Octanorm & System Stalls Checklist: 20 Things to Confirm Before Your Event

Checklists

Octanorm & System Stalls Checklist: 20 Things to Confirm Before Your Event

Seven phases, one owner each: what to confirm for octanorm & system stalls, when it is due, and what breaks on site when it is assumed instead.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 14 min read

Short answer

An octanorm & system stalls checklist works backwards from show day in seven phases: brief and budget, design sign-off, approvals and pre-production, pre-dispatch inspection, build-up, show days, dismantle. Each phase has a condition that must be true before the next begins — constraints written down, one approved version with a finish schedule behind it, stamped drawings and final artwork, a snag list closed in the workshop, a signed handover, a daily open-of-day check, and a clearance plan agreed before build-up. Give every item a date and a name, and review one shared copy weekly.

Key takeaways

  • Review weekly, and ask what is now unblocked rather than how much has been done.
  • Approve materials and finish codes, not only renders — "as per design" is not something a workshop can cut to.
  • Refuse to start a phase until the one before it has genuinely closed. Early starts cause rework, not speed.
  • Write deadlines as weeks before the show rather than as dates, so a change of show date does not silently invalidate the plan.
  • Tick items on evidence — a photograph, a certificate, a signed list — never on a reassurance.
  • Every item needs a date and a name against it. An unowned item is an item nobody is doing.

Working this octanorm & system stalls checklist

Aluminium octanorm and maxima systems for shell-scheme upgrades, pavilions and budget-friendly participation.

Lists of nouns do not survive a busy fortnight. "Artwork" gets ticked as soon as somebody has emailed about artwork; "artwork at final size, with bleed, approved on the real substrate" cannot be ticked until it is true. Every item here carries the thing that goes wrong when it is skipped, because that is the only part of a checklist anybody reads twice.

Work the phases in order, and do not let enthusiasm start one early. A stand that is late almost never got slow in the workshop — it got started twice, because the phase it depended on had not actually closed when the next one began.

Written for exhibitors, procurement teams and agencies who need a stall built on time, to drawing, and safely at the venue, and deliberately not written for a particular size of stand. A 9 sq.m stand has fewer items in each phase than a pavilion, but it has the same phases, the same gates and the same two owners — one on your side, one on the build side.

  1. 01

    Phase 1 — Brief, area and budget

    Closes when the show, hall, stand number, area, open sides, height limit, budget band and the single visitor action you are designing for are all written down in one place. Nothing should be designed before that is true, because every later decision inherits this one.

  2. 02

    Phase 2 — Design sign-off

    Closes when everyone internally who can reverse the decision has already said yes to the same version number, and the approved set names materials, finishes, lighting positions and electrical load rather than only showing a picture.

  3. 03

    Phase 3 — Approvals, artwork and release

    This is the phase with the queues in it. It ends when approvals are back rather than submitted, certificates exist rather than being arranged, and artwork is final rather than imminent.

  4. 04

    Phase 4 — The pre-dispatch check

    Ends with a decision rather than a date: somebody looks at the finished work, under lights, and says it may be loaded. Treating dispatch as a calendar entry only helps whoever is already behind.

  5. 05

    Phase 5 — Assembly on site

    Finished when you could open the stand to a buyer that minute. If it needs one more hour, build-up is not over, whatever the schedule says.

  6. 06

    Phase 6 — Show days

    Runs until the last visitor on the last day, repeating one short morning list: lights, screens, stock, cleaning, lead capture and a staff briefing. Stands fail on day three, not day one.

  7. 07

    Phase 7 — Dismantle and after

    Not finished when the stand comes down. Finished when the plot is clear, the deposit is back, the reusable parts are labelled in storage and the leads have been contacted.

Stage, owner, deadline

Almost every late stand has a stage in it that two people each believed the other was handling. The fix is unglamorous: name one party per line, and express the deadline in weeks before the show rather than as a date, so the schedule survives the show being moved.

Read the last column first. A stage with nothing downstream of it can slip a few days without damage. A stage that blocks three others cannot slip at all. Organiser approval and print-ready artwork block the most, which is exactly why they sit earlier in the schedule than most exhibitors expect them to.

StageAccountable partyWeeks before showWhat is waiting on it
Brief, area, open sides and budgetExhibitor marketing lead6 weeksEverything — no concept can start without a footprint
Show, hall and stand number checked against the floor planExhibitor, with the organiser6 weeksTransport planning, crew sizing and how many sides the design must finish
Materials, finishes and lighting scheduleDesigner, with the exhibitor5 weeksProcurement and the workshop cut list
Itemised scope frozen and signed line by lineProject manager, exhibitor counter-signs5 weeksEvery later argument on site about what was included
Organiser drawing submission and stamped approvalProject manager, exhibitor counter-signs4 weeksProduction release, rigging, height and any raised structure
Structural and fire certification where requiredFabricator, with a licensed engineer4 weeksDouble-deckers, staircases, hanging rigs and clearance at the gate
Print-ready artwork at final sizeExhibitor brand team3 weeksEvery printed surface, which is most of what a visitor sees
Production release to the workshopProject manager3 weeksFabrication, finishing and the pre-dispatch date
Long-lead items ordered: screens, specialist lighting, importsProject manager3 weeksThe build itself, if the stock is committed elsewhere
Furniture, AV, flooring and plants confirmedProject manager2 weeksDelivery slots, which are allocated in the order they are requested
Staff briefing and lead-capture testExhibitor sales leadShow day −1Day-one lead quality, which has no second attempt
Dismantle, clearance and deposit releaseProject managerAgreed before build-upReturn of reusable elements, and your deposit

Treat the deadlines as a baseline for a mid-size standard-finish build. Our planner's formula gives you your own: 3 weeks to start with, a week more from 24 sq.m, two more from 54 sq.m, two more again for premium finishes and two for a double-decker. Whatever that adds, add it to every row here.

Phase 1 — the brief, and the budget behind it

Nothing later can repair a vague brief; it can only work around it. What belongs here is not taste but limits — how much floor, how many open sides, how high, how many hours of access, how much money, and what the stand has to make a visitor do.

Write the goal as a sentence, not an adjective. A stall layout with a clear entry, a working demo counter, storage that keeps the floor clean, and a closed meeting area for serious buyers is a goal you can design against and judge afterwards. "Premium and impactful" is not, and a stand briefed that way gets approved on taste and reviewed on results.

  • Show name, city, venue, hall and stand number — crews have arrived at the right venue and the wrong hall, and an hour lost at two in the morning is an hour off your finishing time
  • Stall area in square metres and the number of open sides — three open sides means three finished faces, three lighting runs and more staff than an inline stand of identical area
  • The products that will actually stand on the stand, with their weight and dimensions — a machine that will not fit through the hall door is a problem with no on-site solution
  • One named owner for this checklist on your side, with the authority to decide rather than only to report
  • Budget band and exactly what it has to cover — a figure that silently excludes transport, installation, dismantle and taxes is not a budget, it is a deposit
  • Which competitors are exhibiting, and roughly where — position changes what your stand has to do to be noticed from the aisle
  • The internal deadline for saying yes to the show itself, because a late yes is the one delay no schedule can absorb
  • Who can say no, and by when — a stakeholder discovered in week four causes a redesign, while the same stakeholder listed in week one causes a review

Phase 2 — signing off the design properly

Sign-off means two separate things and most exhibitors do only the first. The visual sign-off says the stand looks right. The technical sign-off says the stand can be built, powered, carried, approved and dismantled. A project that has had only the visual sign-off is not ready for production, however enthusiastic the approving email was.

Changes at this stage are free. Changes after production release are paid for in material, labour and time. Changes during build-up are paid for at night-shift rates using whatever material happens to be in the van. The entire value of this phase is that it is the last moment where "actually, can we move the counter" costs nothing at all.

  • A dimensioned, version-numbered drawing set issued to everyone who needs it, so the site crew is not working from three different files with the same name
  • Eye-level views from the aisle, not only a flattering raised corner render — you should be approving what a visitor will actually see when they walk past
  • Ramp, threshold and turning space checked on the floor plan — accessibility is easy on paper and impossible to retrofit
  • A written note of what was rejected and why, so the same idea does not return in week five as a fresh suggestion
  • Sightlines tested from the two or three aisles that actually feed your stand, rather than from the one the render was drawn in
  • A deliberate decision about what the stand does not do, written down, so scope does not grow quietly through the approval chain
  • A meeting area decided deliberately rather than by accident — 5% of the area by default, and more only if you are actually hosting meetings, because a meeting corner added after sign-off comes straight out of display space
  • Concept approved in writing by every internal stakeholder who could reverse it, all against the same version number
A checklist without consequences is a list of nouns, and nouns get ticked without being done.

Phase 3 — approvals, artwork and release

Nothing in this phase looks urgent while it is happening, which is why it is where projects are lost. Two items — the stamped drawing and the final artwork — have most of the project queued behind them, and neither is usually owned by somebody who knows that.

Organiser rules are constraints, not paperwork. They decide how high you may build, what may be hung, what may be brought into the hall and when it must leave — and a rejected submission does not cost a conversation, it costs a working week.

  • Floor loading checked against the hall's limit for anything heavy — a machine, a vehicle, a water feature or a fully stocked store
  • Payment milestones aligned to the production schedule, so finished work is never held at a workshop over an invoice during the last fortnight
  • Fire-retardant certificates for every material entering the hall, carried physically by the site crew — uncertified material gets turned away at the gate, and the gate is not a place to argue
  • The exhibitor manual read by somebody rather than filed by everybody — most of what goes wrong on site was written down in it months earlier
  • The written scope frozen and signed line by line, so that what the workshop builds and what you believe you ordered are demonstrably the same list
  • Rigging and hanging-banner permission confirmed against the hall's actual hook positions rather than assumed ones
  • Lead capture chosen and tested now rather than in the taxi to the venue, with somebody named to export the data each evening
  • Drawings submitted in the organiser's required format, and the stamped approval received back — a submission is not an approval, and the gap between them is a queue you share with the whole hall

Scope check for octanorm & system stalls

Everything in the order should be a line with a quantity, a material and a finish against it. A lump sum hides the two failures that cost real money: an item you are paying for twice because two suppliers both allowed for it, and an item nobody has quoted because each assumed the other had.

Confirm the service scope first, then go hunting for the omissions. Freight, crew, strike and tax between them account for most of the gap between two quotes that look like they describe the same stand.

  • Octanorm and maxima profiles — ask what happens if it fails on day one — whether a spare exists, and who is carrying it
  • Fascia names and graphics — confirm it is priced inside the figure you are comparing, rather than noted as available on request
  • Furniture and lighting packages — name it in the order with a quantity against it, not only in the render — line items are what site crews work from, and renders are not contractual
  • Ideal for pavilions and startups — pin the material and the finish code, because "as per design" is not a specification a workshop can cut to
  • Reprints and small changes after sign-off, priced now rather than negotiated under pressure later
  • Transport to the venue and back, with the vehicle type and the number of trips stated
  • Dismantle and clearance inside the organiser's window, including removal of waste from the hall
  • Electrical fittings, distribution and the labour to connect them, which are frequently a separate trade and a separate bill
  • Storage of reusable elements between shows, and who pays for it

Exhibiting soon? Let's build your stall.

Or use the full form

Phase 4 — before anything is loaded

Nothing should leave the workshop that has not been stood up in the workshop. A full pre-build, or at minimum a part-assembly of the walls, counters and graphic frames, is where a laminate from the wrong batch, a panel cut twenty millimetres short, a door that fouls a counter or a graphic printed to superseded artwork becomes visible while a fitter, a saw and a spare sheet are still ten steps away.

Use one question as the gate: is this good enough to show a customer today? Not good enough to finish on site, not good enough with a bit of touching up — good enough now. Anything less and the load stays where it is, because site time is the most expensive time there is.

  • Fixings, spare laminate, touch-up paint, spare lamps, cable and tools packed deliberately rather than remembered at the last minute
  • Every crate and panel labelled against the drawing, with a loading list signed by the person who physically loaded it
  • Screens and AV tested with your actual content at the actual resolution, not with a manufacturer's test pattern
  • Snag list raised, closed and then re-walked. A snag list that is raised and hoped about is a snag list that travels with the truck
  • Stock, samples and giveaways counted and packed separately from the build, with their own list and their own owner
  • Assembled or part-assembled in the workshop with graphics mounted, so alignment problems surface before dispatch rather than at midnight in a hall
  • Photographed from every side and shared with you for written approval — you do not have to be in the workshop, but you do have to see it
  • A copy of the packing list held by the exhibitor too, so a missing crate can be identified by somebody other than the person who mislaid it

Phase 5 — build-up at the venue

Build-up is a scheduling problem rather than a construction problem. The stand is already built; what happens on site is assembly in a shared, noisy, crowded hall with forklifts, other exhibitors and a hard stop at the end of it. Your real constraint is access hours, and those belong to the organiser. Sequence matters because each trade blocks the next, and out of order you either dismantle something you have just finished or hand over a stand with trunking visible from the aisle.

Read the right-hand column as a list of the ways build-up normally fails. Every one of them is the result of a step taken out of turn rather than a step done badly, which is why the sequence is worth printing and taping up somewhere.

Stage on siteFinished before the next stage startsWhat goes wrong otherwise
Arrival and marking outStand position chalked against the organiser's floor plan, power point locatedA stand built in the wrong place, or built over the only socket in the plot
Platform and flooringRaised floor laid, cables run and hidden, edges finishedTrunking crossing the aisle — a trip hazard and a venue objection
Structure and joineryWalls, counters, storage and any staircase assembled, level and squareGraphics that will not sit flat, because the frame behind them is out of square
Lighting aim and focusEvery spot aimed at a product rather than at the floor or a visitor's eyesA stand that is lit and still looks flat from the aisle
Furniture and plant deliveryHired items checked in against the order and signed forA missing counter discovered on the morning of day one
Cleaning and snaggingStand cleaned, protective film removed, snag list raised and agreedSnags recorded for the first time after doors have opened

Ask for completion a full day before doors open rather than the night before. That day is not comfort — it is the only buffer in the entire programme, and it is where a wrong-sized panel, a dead driver or a missing furniture delivery gets fixed without anybody seeing it.

Phase 6 — show days, every morning

A show runs on a short list repeated daily. The temptation after a hard build-up is to stop managing and start selling, which is how stands arrive at day three with two lamps out, an empty brochure stand, a screen frozen on a dialog box and a lead form nobody has emptied since the first afternoon.

Work the roster from the area: one person per 9 sq.m, never fewer than two. That is about 4 on a 36 sq.m stand and 8 on a 72 sq.m one. Too few and ready buyers walk away unserved; too many and a browser will not step in at all.

  • Stock, samples and brochures replenished from storage before the hall fills, not at lunchtime across a crowded aisle
  • Two or three agreed qualifying questions, so a thirty-second conversation separates a buyer from a bag collector without anybody being rude
  • A five-minute debrief each evening: what visitors asked for, what they walked past, what to move or say differently tomorrow
  • Open-of-day check: every lamp, screen, demo unit, light box and charging point working, done before doors open rather than after the first complaint
  • The stand cleaned and reset every morning — fingerprints on an acrylic panel are visible from the aisle and read as neglect
  • Somebody counting conversations, qualified leads and meetings each day, so the show can afterwards be judged against something
  • A spare of everything that can fail in public: lamp, remote, cable, demo unit, printed brochure
  • A staff roster with real breaks written into it. A tired team on day three is the actual reason conversion falls away, not the design

Phase 7 — strike, clearance and follow-up

The last day is the one with no slack in it at all. Everything has to be out inside a window somebody else set, usually at night, usually at the same time as the rest of the hall. That is not a plan you can make on the day.

Everything before this phase was spent buying conversations. This is the phase that turns them into anything at all. Leads left untouched for a fortnight are indistinguishable from leads you never collected, and the whole cost of the show sits behind them.

  • Photographs taken on the first morning before the crowd arrives — an empty, lit, clean stand is the only usable image you are going to get all week
  • Reusable elements — frames, graphics, counters, furniture, screens — inventoried and labelled as they come out, because unlabelled stock is stock you will rebuild next time
  • A final walk of the empty plot with somebody from the venue, so damage is agreed on the spot rather than invoiced a month later
  • Nothing valuable left on the stand during the final hour of the show, which is when halls are busiest and least supervised
  • An internal debrief inside a fortnight, while the people who stood on the stand still remember what happened on it
  • A written list of what returns to storage, what is scrapped, and what is couriered to whom
  • Graphics kept flat and dry if the artwork will be reused, and scrapped deliberately if it will not
  • Leads scored and followed up within 48 hours, while the conversation is still remembered on both sides of it

The ways this goes wrong anyway

A checklist fails in one of three ways: nobody owns it, it lives in two places, or it is ticked optimistically. The third is the dangerous one. "Graphics are being printed" is not the same statement as "graphics are printed, proofed and crated", and the difference between them only becomes visible on the night of build-up.

The recurring problems on this kind of work are specific. Sub-contracted builds with no quality control, and non fire-retardant materials rejected at the venue. Neither is discovered by looking at a render; both are discovered by asking who does the work and where.

  • Late arrival on site that eats into build-up time
  • Hidden extras for electrical, carpet or dismantling
  • Sub-contracted builds with no quality control
  • Non fire-retardant materials rejected at the venue
  • Items ticked on intention rather than evidence — ask for a photograph, a certificate or a signed list instead of a reassurance
  • Verbal agreements with site crews that nobody carried back into the written scope
  • One person holding every detail in their head, with no handover if they fall ill during show week
  • No named owner for the final 48 hours, when every remaining task is urgent and nobody has the authority to choose between them
  • A checklist reviewed only after something has gone wrong, which makes it a post-mortem rather than a plan

Get the list, and one person to run it

Tell us the show and the plot and we will send this list back with dates on it, alongside a concept and an itemised octanorm & system stalls scope. Two or three reference images are more useful than a long brief.

One accountable project manager, in-house fabrication, organiser drawings and approvals handled, and 3D design included with every confirmed fabrication order. A checklist only works when somebody is paid to close it rather than asked to remember it.

Frequently asked questions

How often should the list be reviewed?+

Weekly until the last fortnight, then daily. The review question is not how much has been done but what is now unblocked, because that is what tells you whether the schedule is still real.

Should deadlines be dates or weeks before the show?+

Weeks before the show. Show dates move, and a list of fixed dates silently becomes wrong the moment they do, whereas weeks-before-show survives the change intact.

What paperwork should the site crew carry?+

The stamped organiser approval, fire-retardant certificates for every material, the structural certificate if there is a raised or two-storey element, vehicle and crew passes, the electrical load declaration and the signed loading list.

What is the item people most often miss?+

Print-ready artwork at final size. The printing itself is quick, but every printed surface waits behind final artwork, so a week lost there moves the whole production schedule and usually the dispatch date with it.

Can you run this checklist for us?+

Yes. Every confirmed order gets a named project manager who owns the schedule, the organiser submissions, the pre-dispatch inspection, build-up, handover and dismantle, and who reports against this list weekly rather than when asked.

Who signs the handover?+

The project manager and somebody from your side, together, walking the stand with the snag list in hand. A handover nobody signed is a handover you cannot refer back to while something is still outstanding.

How long before doors open should the stand be finished?+

A full day, if the organiser's build-up window allows it. That day is your only buffer for a wrong panel, a failed driver or a late furniture delivery, and handing over the night before leaves you none.

What goes wrong most often on site?+

Sequence. Graphics before the frame is square, electrical after the walls are closed, cleaning before the last fitting is done. The structure is rarely the problem; the order the trades work in usually is.