India's largest stall fabrication network · 119 cities · 1,461 venues
Modular Exhibition Stalls Cost in India: 2026 Price Guide

Cost Guides

Modular Exhibition Stalls Cost in India: 2026 Price Guide

What modular exhibition stalls really costs in India, what pushes the price up or down, and how to get an accurate, itemised quote.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

Lower cost per show from the second event onward. What moves the number for modular exhibition stalls is stall area in square metres and number of open sides, finish level (laminate, paint, veneer, acrylic, metal) and height, hanging structures and double-decker elements — and what makes two numbers incomparable is scope that nobody wrote down. Send the show, the city, the dates, the area, the open sides and two reference images, and ask for the quote itemised line by line.

Key takeaways

  • Booking early and reusing elements lowers the cost per event more than negotiation does.
  • Every budget overrun has a date on it, and the date is always after design sign-off.
  • Lower cost per show from the second event onward.
  • Two things dominate the quote: stall area in square metres and number of open sides and finish level (laminate, paint, veneer, acrylic, metal).
  • A lump sum cannot be compared with anything. Two itemised quotes against one written scope can.
  • Transport, installation, dismantle and taxes are separate lines. Confirm they are in the figure you are comparing.

Typical modular exhibition stalls price ranges

Modular systems you can reconfigure for different stall sizes across a full year of shows, cutting cost per event.

Lower cost per show from the second event onward. Expect a modest premium in Delhi NCR, Mumbai and Bengaluru, driven by venue labour rules and compressed build-up windows rather than by the build itself. A Tier 2 city planned four weeks out is frequently the cheapest version of the same stand.

The published band for custom fabrication is ₹9,000–₹18,000 per sq.m for the build. Modular and octanorm system construction sits below that band because the frame is reused rather than cut fresh, and an upgraded shell scheme — the organiser's own panels wrapped in printed fabric, with a raised floor, spotlights and a branded counter — sits below that again. Those three options are not different qualities of the same thing; they are different trade-offs between cost, reuse and how much the stand can be made to look like only your brand.

The band has an arithmetic shape worth seeing. Because ₹18,000 is twice ₹9,000, the same build money buys either a large plain stand or half the area beautifully finished. Exhibitors who have decided which of those they need brief quickly and buy well; exhibitors who have not spend the whole process trying to have both.

Construction typeRelative costReuseBest for
Shell scheme upgradeLowestGraphics only9–18 sq.m, first-time or budget exhibitors
Octanorm / system buildLowFrame and graphics9–36 sq.m, exhibitors doing several shows a year
Modular with custom graphicsMediumFrame, graphics, furniture18–54 sq.m, repeat exhibitors wanting a branded look
Custom wooden build₹9,000–₹18,000/sq.mLimitedAny size where the stand must look bespoke
Double-deckerQuoted per projectStructure, with engineering72 sq.m and above, when meetings would eat display space

Relative cost compares the build only. AV, furniture, flooring, transport, installation and taxes are quoted on their own lines in every case.

The variables doing the work

Price every modular exhibition stalls enquiry against the same short list and vendor comparison stops being guesswork. Each line below is something you can change; the total is only what they add up to.

Two numbers set the budget before anyone opens a sketchbook: how many square metres you booked and how many of its sides are open. An island stand is not a more expensive taste, it is four finished faces instead of one.

After area, the two variables with the most money in them are time and finish. Time, because a job booked inside the lead time is a job partly done at overtime rates: our own schedule needs 4 weeks for 36 sq.m, and compressing it does not remove work, it only moves it to a more expensive shift. Finish, because the difference between a good laminate and a veneer is invisible from the aisle and perfectly visible on the invoice.

  • LED walls, lighting and raised flooring
  • Distance from the workshop to the venue and build-up hours
  • Stall area in square metres and number of open sides
  • Finish level (laminate, paint, veneer, acrylic, metal)
  • Height, hanging structures and double-decker elements
  • The number of approval rounds before the drawing is frozen
  • How far the workshop is from the venue, and whether a lorry can reach the hall door
  • How much of the stand has to be new, and how much can come out of storage
  • Whether the build-up window runs in daytime hours or forces a night shift
The cheapest quote is usually the one with the most left out.

Reading a modular exhibition stalls quote properly

A professional quote lists every element separately so you can compare vendors fairly and remove items you do not need. A lump sum hides which of these you are about to pay for twice — or not at all.

The exclusions are more informative than the inclusions. Transport back from the venue, the crew who put it up, the dismantle inside the organiser's window, the electrical fittings and the tax: ask about those five by name, because a quote rarely mentions what it has left out.

For fabrication work there are a few lines beyond the obvious ones that belong on the page: the certification the venue will ask for, the drawings the organiser will ask for, and the person whose phone you will be ringing at seven in the morning on build-up day. None of those are large figures. All of them are expensive to arrange late.

  • Electrical fittings, the stand's own wiring, and the load being declared
  • A named project manager, with a phone number, for the build-up days
  • Graphics proofing, and what happens if a panel has to be reprinted
  • Installation, the on-site crew, and who supervises them
  • Reusable across multiple shows
  • Reconfigurable for 9–100 sq.m
  • Fast install, lower freight
  • Storage between events
  • Transport to the venue and the return leg, stated separately
  • Pre-build or dry assembly at the workshop before dispatch

What 36 sq.m actually costs, line by line

Here is how a mid-size custom build actually breaks down. The structure line uses the bottom of the published band — ₹9,000 per sq.m across 36 sq.m — and everything below it is a separate scope that a lump-sum quote would bury.

At ₹6,73,000 this stand works out at roughly ₹18,694 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹3,49,000, a little more than the fabrication itself.

Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 36 sq.m of structure is ₹6,48,000 rather than ₹3,24,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.

Worked example · 36 sq.m custom stand, three sides open
Structure and joinery (36 sq.m × ₹9,000)₹3,24,000
Furniture — counters, seating, planters₹38,000
Graphics — brand wall, tensioned fabric and vinyl₹97,000
Lighting — track, aimed spots and backlit panels₹54,000
Raised flooring and carpet₹43,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative total, before GST₹6,73,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

What the same budget buys at different sizes

This is the comparison most briefs skip. At every size, the band gives you a lower figure and an upper one, and the gap between them is not padding: it is finish, light, floor and detail. The last column names what it buys, so you can decide whether you want it more than you want the extra square metres.

Hold the two middle columns next to each other and the trade is exact: the difference between them, ₹9,000 per sq.m, is the same as the lower rate itself. Upgrade the finish or double the footprint — at the published band, those two cost the same. Few budget decisions are this clean, and almost nobody uses it.

The honest rule is that area serves activity and finish serves belief. Demonstrations, queues, meetings and products that must be touched all need floor, and no amount of veneer compensates for a stand people cannot get into. A launch, a new category entry, or a brand that has to look established needs finish, and does better with a smaller, denser, well-lit stand than with a larger plain one.

Stall sizeBuild at ₹9,000/sq.mBuild at ₹18,000/sq.mWhat the difference buys
18 sq.m₹1,62,000₹3,24,000A raised floor, aimed lighting and furniture you do not have to apologise for
24 sq.m₹2,16,000₹4,32,000A branded floor, a demo counter that actually works, and a spare hero panel
36 sq.m₹3,24,000₹6,48,000Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner
54 sq.m₹4,86,000₹9,72,000Double-height brand elements, integrated AV and a storage wall that hides the cartons
100 sq.m₹9,00,000₹18,00,000All of the above, plus the engineering a raised or second-storey element needs

Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.

Reading the gap between two quotes

The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.

Here is the gap itemised, on the same illustrative 36 sq.m stand. Six ordinary substitutions — none of them dishonest, all of them things a vendor might assume — take ₹6,73,000 down to ₹5,23,000. That is ₹1,50,000, or 22% of the total, without anybody quoting a different margin or a different standard of workmanship.

The remedy is unglamorous. Write the specification yourself — board, graphics medium, number of fixtures, flooring type, furniture list, crew and shift — and send the same page to everybody. The prices that come back will be close together, and you will be choosing a vendor rather than guessing at a scope.

LineThe two readings of your briefWhat to put in writing
InstallationA day crew against a night-shift crew, with or without supervisionHow many crew, on which shift, and who supervises them?
FurnitureHired against fabricated, and a four-piece package against an eight-piece oneList the pieces, and say which are hired and which are built
TaxesOne total is before tax and the other after itGive me both the pre-tax and the post-tax figure
FlooringA raised platform with cable management against carpet on the hall floorRaised or not, and where do the cables run?
DismantleFrequently missing from the cheaper quote entirelyIs clearing the stand inside the organiser's window in this price?
Drawings and approvalsOne vendor is preparing the organiser submission; the other expects you toWho prepares the drawings, and who submits them?
ElectricalThe organiser's power charge, the stand's own wiring, or neitherWho pays the organiser, and who wires the stand?
RiskOne vendor has priced the unknowns; the other will raise them later as variationsWhat happens to this price if the drawing changes?

Every row is a question you can ask both vendors in the same email. The answers, side by side, usually explain the entire difference.

Worked example · Where ₹1,50,000 of difference comes from
Installation and dismantle left as "to be advised"₹31,000
Lighter board in the structure, with an exposed edge instead of a finished one₹42,000
Printed flex taped to panels instead of tensioned fabric on a frame₹26,000
Six aimed spots instead of fourteen, and no backlit panel₹18,000
Carpet laid straight on the hall floor instead of a raised platform with cable management₹21,000
A four-piece hired furniture package instead of eight pieces₹12,000
Total difference between the two quotes₹1,50,000

Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

The false economies, and the real ones

Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.

The test is simple: ask what happens if this line is not there. If the answer is "nothing, nobody would notice", delete it with confidence. If the answer is "we deal with it on site", you have not removed a cost, you have moved it to the most expensive place and time available, and attached a risk to it.

The list immediately below is the first kind: real options, which can go without anybody noticing. The table after it is the second kind — lines that look like fat and are not, with what actually happens when each one is cut. Start with the list, because the genuinely optional items on a modular exhibition stalls quote are usually larger than the false economies and far less painful to remove.

  • A full-height closed meeting room on a small stand, where a screened corner does the same work
  • Wall height above the sightline, which costs material and is read by nobody
  • A ceiling or hanging element, unless the stand has to be found from across the hall
  • A second set of graphics for a message you have not tested on anybody yet
  • Backlighting on every panel, rather than on the one panel you want looked at
  • Working shutters and locks on storage that nobody will see
Line itemWhy it reads as paddingThe consequence
The cable and socket count on the drawingThat is site detailSite detail becomes a visible extension lead across the floor of a stand you paid to look expensive
Dismantle and clearanceThe show is over by thenThe organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards
One spare panel for the hero wallIt will be fineA scuffed hero panel is the one thing every photograph of the stand will show
A single project managerEach vendor manages themselvesThen every gap between vendors is yours to discover, usually at eight o'clock on the first morning
Storage between showsWe will decide after this one"After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost
The power load calculationThe organiser supplies powerThe organiser supplies the load you declared. A screen added after the declaration is a screen without power

None of these are large figures in a quote. All of them are large figures once the hall is open, which is the entire point of the table.

The venue is the most expensive shop in India, and it only opens when you have run out of time.

What changing your mind costs, stage by stage

The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.

So the cheapest thing you can buy is time at the front. A 36 sq.m build runs to 4 weeks on our schedule — 3 weeks base plus 1 for the area — and a premium finish or a double-decker element adds 2 and 2 weeks respectively. None of that window is spare, which is exactly why a decision taken in week one is free and the same decision in week four is not.

Protect yourself with two things. First, a single named approver — two people with different opinions about the same wall is the most expensive organisational arrangement in exhibiting. Second, a written variation process, so that every change has a price attached at the moment it is agreed rather than at the moment it is invoiced.

Point in the programmeCost of a change hereThe reason
While the concept is being designedTime, and nothing elseNothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it
After design sign-off, before productionA redraw and a requoteDrawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you
After materials are orderedThe material, plus its replacementBoard, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts
After graphics go to printA full reprint of the affected panelLarge-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment
After dispatchFreight both ways, and a hole in the build scheduleThe panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you

Nothing in this table is a penalty. Each row is simply work that has to be done twice, plus whatever the first attempt cost in material.

Exhibiting soon? Let's build your stall.

Or use the full form

Working back from the number you have

If the total is already fixed, plan from the total. It works better than designing first and pricing afterwards, and it forces the one calculation most exhibitors postpone: how much of this money is never going to reach the stand, because it belongs to the organiser, the airline, the hotel and the print shop.

After the list of costs that never reach a stall quote comes a worked allocation of ₹10,00,000, offered as an illustration rather than as a standard, because no standard exists that we could honestly cite. Read it from the bottom: ₹50,000 unallocated, ₹1,00,000 of costs no stand quote will carry, and ₹9,00,000 — 90% — left for the stand itself.

That leaves ₹4,50,000 for the build itself in this illustration, which at ₹9,000 per sq.m is 50 sq.m of structure, or 25 sq.m at ₹18,000. Compare that with the area you have actually booked and you will know immediately whether your budget and your floor plan are in agreement — and if they are not, you have found it out at the right time, which is before the design.

  • Lead-capture devices, the data connection, and somewhere to charge them
  • Space rental, invoiced to you by the organiser rather than by your stand builder
  • Exhibitor badges, extra passes and vehicle parking
  • The organiser's power connection, charged against the load you declare
  • Storage of reusable elements between this edition and the next
  • Travel, hotels and local transport for everyone who will stand on the stand
  • The cost of your own team being away from their desks for the build-up and the show
  • Product freight — the goods on display travel separately from the stand that holds them
AllocationShareIllustrative amount
Stand build — structure, joinery and finish45%₹4,50,000
Graphics, lighting and AV20%₹2,00,000
Flooring and furniture10%₹1,00,000
Transport, installation and dismantle15%₹1,50,000
Your own show costs — travel, staffing, collateral, hospitality5%₹50,000
Contingency, held back rather than allocated at briefing5%₹50,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.

Size, space and what fits inside it

Before comparing prices per square metre, look at what a square metre does. Our planner's ratios are simple: storage at 10% up to 18 sq.m and 15% beyond it, a default 5% for a meeting corner, and the balance as display. Apply them and most stall-size arguments resolve themselves.

One column deserves more attention than it gets: how many people physically fit. Display area divided by 2.5 gives the number of visitors who can be in the stand simultaneously, and that figure is a ceiling on everything your marketing plan promises.

Lead time belongs in a cost conversation because it is a cost. 3 weeks is the base, plus 1 week from 24 sq.m and 2 from 54 sq.m, with 2 more for a premium finish and 2 for a double-decker. Book inside those windows and the same stand costs more, because the work moves on to shifts that cost more.

Stall sizeDisplay areaStorageStaff neededVisitors at onceBuild weeks
12 sq.m10.2 sq.m1.2 sq.m243
24 sq.m19.2 sq.m3.6 sq.m374
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235
100 sq.m80 sq.m15 sq.m12325

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Milestones that correspond to something

Payment terms vary by vendor, by scope and by how long the two of you have worked together, and we are not going to invent a standard split — there is no honest source for one. What can be said without inventing anything is what each stage ought to correspond to, and that is the part worth negotiating.

The principle is that a payment stage should correspond to a deliverable rather than to a date. Approved drawings exist or they do not. Materials are on the shop floor or they are not. A pre-build can be walked around or it cannot. The stand is standing at the venue or it is not. Each of those is checkable; "end of week two" is not.

One more thing belongs in this conversation, because it is where disputes actually start: the variation process. Agree, before the first payment, who on your side approves a change, in what format, and whether its price is confirmed before the work begins. Unpriced variations are where almost every uncomfortable conversation about an exhibition invoice begins, and they are the one budget risk that is entirely administrative to remove.

  1. 01

    Tie every stage to something you can see

    A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.

  2. 02

    Get the tax position in writing

    Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.

  3. 03

    Write the variation process down before there is a variation

    Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.

  4. 04

    Keep something payable after handover

    Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.

  5. 05

    Ask what happens if the show moves

    Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.

  6. 06

    Ask for the schedule inside the quote

    Payment terms belong in the same document as the itemised scope, not in a separate message afterwards. If the stages and the deliverables are written on one page, you can see whether they line up — and if they do not, that is a conversation to have before you sign rather than in week three.

A milestone with no deliverable attached is a date, and a date is not a milestone.

Reuse arithmetic: the second show is the cheap one

A single-show cost is the wrong number for anybody exhibiting more than once a year. What matters is the average across the programme, and that average drops a long way after the first show — provided the first stand was conceived as something that would come down in panels rather than in pieces.

The worked example here is show two, with the same structure. Reprint the graphics, refurbish what the first show marked, pay for storage in between, and pay transport and installation again. ₹2,15,000 rather than ₹6,73,000: 32% of the first outing, with ₹4,58,000 of the original build simply not purchased again.

Across three editions, in the table, the running average goes ₹6,73,000, ₹4,44,000, ₹3,67,667 — down 45% from the first show to the three-show average. Nothing in that was haggled; the only decision involved was specifying a structure that would come apart and finding somewhere to keep it.

Three conditions have to hold, and they are all specification rather than luck. The structure has to be modular, dismantled in panels rather than broken down. The graphics have to be a separate layer — fabric on a frame, reprinted rather than rebuilt. And somewhere has to store it, which is a real cost and appears as a line in the example rather than being quietly ignored.

EditionCost of this oneTotal so farAverage per show
Show 1 — the first build₹6,73,000₹6,73,000₹6,73,000
Show 2 — same structure, new graphics₹2,15,000₹8,88,000₹4,44,000
Show 3 — same structure, new graphics₹2,15,000₹11,03,000₹3,67,667

Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · What the second show carries, and what it does not
Graphics reprinted for the new show and the new message₹48,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹32,000
Storage of the structure between the two shows₹18,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative second-show total, before GST₹2,15,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

How to reduce cost without looking cheap

Budget by sightline. What faces the aisle deserves the spend; storage walls, back-of-house and anything above head height does not, because nobody is looking at it.

Three habits cut more than any negotiation does — reuse the frame, hire rather than build the furniture, and keep graphics on fabric so next year's edition costs a reprint instead of a rebuild.

Cut structure before light. Visitors cannot admire quality they are standing in the shadow of, and lighting costs a fraction of the thing it makes visible.

The savings that work are the ones decided early. Booking inside the lead time, redesigning after sign-off and adding scope in production are not savings at all — they are the three most reliable ways to spend more than you planned. Every item in the list below has to be chosen before the brief is frozen to be worth anything.

  • Print one hero graphic properly and keep everything around it plain
  • Keep the footprint simple — every curve, angle and radius is another line on the cutting list
  • Choose a laminate that reads like veneer from a metre away, and spend the difference on light
  • Upgrade a shell scheme instead of building raw space, for stalls under 18 sq.m
  • Share a lorry with your own product freight, if the dates allow it
  • Reuse a modular structure across several shows — the second outing costs a fraction of the first
  • Book early: rush charges and night-shift labour are avoidable rather than inevitable

Where quotes go wrong

Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: sub-contracted builds with no quality control. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.

The second is scope that was never written down. If the quote does not name the finish, the lighting count and the flooring type, two vendors are not quoting the same stand and the comparison is meaningless.

The third failure is a budget that was correct when it was written. Scope added in ones and twos after sign-off does not announce itself as an overrun until the final invoice, which is exactly why the change procedure matters as much as the price.

  • Hidden extras for electrical, carpet or dismantling
  • Sub-contracted builds with no quality control
  • Non fire-retardant materials rejected at the venue
  • Late arrival on site that eats into build-up time

Getting a modular exhibition stalls quote you can rely on

Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised modular exhibition stalls quote within about two days.

Design is free with every confirmed fabrication order; the build happens in our own workshops; the organiser drawings and approvals are ours to handle; and one project manager stays with the job from brief through dismantle. Lower cost per show from the second event onward.

Whoever you end up using, ask for three things in writing: the itemisation, the exclusions, and how a change gets priced. Those three answers are what turn a number into a price you can plan around, and any vendor worth using will give them without being pressed.

Frequently asked questions

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 36 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹1,50,000, or 22% of ₹6,73,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

Is GST included in modular exhibition stalls quotes?+

A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.

How far ahead should I book to avoid rush costs?+

Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.

Does reusing a stand really lower the cost?+

Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹2,15,000 rather than ₹6,73,000 — 32% of the first show — because ₹4,58,000 of the first build is not bought again. Across three shows the average falls to about ₹3,67,667.

Do you charge separately for design?+

3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.

When is payment due?+

Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

What is never included in a stall quote?+

Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,00,000 of ₹10,00,000 — small enough to forget and large enough to hurt.

How can I lower the cost without the stand looking cheap?+

Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.

Modular Exhibition Stalls near you

Our crews deliver modular exhibition stalls in every major Indian city.

Powered byIRPR