By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read
Short answer
Priced mainly by drone count and show length; share your event date, city and audience size for a quote. The final price for drone light shows in India depends mainly on show duration and number of event days, equipment size and specification (screen size, projector brightness or drone count) and content creation and programming time. The fastest way to an exact figure is to share your event, dates, size and reference images and ask for an itemised quote rather than a lump sum.
Key takeaways
- Priced mainly by drone count and show length; share your event date, city and audience size for a quote.
- The biggest cost drivers are show duration and number of event days and equipment size and specification (screen size, projector brightness or drone count).
- A lump sum cannot be compared with anything. Two itemised quotes against one written scope can.
- Four lines are missing from most cheap quotes: the return journey, the crew, the dismantle, and the tax.
- The cheapest stand you will ever build is the second outing of one you already own.
- Changing your mind is free while the concept is being designed and expensive at every stage after it.
Drone light shows: the published ranges
Hundreds of synchronised LED drones draw your logo, product or message in the night sky for launches, festivals, weddings, sports events and corporate celebrations. We coordinate show design, permissions with licensed operators, launch-site safety and timing with your event.
Priced mainly by drone count and show length; share your event date, city and audience size for a quote. Expect a modest premium in Delhi NCR, Mumbai and Bengaluru, driven by venue labour rules and compressed build-up windows rather than by the build itself. A Tier 2 city planned four weeks out is frequently the cheapest version of the same stand.
Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.
The band has an arithmetic shape worth seeing. Because ₹18,000 is twice ₹9,000, the same build money buys either a large plain stand or half the area beautifully finished. Exhibitors who have decided which of those they need brief quickly and buy well; exhibitors who have not spend the whole process trying to have both.
| Construction type | Where it sits on cost | What you still own afterwards | Typical fit |
|---|---|---|---|
| Shell scheme upgrade | Lowest | Graphics only | 9–18 sq.m, first-time or budget exhibitors |
| Octanorm / system build | Low | Frame and graphics | 9–36 sq.m, exhibitors doing several shows a year |
| Modular with custom graphics | Medium | Frame, graphics, furniture | 18–54 sq.m, repeat exhibitors wanting a branded look |
| Custom wooden build | ₹9,000–₹18,000/sq.m | Limited | Any size where the stand must look bespoke |
| Double-decker | Quoted per project | Structure, with engineering | 72 sq.m and above, when meetings would eat display space |
Only the custom band is a published per-sq.m rate. The others are positions relative to it, because what they cost depends on how much of the frame already exists.
What drives the cost
A quote is not a number, it is a set of decisions you have already made without realising it. These are the variables doing the work, and each one is negotiable before the brief goes out and expensive afterwards.
Open sides are the variable exhibitors forget to price. Each additional open face adds finished surface, another lighting run and another person to staff it — which is why two stands of identical area can quote very differently.
Then there is the pair nobody prices at briefing stage: lead time and finish level. 5 weeks is the schedule for 54 sq.m — take that away and you have not saved anything, you have bought the same work on an overtime shift. Finish is the other one: specify veneer where laminate would read identically from the aisle and you have spent the lighting budget on something visitors cannot see.
- Permissions, venue rules and rehearsal time
- Show duration and number of event days
- Equipment size and specification (screen size, projector brightness or drone count)
- Content creation and programming time
- Rigging, power backup and technician crew size
- Whether the build-up window runs in daytime hours or forces a night shift
- The number of open sides, which decides how many faces have to be finished
- The number of approval rounds before the drawing is frozen
- The finish on surfaces visitors can touch, as against the ones they cannot
You cannot compare two quotes until both describe the same stand.
What a drone light shows quote should itemise
A professional quote lists every element separately so you can compare vendors fairly and remove items you do not need. A lump sum hides which of these you are about to pay for twice — or not at all.
Four lines go missing more often than the rest: the return journey, the on-site crew, the dismantle, and the tax. On this page's illustrative 54 sq.m figures, transport and installation alone are ₹1,60,000 — which is what a quote without them is quietly saving.
Three small lines are worth more than their value on experience and AV work: material certification, the organiser submission, and a named project manager with a telephone number. Each is cheap to include and painful to arrange once the hall has opened its doors to build-up.
- Installation, the on-site crew, and who supervises them
- Organiser drawing submission and approval handling
- Transport to the venue and the return leg, stated separately
- Night-shift or overtime labour, if the build-up window forces it
- Custom 2D and 3D sky formations and brand logos
- Licensed operators and permission coordination
- Launch-site safety plan and backup drones
- Music sync and live event cue integration
- Pre-build or dry assembly at the workshop before dispatch
- Dismantle and clearing the stand inside the organiser's window
Fifty-four square metres, costed properly
An example is worth more than a range. This one is 54 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.
At ₹9,74,000 this stand works out at roughly ₹18,037 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹4,88,000, a little more than the fabrication itself.
Read it with two corrections in mind. First, the band: the structure here is at ₹9,000 per sq.m, and the same area at the top of the band is ₹9,72,000 instead of ₹4,86,000. Second, tax: everything above is pre-GST. Those two adjustments are the difference between a planning figure and a quote.
| Structure and joinery (54 sq.m × ₹9,000) | ₹4,86,000 |
|---|---|
| Raised flooring and carpet | ₹62,000 |
| Furniture — counters, seating, planters | ₹54,000 |
| Graphics — brand wall, tensioned fabric and vinyl | ₹1,34,000 |
| Lighting — track, aimed spots and backlit panels | ₹78,000 |
| Transport, both ways | ₹68,000 |
| Installation, crew and dismantle | ₹92,000 |
| Indicative total, before GST | ₹9,74,000 |
Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.
Area against finish: what the band actually means
This is the comparison most briefs skip. At every size, the band gives you a lower figure and an upper one, and the gap between them is not padding: it is finish, light, floor and detail. The last column names what it buys, so you can decide whether you want it more than you want the extra square metres.
The arithmetic has a tidy consequence. ₹18,000 less ₹9,000 is ₹9,000, which is the lower figure, so the money that upgrades a stand from the bottom of the band to the top would instead have doubled its area. Whichever you pick, you are spending the same amount — which means the decision is about what the stand has to do, not about what it costs.
Choose by the job, not the taste. Anything involving queuing, demonstrating, handling or sitting down is an argument for area, because the premium finish on a stand nobody can enter is money spent on photographs. Anything involving persuasion rather than throughput is an argument for finish — and in that case a smaller stand, properly lit, beats a larger one that looks provisional.
| Stall size | Lower end of the band | Upper end of the band | The spread pays for |
|---|---|---|---|
| 9 sq.m | ₹81,000 | ₹1,62,000 | Better print, aimed light instead of clip lamps, and an edge finish that survives the week |
| 12 sq.m | ₹1,08,000 | ₹2,16,000 | A laminate that survives handling, a lighting track, and a counter that locks |
| 36 sq.m | ₹3,24,000 | ₹6,48,000 | Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner |
| 72 sq.m | ₹6,48,000 | ₹12,96,000 | Architectural form — curves, a ceiling element, and a stand that reads as a building |
| 100 sq.m | ₹9,00,000 | ₹18,00,000 | All of the above, plus the engineering a raised or second-storey element needs |
Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.
Where the difference between two prices lives
Two quotes for one brief rarely differ because one vendor is greedy. They differ because the brief left a dozen decisions open and each vendor closed them differently — one in the direction of looking affordable, the other in the direction of looking thorough.
We have itemised the gap below rather than describing it. Starting from the 54 sq.m example at ₹9,74,000, six reasonable-sounding assumptions produce ₹7,56,000 instead. The ₹2,18,000 between them is 22% of the total, and every rupee of it is a decision about scope that the brief did not make.
The remedy is unglamorous. Write the specification yourself — board, graphics medium, number of fixtures, flooring type, furniture list, crew and shift — and send the same page to everybody. The prices that come back will be close together, and you will be choosing a vendor rather than guessing at a scope.
| Line | The two readings of your brief | What to put in writing |
|---|---|---|
| Installation | A day crew against a night-shift crew, with or without supervision | How many crew, on which shift, and who supervises them? |
| Who builds it | One quote comes from the workshop; the other from somebody who will find one | Whose workshop is it, and may we see a build in progress? |
| Structure | Ply and MDF to a finished edge in one quote, a lighter board with an exposed edge in the other | Name the board, the thickness and the edge finish |
| Taxes | One total is before tax and the other after it | Give me both the pre-tax and the post-tax figure |
| Dismantle | Frequently missing from the cheaper quote entirely | Is clearing the stand inside the organiser's window in this price? |
| Lighting | Fourteen aimed fixtures against six, or against none at all | How many fixtures, of what type, aimed at what? |
| Flooring | A raised platform with cable management against carpet on the hall floor | Raised or not, and where do the cables run? |
| Drawings and approvals | One vendor is preparing the organiser submission; the other expects you to | Who prepares the drawings, and who submits them? |
Work down the list before you negotiate. A gap explained is usually a gap you no longer want closed, because you now know which stand you are buying.
| Lighter board in the structure, with an exposed edge instead of a finished one | ₹62,000 |
|---|---|
| Printed flex taped to panels instead of tensioned fabric on a frame | ₹38,000 |
| Six aimed spots instead of fourteen, and no backlit panel | ₹26,000 |
| Carpet laid straight on the hall floor instead of a raised platform with cable management | ₹30,000 |
| A four-piece hired furniture package instead of eight pieces | ₹17,000 |
| Installation and dismantle left as "to be advised" | ₹45,000 |
| Total difference between the two quotes | ₹2,18,000 |
Illustrative, built by making six substitutions to the 54 sq.m example above. The higher quote is ₹9,74,000 and the lower is ₹7,56,000; the difference is ₹2,18,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.
The false economies, and the real ones
Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.
One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.
Both halves of the distinction follow. First the lines that genuinely are optional — and these are usually the bigger numbers, which is the happy part of this section. Then, in the table, the ones that only look optional, each with its consequence spelled out.
- Fabricated furniture, where hired furniture would have been collected afterwards anyway
- A second screen that repeats what the first screen is already showing
- Backlighting on every panel, rather than on the one panel you want looked at
- Wall height above the sightline, which costs material and is read by nobody
- A printed floor, when plain carpet in the brand colour does the same job
- Working shutters and locks on storage that nobody will see
| What exhibitors delete first | The reasoning at the time | Where it turns up again |
|---|---|---|
| Storage between shows | We will decide after this one | "After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable |
| The cable and socket count on the drawing | That is site detail | Site detail becomes a visible extension lead across the floor of a stand you paid to look expensive |
| A graphics proofing round | The artwork is final | Large-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall |
| The power load calculation | The organiser supplies power | The organiser supplies the load you declared. A screen added after the declaration is a screen without power |
| Pre-build at the workshop | The crew can assemble it on site | Site is where there is no spare panel, no saw and no time. A dry run finds the problem while it is still cheap |
| Packing crates and transport cover | It travelled fine last time | Once is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day |
| A single project manager | Each vendor manages themselves | Then every gap between vendors is yours to discover, usually at eight o'clock on the first morning |
If the budget genuinely will not stretch, cut from the list below this table instead. These lines are the ones that cost more when they are missing.
The venue is the most expensive shop in India, and it only opens when you have run out of time.
What changing your mind costs, stage by stage
The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.
This is why the design stage deserves more of your time than it usually gets. 5 weeks is our schedule for 54 sq.m — 3 weeks base plus 2 for the area — and the hours you spend arguing about the layout in week one are the cheapest hours in the whole programme. A premium finish adds 2 weeks and a double-decker another 2, so the window is longer than most briefs assume and still not long enough for a change of mind in production.
There are two defences, and both are administrative. One approver on your side, with the authority to sign the drawing and the finish schedule. And an agreed variation process: who asks, who approves, and whether the price is confirmed before the work happens. Both cost nothing and both prevent the expensive version of this table.
| When the change comes | What it costs | Why |
|---|---|---|
| After design sign-off, before production | A redraw and a requote | Drawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you |
| After materials are ordered | The material, plus its replacement | Board, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts |
| In production | The labour already spent, plus the labour to redo it | A fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved |
| After graphics go to print | A full reprint of the affected panel | Large-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment |
| During build-up | Night-shift labour, and whatever can be improvised | There is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you |
| Once the show has opened | Usually nothing can be done at all | The hall is open and the stand is public. The only honest response is to write it down for the next edition |
Nothing in this table is a penalty. Each row is simply work that has to be done twice, plus whatever the first attempt cost in material.
Exhibiting soon? Let's build your stall.
Working back from the number you have
In practice the budget usually exists before the brief. That is not a problem; it is a better starting point, provided you do the subtraction first. The step that gets skipped is taking out the exhibiting costs that never appear on a stall quote at all, because those are the ones that arrive late and unbudgeted.
The allocation below is illustrative — a planning habit rather than a rule, and we have no source for a standard split. First, though, the list below: the exhibiting costs that never reach a stall quote at all. The allocation table after it is shown against ₹15,00,000 so the arithmetic is visible. Its important feature is the bottom two rows: ₹1,50,000 of ₹15,00,000 is money a stand builder never sees, and ₹75,000 of it is deliberately not allocated at briefing stage.
The build line comes to ₹6,75,000, which buys 75 sq.m of structure at the bottom of the published band and 37.5 sq.m at the top. Hold that against the stall you have booked. If the booked area is larger than 75 sq.m, the arithmetic is telling you to use a system build rather than a custom one, and it is telling you now rather than in week three.
- Exhibitor badges, extra passes and vehicle parking
- Lead-capture devices, the data connection, and somewhere to charge them
- Printed collateral, samples, and anything you intend to hand over
- Insurance on goods in transit and on the stand itself
- The cost of your own team being away from their desks for the build-up and the show
- Promoters, hostesses or interpreters, if your visitors need them
- Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
- Space rental, invoiced to you by the organiser rather than by your stand builder
| Budget line | Illustrative share | At a total of ₹15,00,000 |
|---|---|---|
| Stand build — structure, joinery and finish | 45% | ₹6,75,000 |
| Graphics, lighting and AV | 20% | ₹3,00,000 |
| Flooring and furniture | 10% | ₹1,50,000 |
| Transport, installation and dismantle | 15% | ₹2,25,000 |
| Your own show costs — travel, staffing, collateral, hospitality | 5% | ₹75,000 |
| Contingency, held back rather than allocated at briefing | 5% | ₹75,000 |
Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹15,00,000. The first four rows, ₹13,50,000, are what a stand builder quotes against. GST sits on top.
Size, space and what fits inside it
Before comparing prices per square metre, look at what a square metre does. Our planner's ratios are simple: storage at 10% up to 18 sq.m and 15% beyond it, a default 5% for a meeting corner, and the balance as display. Apply them and most stall-size arguments resolve themselves.
The visitors column is the one most exhibitors never calculate. Divide display area by 2.5 and you get roughly how many visitors can stand in the stand at once — which tells you whether your staffing plan and your footfall expectation are compatible.
Treat the weeks column as money. 3 weeks base, one more from 24 sq.m, 2 more from 54 sq.m, 2 more for a premium finish, 2 more for a second storey. Every week you take off the front of that schedule is bought back later at a worse rate, which is why late booking is a price decision rather than a planning one.
| Stall size | Display area | Storage | Staff needed | Visitors at once | Build weeks |
|---|---|---|---|---|---|
| 9 sq.m | 7.6 sq.m | 0.9 sq.m | 2 | 3 | 3 |
| 12 sq.m | 10.2 sq.m | 1.2 sq.m | 2 | 4 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 72 sq.m | 57.6 sq.m | 10.8 sq.m | 8 | 23 | 5 |
Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.
Paying for it: stages and deliverables
Payment terms vary by vendor, by scope and by how long the two of you have worked together, and we are not going to invent a standard split — there is no honest source for one. What can be said without inventing anything is what each stage ought to correspond to, and that is the part worth negotiating.
One rule covers most of it: tie money to evidence. Drawings approved, materials bought, a pre-build you can inspect, a stand handed over complete — those are things you can see. Dates are not evidence of anything, because a date arrives whether or not the work did.
The item to settle alongside the schedule is how changes get priced. Who approves them on your side, in what format, and is the figure confirmed before work starts? Nearly every uncomfortable conversation about an exhibition invoice began as a change that nobody priced at the moment it was agreed.
01
Get the tax position in writing
Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.
02
Write the variation process down before there is a variation
Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.
03
Ask for the schedule inside the quote
Payment terms belong in the same document as the itemised scope, not in a separate message afterwards. If the stages and the deliverables are written on one page, you can see whether they line up — and if they do not, that is a conversation to have before you sign rather than in week three.
04
Confirm what the first payment actually unlocks
Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.
05
Keep the organiser's bills on a separate line
Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.
06
Tie every stage to something you can see
A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.
A milestone with no deliverable attached is a date, and a date is not a milestone.
How the cost per show falls across a year
A single-show cost is the wrong number for anybody exhibiting more than once a year. What matters is the average across the programme, and that average drops a long way after the first show — provided the first stand was conceived as something that would come down in panels rather than in pieces.
The worked example here is show two, with the same structure. Reprint the graphics, refurbish what the first show marked, pay for storage in between, and pay transport and installation again. ₹2,96,000 rather than ₹9,74,000: 30% of the first outing, with ₹6,78,000 of the original build simply not purchased again.
Extended to a third show in the table, the average per show becomes about ₹5,22,000, against ₹9,74,000 for the first outing alone: a 46% fall. No negotiation produces that. It comes entirely from a design decision taken before the first panel was cut, which is why it has to be asked for at briefing stage.
It depends on three things being true. A modular structure that comes apart without damage; graphics as a removable layer rather than as part of the wall; and storage, which costs money and is therefore a line in the example rather than an assumption. Miss any one and the second show is close to the price of the first.
| Outing | This edition | Spent to date | Running average |
|---|---|---|---|
| Show 1 — the first build | ₹9,74,000 | ₹9,74,000 | ₹9,74,000 |
| Show 2 — same structure, new graphics | ₹2,96,000 | ₹12,70,000 | ₹6,35,000 |
| Show 3 — same structure, new graphics | ₹2,96,000 | ₹15,66,000 | ₹5,22,000 |
Illustrative, built from the two worked examples on this page: ₹9,74,000 for the first build and ₹2,96,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.
| Graphics reprinted for the new show and the new message | ₹67,000 |
|---|---|
| Refurbishment — replaced panels, touch-up paint, relaminating what is marked | ₹45,000 |
| Storage of the structure between the two shows | ₹24,000 |
| Transport, both ways | ₹68,000 |
| Installation, crew and dismantle | ₹92,000 |
| Indicative second-show total, before GST | ₹2,96,000 |
Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹9,74,000, this is 30%, so ₹6,78,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.
How to reduce cost without looking cheap
Budget by sightline. What faces the aisle deserves the spend; storage walls, back-of-house and anything above head height does not, because nobody is looking at it.
Three habits cut more than any negotiation does — reuse the frame, hire rather than build the furniture, and keep graphics on fabric so next year's edition costs a reprint instead of a rebuild.
What not to cut is lighting. Hall lighting is designed for circulation, not for your product, so an unlit stand reads as under-funded no matter what the joinery cost. It is the cheapest line with the largest visible effect.
The savings that work are the ones decided early. Booking inside the lead time, redesigning after sign-off and adding scope in production are not savings at all — they are the three most reliable ways to spend more than you planned. Every item in the list below has to be chosen before the brief is frozen to be worth anything.
- Upgrade a shell scheme instead of building raw space, for stalls under 18 sq.m
- One strong message instead of five competing ones, which is cheaper and also works better
- Hire the AV for the week instead of buying a screen you will then have to store
- Choose a laminate that reads like veneer from a metre away, and spend the difference on light
- Share a lorry with your own product freight, if the dates allow it
- Reuse a modular structure across several shows — the second outing costs a fraction of the first
- Keep graphics on fabric, so the next edition is a reprint instead of a rebuild
The three expensive failures
Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: under-specified equipment that looks dull in a bright hall. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.
The second failure is unwritten scope. A quote that does not name the board, the fixture count and the flooring type is a quote for an unspecified stand, and two such quotes cannot be compared with each other at all.
And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.
- Under-specified equipment that looks dull in a bright hall
- No rehearsal or technical run before doors open
- Missing backup power or spare units
- Content not built for the actual screen or surface size
Get an accurate price
Share your event name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept and an itemised drone light shows quote, usually within 48 hours.
What we do: free 3D design with every confirmed fabrication order, fabrication in our own workshops, organiser drawings and approvals handled, and a single project manager from brief to dismantle. Priced mainly by drone count and show length; share your event date, city and audience size for a quote.
Whoever you end up using, ask for three things in writing: the itemisation, the exclusions, and how a change gets priced. Those three answers are what turn a number into a price you can plan around, and any vendor worth using will give them without being pressed.
Frequently asked questions
How much contingency should I hold back?+
Enough to absorb one change you have not thought of yet. The illustrative allocation on this page holds back ₹75,000 of ₹15,00,000, which is a planning habit rather than a published rule — set your own figure, but set it before briefing, because a contingency invented afterwards is just an overrun.
Is the cheapest quote ever the right one?+
Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.
How can I lower the cost without the stand looking cheap?+
Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.
What does a 54 sq.m stand cost?+
Using the published band, the structure alone is ₹4,86,000–₹9,72,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹9,74,000 before GST — about ₹18,037 per sq.m — for a mid-finish custom stand.
Do you charge separately for design?+
3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.
When is payment due?+
Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.
What is never included in a stall quote?+
Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,50,000 of ₹15,00,000 — small enough to forget and large enough to hurt.
Who pays the organiser for space and power?+
You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.
Does a bigger stand cost proportionally more?+
The build line scales with area at the published band — 75 sq.m of structure at ₹9,000 per sq.m is ₹6,75,000, and the same money buys 37.5 sq.m at ₹18,000. The lines that do not scale in a straight line are transport, crew and supervision, so ask your builder which of your lines move with area and which are closer to fixed.
Drone Light Shows near you
Our crews deliver drone light shows in every major Indian city.
