
Fabrication
Wooden Exhibition Stalls
Classic wood-built stalls with laminate, veneer, PU paint and CNC jaali details.
What's included
Our wooden exhibition stalls service
Classic wood-built stalls with laminate, veneer, PU paint and CNC jaali details. What you receive is a built stall, installed, cleaned and working, then dismantled and cleared after the show. Nothing ships untested. Panels are trial-fitted, circuits loaded and finishes inspected before dispatch, and the crew travels with spares for the parts that get damaged in transit.
We group wooden exhibition stalls with stall fabrication, custom exhibition booths, modular exhibition stalls because they share a workshop, a crew and a schedule. Bundling them removes the gaps where multi-vendor projects usually fail.
- Ply and MDF construction
- Veneer and PU finishes
- CNC jaali patterns
- Built-in storage
Price guide: From ₹9,000 per sq.m.

How wooden exhibition stalls works
01
Drawing release and material order
Sign-off releases the job to production as a cutting list and a bill of materials. Ordering every element on the same day is what keeps the build off the critical path of a single late item.
02
Workshop build
Production runs in-house, which matters less for quality than for dates — when the joinery, the paint booth and the printer all answer to the same schedule, a promised handover holds.
03
Pre-assembly and quality check
Before anything is loaded, the stand is stood up in the workshop: panels numbered, graphics trial-fitted, circuits tested and lamps aimed. Problems get found here, where there is time to fix them.
04
Install, handover and dismantle
On site the crew builds to the drawing, tests the electricals, cleans and hands over. After the show the same crew strikes the stand and clears the space inside the dismantle window.
Install is done by the crew that dry-built the stand, so an unfamiliar venue costs us access time, not assembly time.
Who this is for
Wooden exhibition stalls suits exhibitors who want the build controlled end to end rather than split between a designer, a printer and a contractor. It is the right choice when the stall has to look the same as the render, hold up across several show days and come down cleanly.
What wooden exhibition stalls costs
From ₹9,000 per sq.m. Beyond that headline, the variables that actually move a wooden exhibition stalls quote are stall area in sq.m, number of open sides and overall height, wood-and-laminate versus system construction and graphic area and print finish. A quote itemised against those lines is the only way to tell a cheap stall from an incomplete one.
Cost drivers
- stall area in sq.m
- number of open sides and overall height
- wood-and-laminate versus system construction
- graphic area and print finish
- lighting count and LED or screen hire
- flooring type
- distance from workshop to venue
- build-up window and whether night shifts are needed
Indicative build cost by stall size
| Stall size | Footprint | At ₹9,000/sq.m | At ₹9,000/sq.m |
|---|---|---|---|
| 9 sq.m | 3 × 3 m | ₹81,000 | ₹81,000 |
| 18 sq.m | 3 × 6 m | ₹1,62,000 | ₹1,62,000 |
| 36 sq.m | 6 × 6 m | ₹3,24,000 | ₹3,24,000 |
| 54 sq.m | 6 × 9 m | ₹4,86,000 | ₹4,86,000 |
| 72 sq.m | 6 × 12 m | ₹6,48,000 | ₹6,48,000 |
| 100 sq.m | 10 × 10 m | ₹9,00,000 | ₹9,00,000 |
Size × the published rate band of ₹9,000–₹9,000 per sq.m. Indicative only — AV, furniture, flooring, transport and taxes are quoted on separate lines.
Stall sizes and lead times
The space plan below uses the same formula as our stall planner, so the numbers on this page and the numbers the tool gives you agree. Storage takes 10% of the area up to 18 sq.m and 15% above it, a meeting corner takes 5% unless you are hosting meetings, and the remainder is display.
Space, staffing and lead time by stall size
| Stall size | Footprint | Likely layout | Display | Staff | Visitors at once | Build weeks |
|---|---|---|---|---|---|---|
| 9 sq.m | 3 × 3 m | Inline or corner | 7.6 sq.m | 2 | 3 | 3 |
| 18 sq.m | 3 × 6 m | Inline or corner | 15.3 sq.m | 2 | 6 | 3 |
| 36 sq.m | 6 × 6 m | Corner or three-side open | 28.8 sq.m | 4 | 11 | 4 |
| 54 sq.m | 6 × 9 m | Corner or three-side open | 43.2 sq.m | 6 | 17 | 5 |
| 72 sq.m | 6 × 12 m | Three-side open or island | 57.6 sq.m | 8 | 23 | 5 |
| 100 sq.m | 10 × 10 m | Three-side open or island | 80 sq.m | 12 | 32 | 5 |
Materials and equipment
The working palette is 18 mm and 12 mm MDF with laminate or spray finish, aluminium extrusion and octanorm systems, fire-retardant treated ply and tensioned fabric and vinyl graphics, extended with vinyl, carpet and raised wooden flooring and LED spots, track lights and backlit boxes when the design or the venue requires it. Specification is a durability decision as much as a visual one — what looks identical on day one often does not after three builds.
What we work in
- 18 mm and 12 mm MDF with laminate or spray finish
- aluminium extrusion and octanorm systems
- fire-retardant treated ply
- tensioned fabric and vinyl graphics
- vinyl, carpet and raised wooden flooring
- LED spots, track lights and backlit boxes
What we need from you
Send these and we come back with a concept and an itemised wooden exhibition stalls quote — usually within 24 to 48 hours of a clear brief.
- final stall area, open sides and the organiser's stand plan
- approved design, or the brief for one
- logos and graphics in print-ready form
- the venue's build-up and dismantle timings
- any organiser restrictions on height, rigging or materials
01
Brief
Share stall size, expo and goals. We call within 2 hours.
02
3D Design
Photoreal concepts in 48 hours, revised until perfect.
03
Fabrication
Built and pre-assembled in our own workshops.
04
Install & Show
On-site crew builds, hands over and dismantles.








FAQ
Common questions
What does wooden exhibition stalls cost?+
From ₹9,000 per sq.m. The variables that move the figure are stall area in sq.m, number of open sides and overall height, wood-and-laminate versus system construction and graphic area and print finish.
Do you offer wooden exhibition stalls outside the metros?+
Yes. We cover 119 cities including every Tier 1 metro and more than a hundred Tier 2 exhibition cities, with crews working to the local organiser's schedule.
Is 3D design included?+
Yes, free with every confirmed fabrication order and revised until you approve it. Design-only projects are quoted per stall.
Is wooden exhibition stalls available as a standalone scope?+
Yes. It can be bundled with a full stall build or delivered on its own alongside another contractor's structure, with the interface agreed in writing first.
Can you handle organiser approvals?+
Yes. Stall drawings, electrical load details and structural documents are prepared and submitted as the organiser requires, and designs are checked against height, rigging and fire rules first.
What do you need from me to start?+
Final stall area, open sides and the organiser's stand plan, approved design, or the brief for one, logos and graphics in print-ready form and the venue's build-up and dismantle timings.
Do you work with agencies and co-exhibitors?+
Yes. We work directly with brands, with event and creative agencies on white-label scopes, and with pavilion organisers coordinating multiple co-exhibitors under one structure.
What is the lead time for wooden exhibition stalls?+
Four to six weeks from approved design for a standard custom build, eight weeks or more for a double-decker, pavilion or multi-city programme, and seven to ten days for urgent shows with a simplified design.
Wooden Exhibition Stalls in Tier 1 cities
Wooden Exhibition Stalls in Tier 2 cities
Other fabrication services
All services
Related guides
Exhibiting soon? Let's build your stall.