India's largest stall fabrication network · 119 cities · 1,461 venues
Wooden Exhibition Stalls Cost in India: 2026 Price Guide

Cost Guides

Wooden Exhibition Stalls Cost in India: 2026 Price Guide

Wooden exhibition stalls priced honestly: the published band, the lines a quote must name, why two quotes for one brief differ, and what the same money buys at different sizes.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

From ₹9,000 per sq.m. The final price for wooden exhibition stalls in India depends mainly on stall area in square metres and number of open sides, finish level (laminate, paint, veneer, acrylic, metal) and height, hanging structures and double-decker elements. The fastest way to an exact figure is to share your event, dates, size and reference images and ask for an itemised quote rather than a lump sum.

Key takeaways

  • Before anything else, settle stall area in square metres and number of open sides and finish level (laminate, paint, veneer, acrylic, metal) — the rest of the quote follows from them.
  • A lump sum cannot be compared with anything. Two itemised quotes against one written scope can.
  • Only 43% of this page's illustrative total is fabrication. The other ₹2,18,000 is everything a lump sum hides.
  • Booking early and reusing elements lowers the cost per event more than negotiation does.
  • Every budget overrun has a date on it, and the date is always after design sign-off.
  • From ₹9,000 per sq.m.

Wooden exhibition stalls: the published ranges

Classic wood-built stalls with laminate, veneer, PU paint and CNC jaali details.

From ₹9,000 per sq.m. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.

Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.

The band has an arithmetic shape worth seeing. Because ₹18,000 is twice ₹9,000, the same build money buys either a large plain stand or half the area beautifully finished. Exhibitors who have decided which of those they need brief quickly and buy well; exhibitors who have not spend the whole process trying to have both.

Construction typeRelative costReuseBest for
Shell scheme upgradeLowestGraphics only9–18 sq.m, first-time or budget exhibitors
Octanorm / system buildLowFrame and graphics9–36 sq.m, exhibitors doing several shows a year
Modular with custom graphicsMediumFrame, graphics, furniture18–54 sq.m, repeat exhibitors wanting a branded look
Custom wooden build₹9,000–₹18,000/sq.mLimitedAny size where the stand must look bespoke
Double-deckerQuoted per projectStructure, with engineering72 sq.m and above, when meetings would eat display space

Relative cost compares the build only. AV, furniture, flooring, transport, installation and taxes are quoted on their own lines in every case.

What drives the cost

Every wooden exhibition stalls quote is built from the same handful of variables. Knowing them lets you control the budget before you brief anyone, and lets you tell the difference between a vendor who is cheaper and a vendor who has quoted less work.

Open sides are the variable exhibitors forget to price. Each additional open face adds finished surface, another lighting run and another person to staff it — which is why two stands of identical area can quote very differently.

After area, the two variables with the most money in them are time and finish. Time, because a job booked inside the lead time is a job partly done at overtime rates: our own schedule needs 3 weeks for 18 sq.m, and compressing it does not remove work, it only moves it to a more expensive shift. Finish, because the difference between a good laminate and a veneer is invisible from the aisle and perfectly visible on the invoice.

  • Stall area in square metres and number of open sides
  • Finish level (laminate, paint, veneer, acrylic, metal)
  • Height, hanging structures and double-decker elements
  • LED walls, lighting and raised flooring
  • Distance from the workshop to the venue and build-up hours
  • Anything the organiser has to sign off: height, rigging, a raised floor, a second storey
  • Whether furniture is hired for the week or fabricated to keep
  • Whether the build-up window runs in daytime hours or forces a night shift
  • The number of approval rounds before the drawing is frozen
The cheapest quote is usually the one with the most left out.

Reading a wooden exhibition stalls quote properly

A professional quote lists every element separately so you can compare vendors fairly and remove items you do not need. A lump sum hides which of these you are about to pay for twice — or not at all.

Ask specifically whether transport, installation, dismantle, electrical fittings and taxes are inside the figure. Those four lines are the ones most often excluded, and together they are not small.

Three small lines are worth more than their value on fabrication work: material certification, the organiser submission, and a named project manager with a telephone number. Each is cheap to include and painful to arrange once the hall has opened its doors to build-up.

  • Electrical fittings, the stand's own wiring, and the load being declared
  • Installation, the on-site crew, and who supervises them
  • Pre-build or dry assembly at the workshop before dispatch
  • GST, shown as a figure rather than as a footnote
  • Organiser drawing submission and approval handling
  • Fire-retardant certification for the materials being used
  • Ply and MDF construction
  • Veneer and PU finishes
  • CNC jaali patterns
  • Built-in storage

A worked example: 18 sq.m custom stand

An example is worth more than a range. This one is 18 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.

The total is ₹3,80,000 — about ₹21,111 per sq.m once everything is counted. Most exhibitors are surprised by the shape rather than the size of it: the joinery everybody argues about is 43% of the figure, and ₹2,18,000 goes on graphics, light, floor, furniture, freight and crew.

Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 18 sq.m of structure is ₹3,24,000 rather than ₹1,62,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.

Worked example · Illustrative 18 sq.m custom build, costed line by line
Structure and joinery (18 sq.m × ₹9,000)₹1,62,000
Graphics — brand wall, tensioned fabric and vinyl₹56,000
Lighting — track, aimed spots and backlit panels₹34,000
Raised flooring and carpet₹26,000
Furniture — counters, seating, planters₹24,000
Transport, both ways₹34,000
Installation, crew and dismantle₹44,000
Indicative total, before GST₹3,80,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

What the same budget buys at different sizes

The band is a range, not a price, and its two ends buy very different stands. At any given size, the lower figure is the plain version and the upper is the premium one — and because the upper is twice the lower, the premium version of a stand costs the same as the plain version of twice the area. Here is that worked out at common sizes.

Hold the two middle columns next to each other and the trade is exact: the difference between them, ₹9,000 per sq.m, is the same as the lower rate itself. Upgrade the finish or double the footprint — at the published band, those two cost the same. Few budget decisions are this clean, and almost nobody uses it.

Which way to go depends on what the stand has to achieve. If visitors need to handle the product, queue for a demonstration or sit down with somebody, area wins: a crowded premium stand turns people away, and the finish is wasted on the backs of their heads. If the job is credibility — a launch, a first appearance in a category, a stand that has to look like the market leader's — finish wins, and a smaller, denser, better-lit stand does it better than a large plain one.

Stall sizeBuild at ₹9,000/sq.mBuild at ₹18,000/sq.mWhat the difference buys
9 sq.m₹81,000₹1,62,000Better print, aimed light instead of clip lamps, and an edge finish that survives the week
12 sq.m₹1,08,000₹2,16,000A laminate that survives handling, a lighting track, and a counter that locks
18 sq.m₹1,62,000₹3,24,000A raised floor, aimed lighting and furniture you do not have to apologise for
36 sq.m₹3,24,000₹6,48,000Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner
72 sq.m₹6,48,000₹12,96,000Architectural form — curves, a ceiling element, and a stand that reads as a building

These columns are the structure line and nothing else — the same line that is ₹1,62,000 in the 18 sq.m example above. Everything else on that example is additional at every size here.

Why two quotes for one brief differ

Two quotes for one brief rarely differ because one vendor is greedy. They differ because the brief left a dozen decisions open and each vendor closed them differently — one in the direction of looking affordable, the other in the direction of looking thorough.

Here is the gap itemised, on the same illustrative 18 sq.m stand. Six ordinary substitutions — none of them dishonest, all of them things a vendor might assume — take ₹3,80,000 down to ₹2,87,000. That is ₹93,000, or 24% of the total, without anybody quoting a different margin or a different standard of workmanship.

The remedy is unglamorous. Write the specification yourself — board, graphics medium, number of fixtures, flooring type, furniture list, crew and shift — and send the same page to everybody. The prices that come back will be close together, and you will be choosing a vendor rather than guessing at a scope.

Line that differsWhy the two figures are not the sameThe question that settles it
TaxesOne total is before tax and the other after itGive me both the pre-tax and the post-tax figure
DismantleFrequently missing from the cheaper quote entirelyIs clearing the stand inside the organiser's window in this price?
ElectricalThe organiser's power charge, the stand's own wiring, or neitherWho pays the organiser, and who wires the stand?
FlooringA raised platform with cable management against carpet on the hall floorRaised or not, and where do the cables run?
RiskOne vendor has priced the unknowns; the other will raise them later as variationsWhat happens to this price if the drawing changes?
StructurePly and MDF to a finished edge in one quote, a lighter board with an exposed edge in the otherName the board, the thickness and the edge finish
InstallationA day crew against a night-shift crew, with or without supervisionHow many crew, on which shift, and who supervises them?
TransportOne leg, both legs, or quietly left outIs the return journey inside this figure?

Every row is a question you can ask both vendors in the same email. The answers, side by side, usually explain the entire difference.

Worked example · Where ₹93,000 of difference comes from
Carpet laid straight on the hall floor instead of a raised platform with cable management₹13,000
A four-piece hired furniture package instead of eight pieces₹8,000
Installation and dismantle left as "to be advised"₹21,000
Lighter board in the structure, with an exposed edge instead of a finished one₹24,000
Printed flex taped to panels instead of tensioned fabric on a frame₹16,000
Six aimed spots instead of fourteen, and no backlit panel₹11,000
Total difference between the two quotes₹93,000

Illustrative, built by making six substitutions to the 18 sq.m example above. The higher quote is ₹3,80,000 and the lower is ₹2,87,000; the difference is ₹93,000, 24% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

The false economies, and the real ones

Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.

Apply a single test to every candidate for deletion: if it is missing, who handles it and where? Anything that ends up being handled at the venue has not been saved. Site is the most expensive place on earth to buy a sheet of board, an electrician's hour or a reprint.

Both halves of the distinction follow. First the lines that genuinely are optional — and these are usually the bigger numbers, which is the happy part of this section. Then, in the table, the ones that only look optional, each with its consequence spelled out.

  • A printed floor, when plain carpet in the brand colour does the same job
  • A second set of graphics for a message you have not tested on anybody yet
  • A model, a mock-up or a prop that duplicates something the product already demonstrates
  • A ceiling or hanging element, unless the stand has to be found from across the hall
  • A full-height closed meeting room on a small stand, where a screened corner does the same work
  • Fabricated furniture, where hired furniture would have been collected afterwards anyway
LineWhy it looks optionalWhat actually happens if you cut it
The power load calculationThe organiser supplies powerThe organiser supplies the load you declared. A screen added after the declaration is a screen without power
Packing crates and transport coverIt travelled fine last timeOnce is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day
The cable and socket count on the drawingThat is site detailSite detail becomes a visible extension lead across the floor of a stand you paid to look expensive
Supervision during build-upThe crew knows the drawingWhen a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost
A single project managerEach vendor manages themselvesThen every gap between vendors is yours to discover, usually at eight o'clock on the first morning
A graphics proofing roundThe artwork is finalLarge-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall

None of these are large figures in a quote. All of them are large figures once the hall is open, which is the entire point of the table.

The venue is the most expensive shop in India, and it only opens when you have run out of time.

The price of a late decision

The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.

The practical consequence is to front-load the arguing. With 3 weeks on the schedule for 18 sq.m, every disagreement settled before sign-off is free and every one settled afterwards has a price. Add 2 weeks for a premium finish or 2 for a double-decker element, and the calendar is still unforgiving once production has started.

There are two defences, and both are administrative. One approver on your side, with the authority to sign the drawing and the finish schedule. And an agreed variation process: who asks, who approves, and whether the price is confirmed before the work happens. Both cost nothing and both prevent the expensive version of this table.

Point in the programmeCost of a change hereThe reason
While the concept is being designedTime, and nothing elseNothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it
In productionThe labour already spent, plus the labour to redo itA fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved
After graphics go to printA full reprint of the affected panelLarge-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment
After dispatchFreight both ways, and a hole in the build scheduleThe panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you
Once the show has openedUsually nothing can be done at allThe hall is open and the stand is public. The only honest response is to write it down for the next edition

Read the first row twice. It is the only stage at which a change is free, and it is the stage exhibitors rush through fastest.

Exhibiting soon? Let's build your stall.

Or use the full form

Planning a budget backwards from a total

If the total is already fixed, plan from the total. It works better than designing first and pricing afterwards, and it forces the one calculation most exhibitors postpone: how much of this money is never going to reach the stand, because it belongs to the organiser, the airline, the hotel and the print shop.

After the list of costs that never reach a stall quote comes a worked allocation of ₹6,00,000, offered as an illustration rather than as a standard, because no standard exists that we could honestly cite. Read it from the bottom: ₹30,000 unallocated, ₹60,000 of costs no stand quote will carry, and ₹5,40,000 — 90% — left for the stand itself.

That leaves ₹2,70,000 for the build itself in this illustration, which at ₹9,000 per sq.m is 30 sq.m of structure, or 15 sq.m at ₹18,000. Compare that with the area you have actually booked and you will know immediately whether your budget and your floor plan are in agreement — and if they are not, you have found it out at the right time, which is before the design.

  • Storage of reusable elements between this edition and the next
  • Product freight — the goods on display travel separately from the stand that holds them
  • Insurance on goods in transit and on the stand itself
  • Printed collateral, samples, and anything you intend to hand over
  • Space rental, invoiced to you by the organiser rather than by your stand builder
  • Exhibitor badges, extra passes and vehicle parking
  • Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
  • Promoters, hostesses or interpreters, if your visitors need them
Where the money goesShare of the budgetAgainst ₹6,00,000
Stand build — structure, joinery and finish45%₹2,70,000
Graphics, lighting and AV20%₹1,20,000
Flooring and furniture10%₹60,000
Transport, installation and dismantle15%₹90,000
Your own show costs — travel, staffing, collateral, hospitality5%₹30,000
Contingency, held back rather than allocated at briefing5%₹30,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹6,00,000. The first four rows, ₹5,40,000, are what a stand builder quotes against. GST sits on top.

Size, space and what fits inside it

Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.

The visitors column is the one most exhibitors never calculate. Divide display area by 2.5 and you get roughly how many visitors can stand in the stand at once — which tells you whether your staffing plan and your footfall expectation are compatible.

The build-weeks column is a budget column in disguise. Our schedule is 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for a premium finish and +2 for a double-decker. Compressing it does not reduce the work; it relocates the work to night shifts and rush rates.

Stall sizeDisplay areaStorageStaff neededVisitors at onceBuild weeks
9 sq.m7.6 sq.m0.9 sq.m233
18 sq.m15.3 sq.m1.8 sq.m263
24 sq.m19.2 sq.m3.6 sq.m374
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
100 sq.m80 sq.m15 sq.m12325

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Paying for it: stages and deliverables

We will not quote you a standard payment split, because there is not one to quote. What matters more than the percentages is whether each stage is attached to something you can verify. Terms are agreed in the quote; this section is about what to ask for inside them.

Hold to a single principle and the rest follows: no payment stage without a deliverable attached. The deliverables are obvious once you ask for them — the approved drawing set, the materials on the floor, the dry assembly, the finished stand — and each one is something you or a colleague can physically verify.

The item to settle alongside the schedule is how changes get priced. Who approves them on your side, in what format, and is the figure confirmed before work starts? Nearly every uncomfortable conversation about an exhibition invoice began as a change that nobody priced at the moment it was agreed.

  1. 01

    Tie every stage to something you can see

    A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.

  2. 02

    Keep something payable after handover

    Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.

  3. 03

    Keep the organiser's bills on a separate line

    Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.

  4. 04

    Ask what happens if the show moves

    Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.

  5. 05

    Write the variation process down before there is a variation

    Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.

  6. 06

    Confirm what the first payment actually unlocks

    Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.

The invoice you argue about is almost always the one that followed a verbal agreement.

Reuse arithmetic: the second show is the cheap one

Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.

The worked example here is show two, with the same structure. Reprint the graphics, refurbish what the first show marked, pay for storage in between, and pay transport and installation again. ₹1,36,000 rather than ₹3,80,000: 36% of the first outing, with ₹2,44,000 of the original build simply not purchased again.

The table follows it across three shows, and the average per show falls from ₹3,80,000 to ₹2,58,000 and then to about ₹2,17,333 — a fall of 43% against the first outing, with nothing negotiated and no corner cut. That is the strongest cost lever in exhibiting, and it is available only to exhibitors who asked for it before the first stand was built.

It depends on three things being true. A modular structure that comes apart without damage; graphics as a removable layer rather than as part of the wall; and storage, which costs money and is therefore a line in the example rather than an assumption. Miss any one and the second show is close to the price of the first.

ShowCost this showCumulativeAverage per show so far
Show 1 — the first build₹3,80,000₹3,80,000₹3,80,000
Show 2 — same structure, new graphics₹1,36,000₹5,16,000₹2,58,000
Show 3 — same structure, new graphics₹1,36,000₹6,52,000₹2,17,333

Illustrative, built from the two worked examples on this page: ₹3,80,000 for the first build and ₹1,36,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · A second outing costed line by line
Graphics reprinted for the new show and the new message₹28,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹18,000
Storage of the structure between the two shows₹12,000
Transport, both ways₹34,000
Installation, crew and dismantle₹44,000
Indicative second-show total, before GST₹1,36,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹3,80,000, this is 36%, so ₹2,44,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

Where to save, and where the saving shows

Spend on the elements visitors notice in the first three seconds from the aisle — the brand wall, the lighting and the hero product position — and save on hidden structure, storage and anything above the sightline.

Reuse modular frames, graphics systems and furniture across shows, choose fabric graphics over rigid printed panels where the design allows, and bundle design, build and AV with one partner so you are not paying three margins and reconciling three schedules.

What not to cut is lighting. Hall lighting is designed for circulation, not for your product, so an unlit stand reads as under-funded no matter what the joinery cost. It is the cheapest line with the largest visible effect.

Read the list with the calendar in mind. These are savings at briefing stage and costs at any stage after it — a reprint instead of a rebuild saves money only if the design anticipated it, and a simpler footprint saves money only if the cutting list has not been written yet.

  • Hire the AV for the week instead of buying a screen you will then have to store
  • One strong message instead of five competing ones, which is cheaper and also works better
  • Keep the footprint simple — every curve, angle and radius is another line on the cutting list
  • Hire furniture and planters rather than fabricating them for a week
  • Print one hero graphic properly and keep everything around it plain
  • Keep graphics on fabric, so the next edition is a reprint instead of a rebuild
  • Freeze the layout once and leave it frozen, because the expensive version of every saving is a change

What goes wrong with wooden exhibition stalls quotes

The expensive failures on wooden exhibition stalls happen at quoting stage, not at the venue, which is why they are worth listing here rather than in a build guide. Start with the commonest: sub-contracted builds with no quality control. The question that prevents it is what the quote actually specifies, and who is answerable for delivering it.

The second failure is unwritten scope. A quote that does not name the board, the fixture count and the flooring type is a quote for an unspecified stand, and two such quotes cannot be compared with each other at all.

And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.

  • Late arrival on site that eats into build-up time
  • Hidden extras for electrical, carpet or dismantling
  • Sub-contracted builds with no quality control
  • Non fire-retardant materials rejected at the venue

Get an accurate price

Share your event name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept and an itemised wooden exhibition stalls quote, usually within 48 hours.

We design free with every confirmed fabrication order, fabricate in our own workshops, prepare the organiser drawings and approvals, and put one project manager on the job from brief to dismantle. Our published rate for this service is from ₹9,000 per sq.m for the build.

Whoever you end up using, ask for three things in writing: the itemisation, the exclusions, and how a change gets priced. Those three answers are what turn a number into a price you can plan around, and any vendor worth using will give them without being pressed.

Frequently asked questions

What is never included in a stall quote?+

Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹60,000 of ₹6,00,000 — small enough to forget and large enough to hurt.

What does a 18 sq.m stand cost?+

Using the published band, the structure alone is ₹1,62,000–₹3,24,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹3,80,000 before GST — about ₹21,111 per sq.m — for a mid-finish custom stand.

Does reusing a stand really lower the cost?+

Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹1,36,000 rather than ₹3,80,000 — 36% of the first show — because ₹2,44,000 of the first build is not bought again. Across three shows the average falls to about ₹2,17,333.

How far ahead should I book to avoid rush costs?+

Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.

How can I lower the cost without the stand looking cheap?+

Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.

How much does wooden exhibition stalls cost in India?+

From ₹9,000 per sq.m. For a custom build, work from ₹9,000–₹18,000 per sq.m for the structure, and treat graphics, lighting, flooring, furniture, AV, transport, installation and taxes as separate lines rather than as details inside that figure.

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 18 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹93,000, or 24% of ₹3,80,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

Do you charge separately for design?+

3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

Wooden Exhibition Stalls near you

Our crews deliver wooden exhibition stalls in every major Indian city.

Powered byIRPR