By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 13 min read
Short answer
Before hiring for stall fabrication, ask who physically does the work, what the quote excludes, what drawings you will approve before anything is cut, who prepares the organiser submission, what deliverable each payment milestone releases against, who will be on site during build-up and show days, what the backup plan is if something fails, and who dismantles and clears the stand afterwards. The questions matter less than the shape of the answers: specific, written and verifiable is good, while general reassurance is the warning sign.
Key takeaways
- Ask who physically does the work. Every other answer depends on it.
- Tie each payment milestone to a deliverable you can inspect, and keep a balance payable after handover.
- Insist on approving dimensioned drawings rather than a render before fabrication starts.
- Ask what happens after the show. Dismantle, clearing and storage are where unpriced costs hide.
- Ask what your area can physically hold — at 36 sq.m the honest answer is about 11 visitors and 4 staff.
- Ask what the quote excludes, never whether everything is included — the second question always gets a yes.
How this interview works
The hard part was never the questions. Any vendor will tell you the work is in-house, the price is all-inclusive and their team will be there. What you need is a way of hearing the difference between a sentence that commits to something and a sentence that merely sounds right.
That is why each question carries two notes: the answer that should settle it, and the answer that should worry you. The underlying test never changes. Specifics can be checked; reassurance cannot, and a stall fabrication vendor who offers only the second has told you something useful anyway.
Work through the stages in order. Questions asked at the wrong moment get the wrong answers — pricing questions before the brief is understood produce a number the vendor has to defend rather than revise, and build-up questions asked after signing produce whatever is convenient rather than whatever was planned.
Stage 1 — before you shortlist (questions 1 to 4)
Use this stage to cut a long list down to three. Everything here is about the company rather than your stand, which is exactly why it works early: before a brief exists, there is nothing for the answers to be shaped around.
All of them are really one question asked from several directions: does this firm control the thing it is selling? This guide is written for exhibitors, procurement teams and agencies who need a stall built on time, to drawing, and safely at the venue, and most of them find out the answer during build-up week. You can find it out in a twenty-minute call, which is the whole argument for asking these first.
01
1. Who will be my single point of contact, from brief through dismantle?
A good answer is a name, a role and a mobile number, plus confirmation that the same person is physically on site during build-up and show days. A bad answer is "our team" or "our coordination desk". Shared accountability is no accountability, and a contact who changes at handover means nobody carries the history of your decisions onto the floor.
02
2. Can I visit the workshop or studio this week?
A good answer is a day and an address. A bad answer is any version of "later" — nearer the show, after the order, once the design is approved. The request is routine for anyone buying something fabricated, so reluctance to host it is itself the finding, and you get that finding before spending a rupee.
03
3. Which parts of this scope do you buy in, and from whom?
A good answer names them without being pushed — nobody owns everything, and print, AV, furniture and freight are routinely bought. What you are listening for is whether the person knows their own supply chain. A bad answer treats the question as an accusation, which usually means more of the scope is bought in than they want to discuss.
04
4. How many jobs are in your production queue for my show week?
A good answer is a number, ideally with an unprompted note about which of them is largest — it tells you whether your stand is the priority or the filler. A bad answer is "don't worry, we'll manage", which is what a firm says when the queue is not theirs to see, or when they already know the answer is uncomfortable.
At quoting stage: questions 5 to 8
At this point the brief is out and the quotes are coming back. Everything below exists to stop you comparing two different stands by their totals. None of it is hostile; the supplier who itemises properly is the supplier who will not be arguing with you in March.
Custom fabrication typically ₹9,000–₹18,000 per sq.m depending on finish. The variables that move a stall fabrication price are well known, and the list below is all of them. Ask a vendor which two matter most on your job: a confident, specific ranking means the quote was built, and a vague answer means it was guessed.
- Stall area in square metres and number of open sides
- Finish level (laminate, paint, veneer, acrylic, metal)
- Height, hanging structures and double-decker elements
- LED walls, lighting and raised flooring
- Distance from the workshop to the venue and build-up hours
01
5. Will you itemise the quote, and will you write down what it excludes?
A good answer is yes to both, with the exclusion list as a separate signed page. A bad answer is a lump sum defended as "simpler for you", or an itemised quote with no exclusions at all — which is not transparency, it is an unanswered question. The exclusion page is the single most useful document in the process and the one you have to ask for by name.
02
6. How many light fittings, and where exactly?
A good answer is a count and a set of positions — spots on the brand wall, track over the product, a backlit panel at the entrance. A bad answer is "lighting included". Hall lighting is designed for the aisles rather than for your stand, which makes the lighting count the line most responsible for whether the stand reads as funded or forgotten.
03
7. Is GST included, and what is the pre-tax total?
A good answer gives both figures without being chased, because that is the only way two quotes can be compared on the same basis. A bad answer is ambiguity, or a total that quietly changes basis between the proposal and the invoice. Ask also which organiser or venue charges will be billed through the vendor rather than directly to you.
04
8. What would you change about this brief if it were your budget?
A good answer is an opinion: spend more on lighting, less on joinery, move the storage, drop the second message. A bad answer is "it's perfect as it is". A supplier with no view is either not reading the brief or not willing to risk the order by disagreeing, and neither of those helps you on the floor.
Before you sign: questions 9 to 12
Everything here is about converting agreement into documents. Each question seals a gap that would otherwise open during build-up, when every remaining option costs money. The timing is the point: ask before the advance goes out, not after.
Nothing in this stage touches aesthetics or cost. It is entirely paperwork: what gets signed, when, and by whom. Those are the variables that separate a stand built to the agreement from a stand built to whatever was remembered.
01
9. Will you dry-build the stand in the workshop before dispatch, and can I see proof?
A good answer is yes, with photographs or a video, panels numbered and circuits tested. A bad answer treats it as unnecessary. Where the first assembly happens decides whether build-up is assembly or problem-solving, and problem-solving in a hall costs hours you have not got.
02
10. What happens if you are late?
A good answer is uncomfortable but specific: here is the slack in the schedule, here is who we call, here is what we would do. A bad answer is that it has never happened. You are not really looking for a penalty clause — you are looking for evidence that somebody has thought about the failure case before being inside it.
03
11. Who prepares and submits the organiser paperwork, and by what date?
A good answer lists the actual documents — stand drawings, electrical load, material certificates — names who lodges them, and states the organiser's deadline from memory. A bad answer is "the organiser will tell you what they need", which pushes a hard deadline onto the party least equipped to meet it. A rejected submission costs build-up days nobody has spare.
04
12. What drawings will I approve, and by when, before anything is cut?
A good answer names dimensioned plans and elevations with finishes and lighting positions marked, and gives you a date for sign-off. A bad answer is "you've approved the render". A render is an impression; a drawing is an instruction. If what you signed has no dimensions on it, "this is not what we approved" is an argument you cannot win.
Stage 4 — before build-up (questions 13 to 15)
Ask these once the stand is built and the risk has shifted from the workshop to the loading bay. Few vendors are braced for them, because most buyers stop asking questions after signing — which makes this the stage where the replies are least rehearsed.
Remember what you are buying: a stall layout with a clear entry, a working demo counter, storage that keeps the floor clean, and a closed meeting area for serious buyers. None of that survives a build-up that runs late, so these questions are really about the only hours in the project that cannot be recovered.
01
13. What are you bringing as spares?
A good answer is a short, specific list: laminate offcuts, spare lamps, a reprint of the main graphic, basic tools. A bad answer is that spares will not be needed. Transport damage is routine rather than exceptional, and a crew that travels with the fix turns a two-hour problem into a ten-minute one.
02
14. What is the backup if something fails during show hours?
A good answer is concrete: spares carried to site, a technician reachable within minutes, a named person on the floor through show hours, and a replacement path for anything that would stop the stand working. A bad answer is "nothing has ever failed". Lamps fail, laminate chips, screens drop signal and power trips — the only question is whether somebody planned for it.
03
15. When will the stand be finished, as distinct from when build-up ends?
A good answer is an hour, comfortably ahead of doors opening, with cleaning scheduled after it. A bad answer uses the organiser's deadline as the plan. Finishing at the deadline leaves nothing for the snag list, and every stand has a snag list.
Exhibiting soon? Let's build your stall.
The answers most likely to mislead you
The table below compresses the questions where the answer most often misleads. Each row is the same test: does the reply contain a verifiable specific, or does it contain comfort? Keep it open on the call rather than reading it afterwards.
| Ask this | Good reply | Bad reply |
|---|---|---|
| What happens after the show | Dismantle inside the organiser's window, elements into storage | No answer, because dismantle was never priced |
| What materials are quoted | Board thickness, finish and fire treatment, named | Premium quality, with no specification |
| What will I approve before cutting | Dimensioned plans and elevations, by a stated date | The render you have already been shown |
| Who does the work | An address, a supervisor's name and a date you can visit | A partner network, or a visit that is always better scheduled later |
| What do you need from me | A dated list of inputs | Nothing, we'll handle it |
| Can I see finished work | Photographs from a named show, with the stall area and the year | Renders only, or images with nothing attached to them |
| How many lights | A count and a position for each one | Lighting included |
None of the warning signs is a lie. They are all true statements that cannot be verified, which is exactly what makes them worth noticing.
The capacity question worth adding
Add one question to the 15 above, because it sorts designers from order-takers faster than anything else: how many people fit in my stand at once? A stall fabrication vendor who has thought about the show can answer it; one who has only priced the joinery cannot.
Work it through once and you can check any vendor's answer. Storage: 10% up to 18 sq.m, 15% above. Meetings: 5%, or 20% if that is why you are exhibiting. Display takes the balance, holds one visitor per 2.5 sq.m, and the stand needs one staff member per 9 sq.m of total area.
Why it matters: footfall expectations and stand capacity are usually set by different people who never compare notes. If your campaign is built around a volume of visitors the stand cannot physically hold, the constraint is the stand, not the marketing — and that is a conversation to have at briefing stage, not on day one.
| Stall area | Display | Storage | Staff on duty | Visitors at once | Build weeks |
|---|---|---|---|---|---|
| 12 sq.m | 10.2 sq.m | 1.2 sq.m | 2 | 4 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
| 72 sq.m | 57.6 sq.m | 10.8 sq.m | 8 | 23 | 5 |
| 100 sq.m | 80 sq.m | 15 sq.m | 12 | 32 | 5 |
Figures follow the published ratios — one staff member per 9 sq.m (minimum 2) and one visitor per 2.5 sq.m of display. Build weeks exclude your own approval time.
Answers that should end the conversation
A few answers settle the matter rather than add to it. The stall fabrication failure modes come first, because those are the ones that cannot be fixed on site. The rest are procurement signals, all of which appear before any money has moved.
- Sub-contracted builds with no quality control
- Non fire-retardant materials rejected at the venue
- Late arrival on site that eats into build-up time
- Hidden extras for electrical, carpet or dismantling
- Fabrication offered without drawings for you to approve first
- Reference images that cannot be tied to a show, a size or a year
- A refusal to name the workshop or studio, or a visit that is always possible next month
- No one able to say who will be standing on your stand on build-up morning
- An advance requested before any scope document exists
- Every question fielded by the salesperson and none by anyone who builds
- A material specification that says premium and names nothing
Specifics are short. Reassurance needs paragraphs.
After the interview
Write the answers down as you receive them, in the same order, for every vendor. Three columns on one page does more for the decision than any amount of discussion, because a missing answer looks exactly like a missing answer once it sits next to two filled cells.
Then read the set backwards, from the outcome to the answers. You are not buying a stand; you are buying a result at a show, and the questions only matter in so far as they predict it. A vendor who answers everything well and cannot discuss what the show has to achieve is a builder rather than a partner — useful, but you will have to supply the thinking yourself.
- Who does the work, and the address where it happens
- The project manager's name and mobile number
- The dismantle plan, and where reusable elements are stored
- What the quote excludes, in writing and signed
- The payment milestones and the deliverable behind each one
- What the vendor needs from you, and by when
- The build-up arrival slot, crew size and shift hours
Ask all three at once
Send all three vendors the same brief and the same questions: show name, city, dates, stall area, number of open sides, budget band, and two or three reference images with a line on what you liked about each. Identical inputs are what make the replies comparable, and how quickly and precisely a vendor answers before you have paid anything is the best available preview of how they will answer during build-up week.
We are happy to be interviewed this way — written answers, every question. Design free with a confirmed fabrication order, production in our own workshops, organiser submissions handled, and one named project manager accountable from brief through dismantle.
Frequently asked questions
When should I ask about build-up?+
A week or two before the show, once production is finished. Ask for the arrival slot, the crew size, the shift hours and the hour the stand will be finished and cleaned — not the hour build-up closes.
What should I ask a stall fabrication vendor about pricing?+
Custom fabrication typically ₹9,000–₹18,000 per sq.m depending on finish. Beyond the figure, ask what drives it, what would make it cheaper, which lines are excluded, and what the pre-tax total is. A vendor who can rank the drivers for your brief has priced the job rather than guessed at it.
Is it reasonable to ask to visit the workshop?+
Entirely. It is a routine request for anyone buying a fabricated product, and the reaction to the question is informative even before the visit happens.
What is the best question to catch a sub-contracted build?+
"Can I visit the workshop this week?" A firm that owns production answers with an address and a day. Anything that defers the visit — after the order, nearer the show, once design is approved — is the answer by another route.
Which question matters most?+
Who physically does the work. It decides who controls quality and who controls the date, and every other answer — pricing, drawings, site crew, backup plans — depends on it.
How long should this take?+
About a thirty-minute call for the first stage, then one document request each at quoting and signing. Set against a build that needs 3 weeks or more, it is the cheapest hour in the whole project.
How do I know if my stand is the right size?+
Ask the vendor what it can hold. At 36 sq.m the arithmetic gives about 28.8 sq.m of display, room for roughly 11 visitors at a time and 4 staff on duty. If your footfall expectation is far above that, the constraint is the stand rather than the campaign.
Should the answers be in writing?+
Yes. Scope, inclusions, exclusions, drawing dates, milestones and the named site contact all belong in the quote or the contract. A verbal answer is a recollection, not a commitment.