
Fabrication
Exhibition Stand Builders
Our build crews handle build-up, organiser coordination, electrical, and dismantling so you arrive to a finished stand.
What's included
Our exhibition stand builders service
Our build crews handle build-up, organiser coordination, electrical, and dismantling so you arrive to a finished stand. What you receive is a complete stand — structure, graphics, lighting and flooring — handed over ready to occupy. Every panel is trial-fitted and every circuit tested in the workshop before dispatch, and the crew carries spare laminate, graphics and lamps to site.
Exhibition Stand Builders sits in our fabrication practice, alongside stall fabrication, custom exhibition booths, modular exhibition stalls. Most projects combine two or three of those, which is why we quote them as one scope with one project manager rather than as separate vendors.
- Dedicated project manager
- Night-shift build-up crews
- Electrical and safety compliance
- Same-day dismantle and clearance
Price guide: Included with every fabrication order.

How exhibition stand builders works
01
Drawing release and material order
The drawing set becomes a cutting list, a print schedule and a lighting order, all raised together. One late delivery is what turns a comfortable build into a night shift.
02
Workshop build
Carpentry, metalwork, spray finishing and large-format printing all happen in-house. Keeping them under one roof is what lets us hold a date — there is no sub-contractor queue between the joinery and the paint booth.
03
Pre-assembly and quality check
Before anything is loaded, the stand is stood up in the workshop: panels numbered, graphics trial-fitted, circuits tested and lamps aimed. Problems get found here, where there is time to fix them.
04
Install, handover and dismantle
On site the crew builds to the drawing, tests the electricals, cleans and hands over. After the show the same crew strikes the stand and clears the space inside the dismantle window.
Install is done by the crew that dry-built the stand, so an unfamiliar venue costs us access time, not assembly time.
Who this is for
Choose this when the stand has to match the approved visual, survive the full run of the show and be struck without drama. Splitting the build across three suppliers is where most of that goes wrong.
What exhibition stand builders costs
Included with every fabrication order. Beyond that headline, the variables that actually move an exhibition stand builders quote are stall area in sq.m, number of open sides and overall height, wood-and-laminate versus system construction and graphic area and print finish. A quote itemised against those lines is the only way to tell a cheap stall from an incomplete one.
Cost drivers
- stall area in sq.m
- number of open sides and overall height
- wood-and-laminate versus system construction
- graphic area and print finish
- lighting count and LED or screen hire
- flooring type
- distance from workshop to venue
- build-up window and whether night shifts are needed
Stall sizes and lead times
The space plan below uses the same formula as our stall planner, so the numbers on this page and the numbers the tool gives you agree. Storage takes 10% of the area up to 18 sq.m and 15% above it, a meeting corner takes 5% unless you are hosting meetings, and the remainder is display.
Space, staffing and lead time by stall size
| Stall size | Footprint | Likely layout | Display | Staff | Visitors at once | Build weeks |
|---|---|---|---|---|---|---|
| 9 sq.m | 3 × 3 m | Inline or corner | 7.6 sq.m | 2 | 3 | 3 |
| 18 sq.m | 3 × 6 m | Inline or corner | 15.3 sq.m | 2 | 6 | 3 |
| 36 sq.m | 6 × 6 m | Corner or three-side open | 28.8 sq.m | 4 | 11 | 4 |
| 54 sq.m | 6 × 9 m | Corner or three-side open | 43.2 sq.m | 6 | 17 | 5 |
| 72 sq.m | 6 × 12 m | Three-side open or island | 57.6 sq.m | 8 | 23 | 5 |
| 100 sq.m | 10 × 10 m | Three-side open or island | 80 sq.m | 12 | 32 | 5 |
Materials and equipment
The working palette is 18 mm and 12 mm MDF with laminate or spray finish, aluminium extrusion and octanorm systems, fire-retardant treated ply and tensioned fabric and vinyl graphics, extended with vinyl, carpet and raised wooden flooring and LED spots, track lights and backlit boxes when the design or the venue requires it. Specification is a durability decision as much as a visual one — what looks identical on day one often does not after three builds.
What we work in
- 18 mm and 12 mm MDF with laminate or spray finish
- aluminium extrusion and octanorm systems
- fire-retardant treated ply
- tensioned fabric and vinyl graphics
- vinyl, carpet and raised wooden flooring
- LED spots, track lights and backlit boxes
What we need from you
Send these and we come back with a concept and an itemised exhibition stand builders quote — usually within 24 to 48 hours of a clear brief.
- final stall area, open sides and the organiser's stand plan
- approved design, or the brief for one
- logos and graphics in print-ready form
- the venue's build-up and dismantle timings
- any organiser restrictions on height, rigging or materials
01
Brief
Share stall size, expo and goals. We call within 2 hours.
02
3D Design
Photoreal concepts in 48 hours, revised until perfect.
03
Fabrication
Built and pre-assembled in our own workshops.
04
Install & Show
On-site crew builds, hands over and dismantles.








FAQ
Common questions
What does exhibition stand builders cost?+
Included with every fabrication order. The variables that move the figure are stall area in sq.m, number of open sides and overall height, wood-and-laminate versus system construction and graphic area and print finish.
Do you offer exhibition stand builders outside the metros?+
Yes. We cover 119 cities including every Tier 1 metro and more than a hundred Tier 2 exhibition cities, with crews working to the local organiser's schedule.
Is 3D design included?+
Yes, free with every confirmed fabrication order and revised until you approve it. Design-only projects are quoted per stall.
Is exhibition stand builders available as a standalone scope?+
Yes. It can be bundled with a full stall build or delivered on its own alongside another contractor's structure, with the interface agreed in writing first.
What exactly do I get with exhibition stand builders?+
A complete stand — structure, graphics, lighting and flooring — handed over ready to occupy. Dedicated project manager, Night-shift build-up crews, Electrical and safety compliance are all part of the scope.
Do you work with agencies and co-exhibitors?+
Yes. We work directly with brands, with event and creative agencies on white-label scopes, and with pavilion organisers coordinating multiple co-exhibitors under one structure.
What do you need from me to start?+
Final stall area, open sides and the organiser's stand plan, approved design, or the brief for one, logos and graphics in print-ready form and the venue's build-up and dismantle timings.
Can you handle organiser approvals?+
Yes. Stall drawings, electrical load details and structural documents are prepared and submitted as the organiser requires, and designs are checked against height, rigging and fire rules first.
Exhibition Stand Builders in Tier 1 cities
Exhibition Stand Builders in Tier 2 cities
Other fabrication services
All services
Related guides
Exhibiting soon? Let's build your stall.