India's largest stall fabrication network · 119 cities · 1,461 venues
15 Questions to Ask Before You Hire for Exhibition Stall Design

Questions to Ask

15 Questions to Ask Before You Hire for Exhibition Stall Design

What to ask an exhibition stall design vendor, and more usefully, how to read the reply: 15 questions arranged by buying stage, each paired with the answer that should reassure you and the one that should not.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 13 min read

Short answer

The 15 questions worth asking an exhibition stall design vendor cover four things: who owns the work, what the price actually includes, what goes in writing before you pay, and who is in the hall during build-up. Judge the replies by shape rather than content — a name, a date, a document or a number is an answer, and anything that merely reassures you is not.

Key takeaways

  • Insist on approving dimensioned drawings rather than a render before fabrication starts.
  • Ask who physically does the work. Every other answer depends on it.
  • Ask what happens after the show. Dismantle, clearing and storage are where unpriced costs hide.
  • Ask what the vendor would change about your brief. A supplier with no opinion is not reading it.
  • Tie each payment milestone to a deliverable you can inspect, and keep a balance payable after handover.
  • Put the same questions to three vendors and write the answers in three columns. The gaps do the work for you.

How to use these 15 questions

A list of questions is easy to find and nearly useless on its own, because every vendor has a comfortable answer ready for each one. What separates a real supplier from a confident one is the texture of the reply: whether it contains something you could check later.

That is why each question carries two notes: the answer that should settle it, and the answer that should worry you. The underlying test never changes. Specifics can be checked; reassurance cannot, and an exhibition stall design vendor who offers only the second has told you something useful anyway.

Work through the stages in order. Questions asked at the wrong moment get the wrong answers — pricing questions before the brief is understood produce a number the vendor has to defend rather than revise, and build-up questions asked after signing produce whatever is convenient rather than whatever was planned.

First stage — is this firm worth briefing? (questions 1 to 4)

This is the filtering stage, and it is best done on the phone in twenty minutes. None of these questions needs your brief, your budget or your drawings — which means nobody can tune the answers to them.

Notice that they circle one issue: ownership of the work. For marketing heads, brand managers and event agencies who need a stall concept that is approved quickly and builds exactly as rendered, that is the single fact most likely to be discovered too late, and it is also the easiest to establish early if you simply ask directly.

  1. 01

    1. How many jobs are in your production queue for my show week?

    A good answer is a number, ideally with an unprompted note about which of them is largest — it tells you whether your stand is the priority or the filler. A bad answer is "don't worry, we'll manage", which is what a firm says when the queue is not theirs to see, or when they already know the answer is uncomfortable.

  2. 02

    2. Can I visit the workshop or studio this week?

    A good answer is a day and an address. A bad answer is any version of "later" — nearer the show, after the order, once the design is approved. The request is routine for anyone buying something fabricated, so reluctance to host it is itself the finding, and you get that finding before spending a rupee.

  3. 03

    3. Have you worked at my venue, and what are its rules on height, rigging and fire rating?

    A good answer is specific about the hall — the height limit, whether rigging is allowed, what fire certification the organiser demands, and when drawings have to be submitted. A bad answer is "we work at every venue in India". Breadth is not the claim you need; one correct hall rule tells you more than a list of twenty cities.

  4. 04

    4. Which parts of this scope do you buy in, and from whom?

    A good answer names them without being pushed — nobody owns everything, and print, AV, furniture and freight are routinely bought. What you are listening for is whether the person knows their own supply chain. A bad answer treats the question as an accusation, which usually means more of the scope is bought in than they want to discuss.

Stage 2 — while you are being quoted (questions 5 to 8)

Now you have two or three vendors working from the same brief. These questions are what make their numbers comparable, and they are the ones most often skipped because they feel adversarial. They are not — a vendor who answers them well is making their own life easier too, since an itemised scope is also their defence against scope creep.

Design is included free with fabrication orders; standalone design from ₹25,000. The variables that move an exhibition stall design price are well known, and the list below is all of them. Ask a vendor which two matter most on your job: a confident, specific ranking means the quote was built, and a vague answer means it was guessed.

  • Number of concept options and revision rounds
  • Depth of 3D work (stills, 360° views or walkthrough video)
  • Technical drawing detail required by the organiser
  • Whether design is bundled with fabrication
  1. 01

    5. Are transport both ways, installation, electrical fittings and dismantle inside this figure?

    A good answer goes line by line, yes or no, without hedging. A bad answer is a general "yes, everything's included" — which is the reply this question always draws, and the reason to put it as four separate questions. These are the four scopes most often missing, none of them is optional, and all of them get bought at show-week rates when they surface late.

  2. 02

    6. If I remove something from this quote, what does the total become?

    A good answer is a revised figure within a day, because the quote was assembled from line items in the first place. A bad answer is a vague "we'll adjust" or a total that barely moves — the first means there were no line items, the second means the removed item was never honestly costed.

  3. 03

    7. How many light fittings, and where exactly?

    A good answer is a count and a set of positions — spots on the brand wall, track over the product, a backlit panel at the entrance. A bad answer is "lighting included". Hall lighting is designed for the aisles rather than for your stand, which makes the lighting count the line most responsible for whether the stand reads as funded or forgotten.

  4. 04

    8. Is GST included, and what is the pre-tax total?

    A good answer gives both figures without being chased, because that is the only way two quotes can be compared on the same basis. A bad answer is ambiguity, or a total that quietly changes basis between the proposal and the invoice. Ask also which organiser or venue charges will be billed through the vendor rather than directly to you.

Third stage — turning a conversation into a contract (questions 9 to 12)

This is the stage that decides whether you have a contract or an understanding. Each gap left open here is one you will meet again in the hall, at a moment when you have no leverage and no time.

Note that none of these is about design or price. They are about documents, dates and authority — the three things that determine whether a stand gets built as agreed or as improvised.

  1. 01

    9. What are the payment milestones, and what does each one release against?

    A good answer attaches every instalment to something inspectable: a signed scope, approved drawings, the submission acknowledgement, a workshop dry build, handover of a working stand. A bad answer is a schedule of bare dates, or most of the money up front. Keep a meaningful balance payable after handover — it is what keeps a crew on the stand on show morning.

  2. 02

    10. What drawings will I approve, and by when, before anything is cut?

    A good answer names dimensioned plans and elevations with finishes and lighting positions marked, and gives you a date for sign-off. A bad answer is "you've approved the render". A render is an impression; a drawing is an instruction. If what you signed has no dimensions on it, "this is not what we approved" is an argument you cannot win.

  3. 03

    11. Will you dry-build the stand in the workshop before dispatch, and can I see proof?

    A good answer is yes, with photographs or a video, panels numbered and circuits tested. A bad answer treats it as unnecessary. Where the first assembly happens decides whether build-up is assembly or problem-solving, and problem-solving in a hall costs hours you have not got.

  4. 04

    12. How are changes priced, and who is allowed to authorise one?

    A good answer is a written variation, priced before it is executed, authorised by one named person on each side. A bad answer is "we'll adjust at the end". Verbal agreements made on the floor during build-up are the largest single source of post-show invoices nobody remembers approving, and one paragraph in the contract prevents all of them.

Stage 4 — before build-up (questions 13 to 15)

Ask these once the stand is built and the risk has shifted from the workshop to the loading bay. Few vendors are braced for them, because most buyers stop asking questions after signing — which makes this the stage where the replies are least rehearsed.

The outcome you paid for is a design that guides visitors to a demo point and a meeting zone, rather than one that only looks good in a render — and it is won or lost in the last twenty-four hours before doors open. That is the window these questions are about.

  1. 01

    13. When will the stand be finished, as distinct from when build-up ends?

    A good answer is an hour, comfortably ahead of doors opening, with cleaning scheduled after it. A bad answer uses the organiser's deadline as the plan. Finishing at the deadline leaves nothing for the snag list, and every stand has a snag list.

  2. 02

    14. Who dismantles and clears the stand, and what happens to the reusable elements?

    A good answer is the same crew, inside the organiser's dismantle window, with the reusable frames and graphics named and a storage arrangement stated. A bad answer is silence, because dismantle was never priced. This is where deposits are forfeited, penalties are charged, and assets you paid to fabricate quietly go to landfill.

  3. 03

    15. What do you need from me, and by when?

    A good answer is a dated list: artwork at final size, product dimensions, staff numbers, any samples to be displayed. A bad answer is "nothing, we'll handle it". Most build-up delays trace back to an input that arrived late, and a supplier who has not asked for yours has not planned backwards from the date.

Exhibiting soon? Let's build your stall.

Or use the full form

A quick reference for the call

The table below compresses the questions where the answer most often misleads. Each row is the same test: does the reply contain a verifiable specific, or does it contain comfort? Keep it open on the call rather than reading it afterwards.

The questionWhat a real answer containsWhat should make you pause
What materials are quotedBoard thickness, finish and fire treatment, namedPremium quality, with no specification
How many lightsA count and a position for each oneLighting included
Who submits to the organiserThe documents, the person and the deadlineThe organiser will let you know
Who is on site at build-upA name, a crew size and the shift hoursOur team will be there
What would make it cheaperA scope trade — simpler finish, fewer panels, a reused frameA flat discount with no change to the scope
Who does the workAn address, a supervisor's name and a date you can visitA partner network, or a visit that is always better scheduled later
What if something fails mid-showSpares on site and a named person in the buildingNothing has ever failed

The good column is almost always the shorter one. That is the quickest heuristic in this guide — specifics are compact, and reassurance needs room.

The size question most exhibitors never ask

A final question, and the most revealing of the lot: what will my area actually hold? It takes an exhibition stall design vendor about ten seconds to work out, which means an evasive answer is not a limitation of the question.

Work it through once and you can check any vendor's answer. Storage: 10% up to 18 sq.m, 15% above. Meetings: 5%, or 20% if that is why you are exhibiting. Display takes the balance, holds one visitor per 2.5 sq.m, and the stand needs one staff member per 9 sq.m of total area.

Why it matters: footfall expectations and stand capacity are usually set by different people who never compare notes. If your campaign is built around a volume of visitors the stand cannot physically hold, the constraint is the stand, not the marketing — and that is a conversation to have at briefing stage, not on day one.

Stall areaDisplayStorageStaff on dutyVisitors at onceBuild weeks
12 sq.m10.2 sq.m1.2 sq.m243
18 sq.m15.3 sq.m1.8 sq.m263
36 sq.m28.8 sq.m5.4 sq.m4114
72 sq.m57.6 sq.m10.8 sq.m8235
100 sq.m80 sq.m15 sq.m12325

Same arithmetic as the stall planner: staffing is area ÷ 9 with a floor of 2, and the lead time runs 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for premium finishes and +2 for a second storey.

When the answer is the decision

A few answers settle the matter rather than add to it. The exhibition stall design failure modes come first, because those are the ones that cannot be fixed on site. The rest are procurement signals, all of which appear before any money has moved.

  • Renders that cannot be built within the budget
  • Designs that ignore organiser height and setback rules
  • No material or finish specification, so the build looks different from the render
  • Reference images that cannot be tied to a show, a size or a year
  • A refusal to name the workshop or studio, or a visit that is always possible next month
  • Fabrication offered without drawings for you to approve first
  • A discount offered the moment you hesitate, with nothing removed from the scope
  • No answer at all on dismantle, clearing or storage
  • No one able to say who will be standing on your stand on build-up morning
  • A material specification that says premium and names nothing
Every vendor sounds the same until you ask who is in the hall on build-up morning.

What to do with the answers

Write the answers down as you receive them, in the same order, for every vendor. Three columns on one page does more for the decision than any amount of discussion, because a missing answer looks exactly like a missing answer once it sits next to two filled cells.

Then read the set backwards, from the outcome to the answers. You are not buying a stand; you are buying a result at a show, and the questions only matter in so far as they predict it. A vendor who answers everything well and cannot discuss what the show has to achieve is a builder rather than a partner — useful, but you will have to supply the thinking yourself.

  • The date on which you will approve dimensioned drawings
  • What the vendor needs from you, and by when
  • What the quote excludes, in writing and signed
  • The payment milestones and the deliverable behind each one
  • The material specification, including the fire treatment
  • Who submits the organiser paperwork, and the deadline
  • The project manager's name and mobile number

Send the questions with your brief

One email, three recipients, same day — brief plus questions. Include the show, the city, the dates, the area, the open sides, your budget band and two or three images with a note on each. What comes back tells you as much about the firm as about the stand.

We are happy to be interviewed this way — written answers, every question. Design free with a confirmed fabrication order, production in our own workshops, organiser submissions handled, and one named project manager accountable from brief through dismantle.

Frequently asked questions

Should the answers be in writing?+

Yes. Scope, inclusions, exclusions, drawing dates, milestones and the named site contact all belong in the quote or the contract. A verbal answer is a recollection, not a commitment.

Should I ask about things that could go wrong?+

Yes, and the quality of the answer matters more than the content. A vendor who describes the slack in their schedule, the spares they carry and who they would call has thought about failure. One who says nothing has ever gone wrong has not.

What should I ask an exhibition stall design vendor about pricing?+

Design is included free with fabrication orders; standalone design from ₹25,000. Beyond the figure, ask what drives it, what would make it cheaper, which lines are excluded, and what the pre-tax total is. A vendor who can rank the drivers for your brief has priced the job rather than guessed at it.

What should I ask about the venue's rules?+

Ask for the height limit, whether rigging is permitted, the fire certification the organiser requires, and the date drawings must be submitted. Specific knowledge of one hall beats a claim to work in every city.

How do I know if my stand is the right size?+

Ask the vendor what it can hold. At 36 sq.m the arithmetic gives about 28.8 sq.m of display, room for roughly 11 visitors at a time and 4 staff on duty. If your footfall expectation is far above that, the constraint is the stand rather than the campaign.

How long should this take?+

About a thirty-minute call for the first stage, then one document request each at quoting and signing. Set against a build that needs 3 weeks or more, it is the cheapest hour in the whole project.

What if a vendor refuses to itemise the quote?+

Treat the refusal as the answer. Without line items you cannot compare two quotes, remove scope you do not need, or tell the difference between a cheaper vendor and a smaller scope.

How many vendors should I put these questions to?+

Three, with the same brief. Two gives you nothing to calibrate an outlier answer against, and five is more work than the comparison repays.

Exhibition Stall Design near you

Our crews deliver exhibition stall design in every major Indian city.

Powered byIRPR