The international expo stalls brief, field by field: what to write, why each line is asked for, a worked example you can copy, and what happens to the quote when a field is left blank.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 9 min read

Short answer

Thirteen fields make an international expo stalls brief quotable: what you sell, which show and venue, the build-up and show dates, the area in square metres, the number of open sides, the height and rigging limit, one primary goal with a number in it, the buyer you want to meet, the products or messages to feature, the zones you cannot do without, your brand files and references, a budget range, and the approver with a date. Anything missing becomes an assumption, and assumptions are priced defensively.

Key takeaways

  • One page is enough. A dozen fields, a budget range and three reference images beat a five-page document with no numbers in it.
  • Area and open sides do more to the price than any design decision. 36 sq.m with two open sides and 36 sq.m inline are not the same job.
  • Write "advise us" rather than deleting a field. A supplier cannot tell a deliberate no from an oversight, and prices the safer reading.
  • Attach the exhibitor manual. Its rules on height, rigging and materials decide what can be drawn at all.
  • Give product weights and power requirements. Without them plinths and sockets are sized by assumption and rebuilt on site.
  • Name the approver and the decision date. The real timeline is usually your sign-off chain, not the workshop.

Why the brief, not the supplier, decides the quote

There is a tempting conclusion when three quotes arrive 40% apart: one of them is trying it on. Occasionally true, usually not. More often the brief did not fix the variables, so each supplier priced a slightly different job — and the cheapest is simply whoever guessed smallest.

The practical consequence is a procurement problem. Large exhibitors, government bodies, export councils and multinationals who want a single accountable partner for the whole participation tend to discover it at the comparison stage, when three figures refuse to line up. For an international expo stalls scope the price is driven mainly by total area and number of co-exhibitors, scope (design, build, AV, furniture, logistics, manpower, hospitality) and number of cities or shows in the programme, and every one of those is information that lives with you rather than with the supplier.

The second reason to write it down is time. A brief with every field answered produces a concept and an itemised quote inside 48 hours. A brief with four fields missing produces a clarification email, a reply two days later, a second clarification, and a concept in week two — out of a lead time that was already 4 weeks for a stall this size. The brief is the cheapest week you will ever buy back.

Three quotes 40% apart usually means three different jobs were priced, not that one supplier is expensive.

The fields, their reasons, and worked answers

Read this as the template itself rather than as advice about one. Each row names a field, explains what decision it feeds, and shows a usable answer. The example column belongs to one organisation — industrial pump manufacturer, selling to plant engineers and EPC contractors — and the same brief is written out in full further down.

The middle column is the part worth arguing with. If you can see which decision a field feeds, you can tell whether your own answer is specific enough to be useful — and a field answered uselessly costs the same round trip as one left blank.

FieldWhy it is askedExample answer
Company, brand and what you sellDecides tone: the same budget produces very different work for a technical audience and a consumer oneIndustrial pump manufacturer, selling to plant engineers and EPC contractors
Event name, city, venue and hallDetermines freight, crew availability and the rules the design has to satisfyThree-day B2B industry show; hall and stall number as per the allotment letter
Build-up, show and dismantle datesThis is the deadline everything is reverse-engineered from, including whether night-shift labour is neededBuild-up two days before; show three days; dismantle the final night
One primary goal, with a numberDecides the whole approach. The same budget spent on reach and spent on depth produce completely different workBook 40 qualified distributor meetings across three days
Who you want to reachSets how open or how focused the whole thing has to be, and from how far away it must readPlant maintenance heads and procurement managers; mostly pre-booked, some walk-in
Products or messages to featureDecides what occupies the hero position and what has to be built or rigged to serve itTwo pumps, the larger at 180 kg, plus a cutaway section model
Brand assets and referencesArtwork you own the rights to, at final size — plus three images that replace a page of adjectivesLogo in vector, brand guidelines, product photography; three reference images with a line on each
Number of open sidesChanges the cost per square metre more than any design choice, because it changes how many faces have to be finishedTwo open sides, corner
Height limit and rigging rulesDecides what is legal before it decides what is possible, and whether an engineer has to sign anything4 m maximum; no rigging from the hall roof permitted
Must-have zonesEach zone is subtracted from display area, so listing them is how you find out whether the space worksDemo counter, closed two-seat meeting corner, lockable store for literature and bags
Reuse intentionsChanges the construction type entirely: a frame that returns, or a stand that does notAnother show within twelve months; tell us what can come back and what storage costs

One page, filled in like this, is enough to produce a proposal and an itemised quote without a single clarifying question.

The blank version, ready to paste

Copy this into whatever you write in. Leave the headings alone — they are what makes two replies comparable — and send the same text to everyone on your list. Improving the brief between suppliers is the quickest way to end up unable to choose between them.

Attach your reference images and brand files separately rather than describing them. Three images with one honest line each — "this layout, not this colour"; "this lighting, we do not need the moving element" — are worth more than a page of adjectives.

  • Company / brand, and what you sell:
  • Who buys from you, and who you want to reach at this event:
  • Event name, city and venue:
  • Primary goal, with a number attached:
  • What is being shown, demonstrated or revealed:
  • Elements you do not want:
  • Brand assets attached (logo, guidelines, product photography):
  • Reference images attached, with a line on what you liked about each:
  • Who approves, and by when:
  • How many suppliers you are briefing:
  • Whether you need the quote itemised, and in what format:
  • Stall / stand number, as allotted:
  • Build-up dates and hours:
  • Show dates and opening hours:
  • Stall area in sq.m, and dimensions if known:
  • Number of open sides (1 inline, 2 corner, 3 three-side open, 4 island):
  • Height limit, and whether rigging from the roof is allowed:
  • Must-have zones (demo, meeting, storage, pantry, seating, reception):
  • Whether elements need to be reusable at a later show:

What a usable brief actually reads like

To show the difference between filled in and useful, here is the whole brief as prose. Six paragraphs, written by industrial pump manufacturer, selling to plant engineers and EPC contractors, each one specific enough that a supplier could start from it.

Almost nothing here is a design instruction, and that is deliberate. Describe the problem precisely and you will get a better answer than you would have specified.

  1. 01

    Context

    We manufacture industrial pumps and sell to plant engineers, maintenance heads and EPC contractors. Our buyers are technical, they arrive with a shortlist, and they want to see a cutaway and ask about service intervals rather than read a tagline. We have exhibited twice before with a shell-scheme upgrade, so this is our first custom stall and our first time at this size.

  2. 02

    The space

    The space is 36 sq.m (6 × 6 m), two open sides, corner, per the allotment paperwork. Height limit 4 m, no roof rigging. Build-up opens two days before doors; the show is three days; the stand has to be cleared the last night. Manual and portal login are ready to hand over.

  3. 03

    What we need the stall to achieve

    One primary goal: book 40 qualified distributor meetings across the three days. Secondary: have the cutaway model photographed well enough to use the images for the next twelve months. That means a closed two-seat corner where a contract conversation is possible without shouting, a demo counter that works standing up, and a clear path from the aisle to the hero product that does not pass our own team first.

  4. 04

    What has to fit on the stand

    On the stand: two pumps, the larger at 180 kg, plus a cutaway section model. We also need somewhere for literature, for 4 people's bags, and for the cartons that arrive with the stock — lockable, and out of sight. The zones that matter are: demo counter, closed two-seat meeting corner, lockable store for literature and bags. Keep the whole thing under the 4 m limit.

  5. 05

    What we intend to spend, and on what

    Our band is ₹6–7 lakh for the stand, with space rent already paid separately to the organiser and GST on top. Priorities inside that: lighting first, the hero position second, structure last. We would also like to know which elements could come back for the next edition, and what holding them in storage costs.

  6. 06

    The decision

    Our marketing head approves, with one technical reviewer from the product team. We can turn a concept around in five working days, and we are approaching three suppliers with this identical brief. We need an itemised quote — structure, graphics, lighting, flooring, furniture, transport, installation, dismantle and taxes on separate lines — not a single figure.

The same brief, costed line by line

This is the output of the brief above, priced. 36 sq.m, structure costed at the bottom of the published ₹9,000–₹18,000 per sq.m band, everything else itemised separately, and a total that sits inside the ₹6–7 lakh range named in the brief. A budget field that produces a quote inside its own band has done its job.

What to take from this is the split, not the number. 51% is the build; the remaining 49% is graphics, lighting, flooring, furniture, freight and crew. Within a lump sum those six lines are invisible and interchangeable, so a brief that asks for itemisation is asking for the only thing that makes two quotes legible.

Worked example · What ₹6–7 lakh buys on a scope like this
Structure, joinery and platform (36 sq.m at ₹9,000 per sq.m)₹3,24,000
Graphics — brand wall, product panels and fascia₹86,000
Lighting — track, accent LED and spots on each display₹47,000
Flooring — raised platform, carpet and concealed cabling₹38,000
Furniture — demo counters, seating, display cases and store₹33,000
Freight to the venue and back₹44,000
Installation, crew, supervision and dismantle₹58,000
Indicative total for the scope, before GST₹6,30,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band for the structure line. Space rent paid to the organiser and GST are both extra. Your own figure will differ with finish level, city, venue rules and how much AV is added — which is the point of sending a brief rather than reading a price list.

Exhibiting soon? Let's build your stall.

Or use the full form

The cost of a blank field

Here is the argument for the twenty minutes. A gap in a brief is not a gap in a quote; the supplier has to put a number against it either way. Guessing low exposes them, so they guess safe, and safe is more expensive. You pay for every field you did not fill in.

And you cannot see it happening. Nothing on the document says "priced for the worst case because the constraint was not stated". You see one number above another and read it as a difference in price, when it is a difference in guesswork.

Field left blankWhat the supplier has to assumeWhat it does to the quote
Who you want to reachA broad, mixed audienceA broadcast solution when you needed an intimate one, or the reverse
Dates and timesA comfortable scheduleThe quote expires the moment real dates arrive, and rush labour appears later
Budget rangeMid-band, or the top of itA wasted revision round in one direction or the other
Brand filesArtwork will be supplied laterThe longest-lead item starts last, which is where shows are lost
Approvers and decision dateOne reviewer, fast turnaroundRevision rounds run out, and the extra ones push production
Stall areaNothing can be assumedNo quote at all, or a rate you cannot compare against a total
Number of open sidesUsually the worst case — more finished facesPriced for more structure, graphics and lighting than you need
Product weights and powerStandard plinths and a domestic socketOn-site rework during build-up, at build-up prices
Must-have zonesDisplay onlyStorage and meetings get added after sign-off, taking area from display
Finish levelMid-band laminateThe stand is built as specified, and the specification was a word

Every row here is a reasonable response to missing information. That is the point: the cost is not caused by the supplier, and it cannot be negotiated away afterwards.

You will never see "we assumed the worst case" on a quote. You will only see a number that looks expensive.

Extra lines to add for international expo stalls

An international expo stalls scope has its own variables, and leaving them out is what turns a reasonable quote into a vague one. The lines below are the ones that matter. None of them requires technical knowledge to answer — only a decision, or an admission that there is not one yet.

Where you have no view, say "advise us" — a supplier will happily recommend, and will price the recommendation. What they cannot do is price a blank.

  • Which elements are in scope — design, build, AV, furniture, flooring, logistics, manpower, hospitality
  • Number of co-exhibitors or departments sharing the space, and who approves their branding
  • What post-show reporting you need, and who it goes to
  • Which elements you would rather contract directly, and who owns that interface
  • What your procurement process needs to see before a purchase order can be raised

Mistakes that make a brief unusable

A brief fails in predictable ways, and almost none of them are about effort — plenty of unusable briefs are five pages long. What distinguishes the usable ones is numbers and outcomes rather than description.

The worst of them is the brief that describes a look instead of a job. "Clean, premium, impactful" is three words that constrain nothing — every supplier agrees with all three and none of them can act on any of them. Replace each adjective with the audience behaviour you want and the brief starts doing work.

The other expensive habit is sending a slightly better brief to each successive supplier. The result is a set of quotes answering different questions, and a decision made on the quality of the presentation rather than the scope behind it.

  • Reference images with no explanation of what you liked in them
  • Asking for a "best price" instead of an itemised quote against a fixed scope
  • Three goals of equal weight, which means the result has to compromise all three
  • A different, improved brief sent to each supplier, destroying comparability
  • Dates missing, so the schedule and any rush cost are both unknown
  • Logos supplied as a low-resolution image lifted from a website
  • Not sending the exhibitor manual, which contains the rules the design has to obey
  • No area or open sides, which makes the quote arithmetic impossible
  • Describing a look instead of a job — adjectives in place of audience actions
  • No named approver, so revision rounds expand until production is squeezed

What happens when you send it

Email it or paste it into the enquiry form, attachments included. What comes back is a concept and an itemised quote, normally inside 48 hours, plus an honest view on whether your dates are workable — which is worth more than the price if the event is close.

Quoted per show. Design is free with a confirmed fabrication order, production happens in our own workshops, organiser submissions are ours to prepare and file, and one named project manager owns the job from the brief through to clearing the site. Tight dates are better declared than discovered.

  • Partner build coordination abroad
  • Design and drawings from India
  • Organiser submissions
  • Freight and logistics

Frequently asked questions

What should an international expo stalls brief include?+

The space, the dates, the goal and the money, in that order of importance — then who you want to meet, what has to fit on the stand, which zones are non-negotiable, your brand files, your references, and the name of whoever signs it off. One page covers all of it.

Should I share my budget with suppliers?+

Yes. The fear is that naming a number means paying it, but the opposite happens: an unnamed budget produces a concept aimed at the middle or the top of the market, and you spend a revision round correcting the aim. A band of the shape "four to five lakh, excluding venue charges" is enough.

Should I send the same brief to every supplier?+

Send the identical text, word for word. The moment one supplier has extra detail, the quotes stop being comparable and you are choosing on presentation instead of scope. Add any new detail to all of them at once.

What if I do not know the answer to a field?+

Say so explicitly. "Advise us" is a useful instruction and will get you a recommendation; a missing line gets you an assumption, and assumptions are priced for the worst case. Keep every heading in the document even when the answer is "none".

Why does the number of open sides matter so much?+

Each open side is another finished face, another lighting run, another entry point to plan and more staff to cover. An island stall and an inline stall of the same area are different jobs, and the quote reflects that before any design decision is made.

How quickly will I get a concept back?+

Within about two days, if the brief is complete. The delay in practice is never the drawing; it is the round trip of questions a half-filled brief generates — and that round trip happens at the start of the project, where you can least afford it.

What is the single most important field?+

One sentence describing what has to be true afterwards, with a figure attached. Everything else is a constraint; this is the brief. Without it a supplier can produce something buildable, compliant, on budget and completely beside the point.

Should I write the brief before or after booking the space?+

Ideally before, because the goal should decide how much area you take and how many open sides you want. In practice most briefs follow the booking, in which case write down the area and open sides you actually have and design against them rather than around them.

Who should write the brief internally?+

Whoever will own the approval. The common failure is a brief written by marketing without sales, or by sales without the people who have to get the product to the venue, and the gaps surface as change requests after sign-off. Collect the comments first, publish one brief.