2,18,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.
Where to cut, and where cutting costs more
Every quote contains lines you can delete and lines that merely look deletable. Telling them apart is the single most useful skill in exhibition procurement, because the second kind does not announce itself — it simply reappears later, larger, as a problem rather than as a line item.
One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.
Both halves of the distinction follow. First the lines that genuinely are optional — and these are usually the bigger numbers, which is the happy part of this section. Then, in the table, the ones that only look optional, each with its consequence spelled out.
- Giveaways in quantity, which measure footfall rather than interest
- Wall height above the sightline, which costs material and is read by nobody
- Backlighting on every panel, rather than on the one panel you want looked at
- A model, a mock-up or a prop that duplicates something the product already demonstrates
- Working shutters and locks on storage that nobody will see
- Veneer or PU paint where a good laminate reads identically from the aisle
| Line item | Why it reads as padding | The consequence |
|---|---|---|
| One spare panel for the hero wall | It will be fine | A scuffed hero panel is the one thing every photograph of the stand will show |
| Packing crates and transport cover | It travelled fine last time | Once is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day |
| A single project manager | Each vendor manages themselves | Then every gap between vendors is yours to discover, usually at eight o'clock on the first morning |
| A graphics proofing round | The artwork is final | Large-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall |
| Pre-build at the workshop | The crew can assemble it on site | Site is where there is no spare panel, no saw and no time. A dry run finds the problem while it is still cheap |
| Storage between shows | We will decide after this one | "After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable |
| Supervision during build-up | The crew knows the drawing | When a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window |
The common thread is that each one is cheap in a workshop and expensive at a venue. Timing, not quality, is what makes them worth keeping.
Delete what nobody will look at. Keep what everybody will walk on, touch, or need power from.
What changing your mind costs, stage by stage
Almost every overrun we see has the same shape. The quote was accurate; the decisions arrived late. A change costs nothing while nothing has been drawn to scale, and it costs a night shift once the stand is in the hall — the same change, twenty times the price.
So the cheapest thing you can buy is time at the front. A 54 sq.m build runs to 5 weeks on our schedule — 3 weeks base plus 2 for the area — and a premium finish or a double-decker element adds 2 and 2 weeks respectively. None of that window is spare, which is exactly why a decision taken in week one is free and the same decision in week four is not.
There are two defences, and both are administrative. One approver on your side, with the authority to sign the drawing and the finish schedule. And an agreed variation process: who asks, who approves, and whether the price is confirmed before the work happens. Both cost nothing and both prevent the expensive version of this table.
| Point in the programme | Cost of a change here | The reason |
|---|---|---|
| While the concept is being designed | Time, and nothing else | Nothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it |
| After materials are ordered | The material, plus its replacement | Board, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts |
| In production | The labour already spent, plus the labour to redo it | A fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved |
| After graphics go to print | A full reprint of the affected panel | Large-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment |
| After dispatch | Freight both ways, and a hole in the build schedule | The panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience |
| During build-up | Night-shift labour, and whatever can be improvised | There is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you |
Read the first row twice. It is the only stage at which a change is free, and it is the stage exhibitors rush through fastest.
Exhibiting soon? Let's build your stall.
Planning a budget backwards from a total
If the total is already fixed, plan from the total. It works better than designing first and pricing afterwards, and it forces the one calculation most exhibitors postpone: how much of this money is never going to reach the stand, because it belongs to the organiser, the airline, the hotel and the print shop.
After the list of costs that never reach a stall quote comes a worked allocation of ₹15,00,000, offered as an illustration rather than as a standard, because no standard exists that we could honestly cite. Read it from the bottom: ₹75,000 unallocated, ₹1,50,000 of costs no stand quote will carry, and ₹13,50,000 — 90% — left for the stand itself.
The build line comes to ₹6,75,000, which buys 75 sq.m of structure at the bottom of the published band and 37.5 sq.m at the top. Hold that against the stall you have booked. If the booked area is larger than 75 sq.m, the arithmetic is telling you to use a system build rather than a custom one, and it is telling you now rather than in week three.
- Lead-capture devices, the data connection, and somewhere to charge them
- Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
- Promoters, hostesses or interpreters, if your visitors need them
- Travel, hotels and local transport for everyone who will stand on the stand
- Product freight — the goods on display travel separately from the stand that holds them
- Photography and video of the finished stand, which is the asset you use all year
- Exhibitor badges, extra passes and vehicle parking
- Insurance on goods in transit and on the stand itself
| Allocation | Share | Illustrative amount |
|---|---|---|
| Stand build — structure, joinery and finish | 45% | ₹6,75,000 |
| Graphics, lighting and AV | 20% | ₹3,00,000 |
| Flooring and furniture | 10% | ₹1,50,000 |
| Transport, installation and dismantle | 15% | ₹2,25,000 |
| Your own show costs — travel, staffing, collateral, hospitality | 5% | ₹75,000 |
| Contingency, held back rather than allocated at briefing | 5% | ₹75,000 |
Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹15,00,000. The first four rows, ₹13,50,000, are what a stand builder quotes against. GST sits on top.
What the area actually gives you
Before comparing prices per square metre, look at what a square metre does. Our planner's ratios are simple: storage at 10% up to 18 sq.m and 15% beyond it, a default 5% for a meeting corner, and the balance as display. Apply them and most stall-size arguments resolve themselves.
One column deserves more attention than it gets: how many people physically fit. Display area divided by 2.5 gives the number of visitors who can be in the stand simultaneously, and that figure is a ceiling on everything your marketing plan promises.
Lead time belongs in a cost conversation because it is a cost. 3 weeks is the base, plus 1 week from 24 sq.m and 2 from 54 sq.m, with 2 more for a premium finish and 2 for a double-decker. Book inside those windows and the same stand costs more, because the work moves on to shifts that cost more.
| Stall size | Usable display | Storage | Staff on the stand | Visitors it holds | Weeks to build |
|---|---|---|---|---|---|
| 9 sq.m | 7.6 sq.m | 0.9 sq.m | 2 | 3 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
| 72 sq.m | 57.6 sq.m | 10.8 sq.m | 8 | 23 | 5 |
| 100 sq.m | 80 sq.m | 15 sq.m | 12 | 32 | 5 |
Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.
Payment, milestones and what each one should mean
There is no universal payment schedule in this industry and anybody presenting one is describing their own terms rather than a standard. So the useful discussion is not about the percentages but about what each payment should buy, and that can be specified precisely.
Hold to a single principle and the rest follows: no payment stage without a deliverable attached. The deliverables are obvious once you ask for them — the approved drawing set, the materials on the floor, the dry assembly, the finished stand — and each one is something you or a colleague can physically verify.
One more thing belongs in this conversation, because it is where disputes actually start: the variation process. Agree, before the first payment, who on your side approves a change, in what format, and whether its price is confirmed before the work begins. Unpriced variations are where almost every uncomfortable conversation about an exhibition invoice begins, and they are the one budget risk that is entirely administrative to remove.
01
Tie every stage to something you can see
A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.
02
Write the variation process down before there is a variation
Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.
03
Keep the organiser's bills on a separate line
Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.
04
Ask what happens if the show moves
Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.
05
Name one approver on your side
One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.
06
Confirm what the first payment actually unlocks
Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.
Agree how changes are priced before there is a change to price.
Spreading the cost over a programme of shows
A single-show cost is the wrong number for anybody exhibiting more than once a year. What matters is the average across the programme, and that average drops a long way after the first show — provided the first stand was conceived as something that would come down in panels rather than in pieces.
The worked example here is show two, with the same structure. Reprint the graphics, refurbish what the first show marked, pay for storage in between, and pay transport and installation again. ₹2,96,000 rather than ₹9,74,000: 30% of the first outing, with ₹6,78,000 of the original build simply not purchased again.
Extended to a third show in the table, the average per show becomes about ₹5,22,000, against ₹9,74,000 for the first outing alone: a 46% fall. No negotiation produces that. It comes entirely from a design decision taken before the first panel was cut, which is why it has to be asked for at briefing stage.
Three conditions have to hold, and they are all specification rather than luck. The structure has to be modular, dismantled in panels rather than broken down. The graphics have to be a separate layer — fabric on a frame, reprinted rather than rebuilt. And somewhere has to store it, which is a real cost and appears as a line in the example rather than being quietly ignored.
| Edition | Cost of this one | Total so far | Average per show |
|---|---|---|---|
| Show 1 — the first build | ₹9,74,000 | ₹9,74,000 | ₹9,74,000 |
| Show 2 — same structure, new graphics | ₹2,96,000 | ₹12,70,000 | ₹6,35,000 |
| Show 3 — same structure, new graphics | ₹2,96,000 | ₹15,66,000 | ₹5,22,000 |
Illustrative, built from the two worked examples on this page: ₹9,74,000 for the first build and ₹2,96,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.
| Graphics reprinted for the new show and the new message | ₹67,000 |
|---|---|
| Refurbishment — replaced panels, touch-up paint, relaminating what is marked | ₹45,000 |
| Storage of the structure between the two shows | ₹24,000 |
| Transport, both ways | ₹68,000 |
| Installation, crew and dismantle | ₹92,000 |
| Indicative second-show total, before GST | ₹2,96,000 |
Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹9,74,000, this is 30%, so ₹6,78,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.
Where to save, and where the saving shows
Spend on the elements visitors notice in the first three seconds from the aisle — the brand wall, the lighting and the hero product position — and save on hidden structure, storage and anything above the sightline.
Three habits cut more than any negotiation does — reuse the frame, hire rather than build the furniture, and keep graphics on fabric so next year's edition costs a reprint instead of a rebuild.
Cut structure before light. Visitors cannot admire quality they are standing in the shadow of, and lighting costs a fraction of the thing it makes visible.
Read the list with the calendar in mind. These are savings at briefing stage and costs at any stage after it — a reprint instead of a rebuild saves money only if the design anticipated it, and a simpler footprint saves money only if the cutting list has not been written yet.
- Upgrade a shell scheme instead of building raw space, for stalls under 18 sq.m
- Freeze the layout once and leave it frozen, because the expensive version of every saving is a change
- Book early: rush charges and night-shift labour are avoidable rather than inevitable
- Print one hero graphic properly and keep everything around it plain
- Build the storage wall out of the back of the display wall, so one structure does two jobs
- Share a lorry with your own product freight, if the dates allow it
- One strong message instead of five competing ones, which is cheaper and also works better
Where quotes go wrong
Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: sub-contracted builds with no quality control. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.
The second is scope that was never written down. If the quote does not name the finish, the lighting count and the flooring type, two vendors are not quoting the same stand and the comparison is meaningless.
And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.
- Non fire-retardant materials rejected at the venue
- Late arrival on site that eats into build-up time
- Hidden extras for electrical, carpet or dismantling
- Sub-contracted builds with no quality control
Get an accurate price
Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised double-decker stalls quote within about two days.
We design free with every confirmed fabrication order, fabricate in our own workshops, prepare the organiser drawings and approvals, and put one project manager on the job from brief to dismantle. Quoted per project; ideal for 72 sq.m and above.
Whoever you end up using, ask for three things in writing: the itemisation, the exclusions, and how a change gets priced. Those three answers are what turn a number into a price you can plan around, and any vendor worth using will give them without being pressed.
Frequently asked questions
Who pays the organiser for space and power?+
You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.
How much contingency should I hold back?+
Enough to absorb one change you have not thought of yet. The illustrative allocation on this page holds back ₹75,000 of ₹15,00,000, which is a planning habit rather than a published rule — set your own figure, but set it before briefing, because a contingency invented afterwards is just an overrun.
When is payment due?+
Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.
How far ahead should I book to avoid rush costs?+
Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.
What does a 54 sq.m stand cost?+
Using the published band, the structure alone is ₹4,86,000–₹9,72,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹9,74,000 before GST — about ₹18,037 per sq.m — for a mid-finish custom stand.
Does a bigger stand cost proportionally more?+
The build line scales with area at the published band — 75 sq.m of structure at ₹9,000 per sq.m is ₹6,75,000, and the same money buys 37.5 sq.m at ₹18,000. The lines that do not scale in a straight line are transport, crew and supervision, so ask your builder which of your lines move with area and which are closer to fixed.
Is GST included in double-decker stalls quotes?+
A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.
What is never included in a stall quote?+
Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,50,000 of ₹15,00,000 — small enough to forget and large enough to hurt.
Why do two quotes for the same brief differ so much?+
Almost always because they describe two different stands. On the illustrative 54 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹2,18,000, or 22% of ₹9,74,000. Ask both vendors to itemise against the same written scope and the gap explains itself.