Exhibition Stall Design Cost in India: 2026 Price Guide

Exhibition stall design priced honestly: the published band, the lines a quote must name, why two quotes for one brief differ, and what the same money buys at different sizes.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

Design is included free with fabrication orders; standalone design from ₹25,000. What moves the number for exhibition stall design is number of concept options and revision rounds, depth of 3D work (stills, 360° views or walkthrough video) and technical drawing detail required by the organiser — and what makes two numbers incomparable is scope that nobody wrote down. Send the show, the city, the dates, the area, the open sides and two reference images, and ask for the quote itemised line by line.

Key takeaways

  • A lump sum cannot be compared with anything. Two itemised quotes against one written scope can.
  • Four lines are missing from most cheap quotes: the return journey, the crew, the dismantle, and the tax.
  • The cheapest stand you will ever build is the second outing of one you already own.
  • Spend longer at concept stage than feels comfortable. It is the only point at which a change costs nothing but time.
  • Design is included free with fabrication orders; standalone design from ₹25,000.
  • The biggest cost drivers are number of concept options and revision rounds and depth of 3D work (stills, 360° views or walkthrough video).

Typical exhibition stall design price ranges

Our designers turn your brand, products and visitor goals into a stall layout that draws footfall, hosts meetings and photographs beautifully.

Design is included free with fabrication orders; standalone design from ₹25,000. Where the show is matters less than most exhibitors expect. The fabrication cost barely moves between cities; what moves is transport distance from the workshop, how scarce crews are during a busy show week in that city, and whether the organiser's build-up window is tight enough to force a night shift.

Custom fabrication is published at ₹9,000–₹18,000 per sq.m. Below that sit system builds, where the frame is reused instead of cut fresh, and below those an upgraded shell scheme. Read those as three different bargains rather than three qualities: you are trading how bespoke the stand looks against how much of it you still own after the show.

One thing worth noticing about that band before we go further: ₹18,000 is exactly twice ₹9,000. A build budget therefore covers twice the area at the bottom of the band as at the top, and the single largest decision in an exhibition budget is which of those two stands you would rather have. There is no general answer. A product that has to be touched wants area; a brand that has to be believed wants finish.

Construction typeWhere it sits on costWhat you still own afterwardsTypical fit
Shell scheme upgradeLowestGraphics only9–18 sq.m, first-time or budget exhibitors
Octanorm / system buildLowFrame and graphics9–36 sq.m, exhibitors doing several shows a year
Modular with custom graphicsMediumFrame, graphics, furniture18–54 sq.m, repeat exhibitors wanting a branded look
Custom wooden build₹9,000–₹18,000/sq.mLimitedAny size where the stand must look bespoke
Double-deckerQuoted per projectStructure, with engineering72 sq.m and above, when meetings would eat display space

Only the custom band is a published per-sq.m rate. The others are positions relative to it, because what they cost depends on how much of the frame already exists.

The variables doing the work

A quote is not a number, it is a set of decisions you have already made without realising it. These are the variables doing the work, and each one is negotiable before the brief goes out and expensive afterwards.

Area and open sides dominate everything else. A stand with three open sides needs three finished faces, three lighting runs and more staff than an inline stand of the same area, so it costs more per square metre even before any design decision is made.

Two more variables carry most of the remaining money: how long you have given the job, and what the surfaces are made of. A 36 sq.m stand needs 4 weeks on our schedule; booked inside that, the same work happens at night-shift rates. And finish is where budgets quietly disappear, because the gap between a convincing laminate and a veneer costs real money and is invisible from two metres away.

  • Technical drawing detail required by the organiser
  • Whether design is bundled with fabrication
  • Number of concept options and revision rounds
  • Depth of 3D work (stills, 360° views or walkthrough video)
  • Whether furniture is hired for the week or fabricated to keep
  • How much of the stand has to be new, and how much can come out of storage
  • The number of approval rounds before the drawing is frozen
  • How far the workshop is from the venue, and whether a lorry can reach the hall door
You cannot compare two quotes until both describe the same stand.

What an exhibition stall design quote should itemise

A professional quote lists every element separately so you can compare vendors fairly and remove items you do not need. A lump sum hides which of these you are about to pay for twice — or not at all.

The exclusions are more informative than the inclusions. Transport back from the venue, the crew who put it up, the dismantle inside the organiser's window, the electrical fittings and the tax: ask about those five by name, because a quote rarely mentions what it has left out.

Three small lines are worth more than their value on design-led work: material certification, the organiser submission, and a named project manager with a telephone number. Each is cheap to include and painful to arrange once the hall has opened its doors to build-up.

  • Brand-led concept in 48 hours
  • Photoreal 3D renders and walkthroughs
  • Visitor-flow and meeting-zone planning
  • Organiser-compliant technical drawings
  • Transport to the venue and the return leg, stated separately
  • Night-shift or overtime labour, if the build-up window forces it
  • Graphics proofing, and what happens if a panel has to be reprinted
  • Storage of reusable elements after the show, and for how long
  • Dismantle and clearing the stand inside the organiser's window
  • GST, shown as a figure rather than as a footnote

Thirty-six square metres, costed properly

An example is worth more than a range. This one is 36 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.

At ₹6,73,000 this stand works out at roughly ₹18,694 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹3,49,000, a little more than the fabrication itself.

Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 36 sq.m of structure is ₹6,48,000 rather than ₹3,24,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.

Worked example · Thirty-six square metres, mid finish, three sides open
Structure and joinery (36 sq.m × ₹9,000)₹3,24,000
Lighting — track, aimed spots and backlit panels₹54,000
Raised flooring and carpet₹43,000
Furniture — counters, seating, planters₹38,000
Graphics — brand wall, tensioned fabric and vinyl₹97,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative total, before GST₹6,73,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

What the same budget buys at different sizes

This is the comparison most briefs skip. At every size, the band gives you a lower figure and an upper one, and the gap between them is not padding: it is finish, light, floor and detail. The last column names what it buys, so you can decide whether you want it more than you want the extra square metres.

Notice the symmetry in the middle two columns: the spread at any size is the lower figure again, because ₹18,000 minus ₹9,000 is ₹9,000. So the question "should I take more area or better finish?" is, at the published band, an exactly even trade. That is unusually clean, and it makes the decision a strategic one rather than an arithmetical one.

The honest rule is that area serves activity and finish serves belief. Demonstrations, queues, meetings and products that must be touched all need floor, and no amount of veneer compensates for a stand people cannot get into. A launch, a new category entry, or a brand that has to look established needs finish, and does better with a smaller, denser, well-lit stand than with a larger plain one.

Stall sizeBuild at ₹9,000/sq.mBuild at ₹18,000/sq.mWhat the difference buys
9 sq.m₹81,000₹1,62,000Better print, aimed light instead of clip lamps, and an edge finish that survives the week
12 sq.m₹1,08,000₹2,16,000A laminate that survives handling, a lighting track, and a counter that locks
24 sq.m₹2,16,000₹4,32,000A branded floor, a demo counter that actually works, and a spare hero panel
54 sq.m₹4,86,000₹9,72,000Double-height brand elements, integrated AV and a storage wall that hides the cartons
72 sq.m₹6,48,000₹12,96,000Architectural form — curves, a ceiling element, and a stand that reads as a building

These columns are the structure line and nothing else — the same line that is ₹3,24,000 in the 36 sq.m example above. Everything else on that example is additional at every size here.

Where the difference between two prices lives

The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.

Here is the gap itemised, on the same illustrative 36 sq.m stand. Six ordinary substitutions — none of them dishonest, all of them things a vendor might assume — take ₹6,73,000 down to ₹5,23,000. That is ₹1,50,000, or 22% of the total, without anybody quoting a different margin or a different standard of workmanship.

The remedy is unglamorous. Write the specification yourself — board, graphics medium, number of fixtures, flooring type, furniture list, crew and shift — and send the same page to everybody. The prices that come back will be close together, and you will be choosing a vendor rather than guessing at a scope.

Line that differsWhy the two figures are not the sameThe question that settles it
LightingFourteen aimed fixtures against six, or against none at allHow many fixtures, of what type, aimed at what?
ElectricalThe organiser's power charge, the stand's own wiring, or neitherWho pays the organiser, and who wires the stand?
TaxesOne total is before tax and the other after itGive me both the pre-tax and the post-tax figure
Drawings and approvalsOne vendor is preparing the organiser submission; the other expects you toWho prepares the drawings, and who submits them?
Who builds itOne quote comes from the workshop; the other from somebody who will find oneWhose workshop is it, and may we see a build in progress?
DismantleFrequently missing from the cheaper quote entirelyIs clearing the stand inside the organiser's window in this price?
FurnitureHired against fabricated, and a four-piece package against an eight-piece oneList the pieces, and say which are hired and which are built
TransportOne leg, both legs, or quietly left outIs the return journey inside this figure?

Work down the list before you negotiate. A gap explained is usually a gap you no longer want closed, because you now know which stand you are buying.

Worked example · Itemising the gap between ₹6,73,000 and ₹5,23,000
Six aimed spots instead of fourteen, and no backlit panel₹18,000
Carpet laid straight on the hall floor instead of a raised platform with cable management₹21,000
A four-piece hired furniture package instead of eight pieces₹12,000
Installation and dismantle left as "to be advised"₹31,000
Lighter board in the structure, with an exposed edge instead of a finished one₹42,000
Printed flex taped to panels instead of tensioned fabric on a frame₹26,000
Total difference between the two quotes₹1,50,000

Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

What is optional, and what only looks optional

Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.

The test is simple: ask what happens if this line is not there. If the answer is "nothing, nobody would notice", delete it with confidence. If the answer is "we deal with it on site", you have not removed a cost, you have moved it to the most expensive place and time available, and attached a risk to it.

The list immediately below is the first kind: real options, which can go without anybody noticing. The table after it is the second kind — lines that look like fat and are not, with what actually happens when each one is cut. Start with the list, because the genuinely optional items on an exhibition stall design quote are usually larger than the false economies and far less painful to remove.

  • Wall height above the sightline, which costs material and is read by nobody
  • Veneer or PU paint where a good laminate reads identically from the aisle
  • Fabricated furniture, where hired furniture would have been collected afterwards anyway
  • A full-height closed meeting room on a small stand, where a screened corner does the same work
  • Backlighting on every panel, rather than on the one panel you want looked at
  • A ceiling or hanging element, unless the stand has to be found from across the hall
LineWhy it looks optionalWhat actually happens if you cut it
One spare panel for the hero wallIt will be fineA scuffed hero panel is the one thing every photograph of the stand will show
The cable and socket count on the drawingThat is site detailSite detail becomes a visible extension lead across the floor of a stand you paid to look expensive
Raised flooringCarpet on the hall floor costs lessThe cables then run under the carpet, and every visitor finds them with their feet
Supervision during build-upThe crew knows the drawingWhen a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window
Dismantle and clearanceThe show is over by thenThe organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards
A graphics proofing roundThe artwork is finalLarge-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost

If the budget genuinely will not stretch, cut from the list below this table instead. These lines are the ones that cost more when they are missing.

The venue is the most expensive shop in India, and it only opens when you have run out of time.

The price of a late decision

Changes are where budgets actually overrun, and they do not appear on any quote. What makes them expensive is timing rather than magnitude: moving an entrance is a conversation at concept stage, a redraw after sign-off, a rebuild in production, and an improvisation at the venue.

This is why the design stage deserves more of your time than it usually gets. 4 weeks is our schedule for 36 sq.m — 3 weeks base plus 1 for the area — and the hours you spend arguing about the layout in week one are the cheapest hours in the whole programme. A premium finish adds 2 weeks and a double-decker another 2, so the window is longer than most briefs assume and still not long enough for a change of mind in production.

Two habits keep this under control. Name one approver on your side, so that a change is a decision rather than a negotiation. And ask, before the first payment, how variations are priced and approved — in writing, with a figure confirmed before work starts, rather than appearing on a final invoice as a surprise.

Point in the programmeCost of a change hereThe reason
While the concept is being designedTime, and nothing elseNothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it
After design sign-off, before productionA redraw and a requoteDrawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you
After materials are orderedThe material, plus its replacementBoard, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts
After graphics go to printA full reprint of the affected panelLarge-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment
After dispatchFreight both ways, and a hole in the build scheduleThe panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you

Nothing in this table is a penalty. Each row is simply work that has to be done twice, plus whatever the first attempt cost in material.

Exhibiting soon? Let's build your stall.

Or use the full form

Planning a budget backwards from a total

If the total is already fixed, plan from the total. It works better than designing first and pricing afterwards, and it forces the one calculation most exhibitors postpone: how much of this money is never going to reach the stand, because it belongs to the organiser, the airline, the hotel and the print shop.

What follows is the list of costs no stand builder will quote you, and then one way to split a total, shown against ₹10,00,000. Treat it as an illustration and not as a benchmark — there is no published standard and we are not inventing one. Its useful feature is the last two lines: ₹9,00,000 is what a builder quotes against, ₹1,00,000 is yours alone, and ₹50,000 of the total is held back rather than committed.

In this illustration the build line is ₹4,50,000: 50 sq.m of custom structure at ₹9,000 per sq.m, or 25 sq.m at ₹18,000. That single comparison — booked area against affordable area — settles the construction-type question before anybody draws anything, and it is a far less painful conversation to have at this stage than after a concept has been approved.

  • Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
  • Lead-capture devices, the data connection, and somewhere to charge them
  • The organiser's power connection, charged against the load you declare
  • Product freight — the goods on display travel separately from the stand that holds them
  • Exhibitor badges, extra passes and vehicle parking
  • Promoters, hostesses or interpreters, if your visitors need them
  • The cost of your own team being away from their desks for the build-up and the show
  • Space rental, invoiced to you by the organiser rather than by your stand builder
AllocationShareIllustrative amount
Stand build — structure, joinery and finish45%₹4,50,000
Graphics, lighting and AV20%₹2,00,000
Flooring and furniture10%₹1,00,000
Transport, installation and dismantle15%₹1,50,000
Your own show costs — travel, staffing, collateral, hospitality5%₹50,000
Contingency, held back rather than allocated at briefing5%₹50,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.

What you get for the money at each size

Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.

Read the visitor column as a constraint rather than as information. It is display area divided by 2.5, and if your footfall expectation implies more people in the stand at once than that, the thing standing in the way is the floor plan, not the campaign.

The build-weeks column is a budget column in disguise. Our schedule is 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for a premium finish and +2 for a double-decker. Compressing it does not reduce the work; it relocates the work to night shifts and rush rates.

Area bookedDisplayStorageStaffVisitors at onceLead time
9 sq.m7.6 sq.m0.9 sq.m233
18 sq.m15.3 sq.m1.8 sq.m263
24 sq.m19.2 sq.m3.6 sq.m374
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Milestones that correspond to something

There is no universal payment schedule in this industry and anybody presenting one is describing their own terms rather than a standard. So the useful discussion is not about the percentages but about what each payment should buy, and that can be specified precisely.

The principle is that a payment stage should correspond to a deliverable rather than to a date. Approved drawings exist or they do not. Materials are on the shop floor or they are not. A pre-build can be walked around or it cannot. The stand is standing at the venue or it is not. Each of those is checkable; "end of week two" is not.

One more thing belongs in this conversation, because it is where disputes actually start: the variation process. Agree, before the first payment, who on your side approves a change, in what format, and whether its price is confirmed before the work begins. Unpriced variations are where almost every uncomfortable conversation about an exhibition invoice begins, and they are the one budget risk that is entirely administrative to remove.

  1. 01

    Name one approver on your side

    One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.

  2. 02

    Tie every stage to something you can see

    A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.

  3. 03

    Confirm what the first payment actually unlocks

    Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.

  4. 04

    Keep the organiser's bills on a separate line

    Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.

  5. 05

    Write the variation process down before there is a variation

    Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.

  6. 06

    Ask for the schedule inside the quote

    Payment terms belong in the same document as the itemised scope, not in a separate message afterwards. If the stages and the deliverables are written on one page, you can see whether they line up — and if they do not, that is a conversation to have before you sign rather than in week three.

Agree how changes are priced before there is a change to price.

How the cost per show falls across a year

Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.

The worked example here is show two, with the same structure. Reprint the graphics, refurbish what the first show marked, pay for storage in between, and pay transport and installation again. ₹2,15,000 rather than ₹6,73,000: 32% of the first outing, with ₹4,58,000 of the original build simply not purchased again.

Across three editions, in the table, the running average goes ₹6,73,000, ₹4,44,000, ₹3,67,667 — down 45% from the first show to the three-show average. Nothing in that was haggled; the only decision involved was specifying a structure that would come apart and finding somewhere to keep it.

It depends on three things being true. A modular structure that comes apart without damage; graphics as a removable layer rather than as part of the wall; and storage, which costs money and is therefore a line in the example rather than an assumption. Miss any one and the second show is close to the price of the first.

ShowCost this showCumulativeAverage per show so far
Show 1 — the first build₹6,73,000₹6,73,000₹6,73,000
Show 2 — same structure, new graphics₹2,15,000₹8,88,000₹4,44,000
Show 3 — same structure, new graphics₹2,15,000₹11,03,000₹3,67,667

Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · What the second show carries, and what it does not
Graphics reprinted for the new show and the new message₹48,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹32,000
Storage of the structure between the two shows₹18,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative second-show total, before GST₹2,15,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

How to reduce cost without looking cheap

Spend on the elements visitors notice in the first three seconds from the aisle — the brand wall, the lighting and the hero product position — and save on hidden structure, storage and anything above the sightline.

Three habits cut more than any negotiation does — reuse the frame, hire rather than build the furniture, and keep graphics on fabric so next year's edition costs a reprint instead of a rebuild.

Cut structure before light. Visitors cannot admire quality they are standing in the shadow of, and lighting costs a fraction of the thing it makes visible.

The savings that work are the ones decided early. Booking inside the lead time, redesigning after sign-off and adding scope in production are not savings at all — they are the three most reliable ways to spend more than you planned. Every item in the list below has to be chosen before the brief is frozen to be worth anything.

  • Hire furniture and planters rather than fabricating them for a week
  • Reuse a modular structure across several shows — the second outing costs a fraction of the first
  • Build the storage wall out of the back of the display wall, so one structure does two jobs
  • Hire the AV for the week instead of buying a screen you will then have to store
  • Upgrade a shell scheme instead of building raw space, for stalls under 18 sq.m
  • One strong message instead of five competing ones, which is cheaper and also works better
  • Print one hero graphic properly and keep everything around it plain

The three expensive failures

The three failures that cost exhibitors real money on exhibition stall design are all avoidable at quoting stage. Renders that cannot be built within the budget. That is settled at quoting stage rather than at the venue, and the fix is to ask what the quote actually specifies, and who will physically do the work, before you compare totals.

The second is scope that was never written down. If the quote does not name the finish, the lighting count and the flooring type, two vendors are not quoting the same stand and the comparison is meaningless.

And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.

  • Designs that ignore organiser height and setback rules
  • No material or finish specification, so the build looks different from the render
  • Renders that cannot be built within the budget

Getting an exhibition stall design quote you can rely on

Share your event name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept and an itemised exhibition stall design quote, usually within 48 hours.

What we do: free 3D design with every confirmed fabrication order, fabrication in our own workshops, organiser drawings and approvals handled, and a single project manager from brief to dismantle. Design is included free with fabrication orders; standalone design from ₹25,000.

One closing piece of advice that applies to every vendor including us. Ask for the itemised scope, ask explicitly what is excluded, and ask how variations are priced. A supplier who answers all three without hesitation is telling you something useful about how the build will go.

Frequently asked questions

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 36 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹1,50,000, or 22% of ₹6,73,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

How far ahead should I book to avoid rush costs?+

Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.

Is GST included in exhibition stall design quotes?+

A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.

Does a bigger stand cost proportionally more?+

The build line scales with area at the published band — 50 sq.m of structure at ₹9,000 per sq.m is ₹4,50,000, and the same money buys 25 sq.m at ₹18,000. The lines that do not scale in a straight line are transport, crew and supervision, so ask your builder which of your lines move with area and which are closer to fixed.

When is payment due?+

Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

Is the cheapest quote ever the right one?+

Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.

Do you charge separately for design?+

3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.

How can I lower the cost without the stand looking cheap?+

Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.