India's largest stall fabrication network · 119 cities · 1,461 venues
Flooring & Carpeting Cost in India: 2026 Price Guide

Cost Guides

Flooring & Carpeting Cost in India: 2026 Price Guide

A full cost breakdown for flooring & carpeting in India — worked examples, the lines exhibitors forget, the price of changing your mind, and how reuse lowers the cost per show.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

Per sq.m by finish. For flooring & carpeting, stall area in square metres and number of open sides, finish level (laminate, paint, veneer, acrylic, metal) and height, hanging structures and double-decker elements do most of the work in the arithmetic. Decide those before you brief anyone, insist on an itemised quote, and compare like with like: the cheapest total is usually the one with the most left out.

Key takeaways

  • Always compare itemised quotes, not lump sums — the cheapest total is usually the one with the most left out.
  • Four lines are missing from most cheap quotes: the return journey, the crew, the dismantle, and the tax.
  • The cheapest stand you will ever build is the second outing of one you already own.
  • Every budget overrun has a date on it, and the date is always after design sign-off.
  • Per sq.m by finish.
  • Before anything else, settle stall area in square metres and number of open sides and finish level (laminate, paint, veneer, acrylic, metal) — the rest of the quote follows from them.

Flooring & carpeting: the published ranges

Raised platforms that hide cables, with carpet, vinyl, wooden or glossy finishes.

Per sq.m by finish. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.

The published band for custom fabrication is ₹9,000–₹18,000 per sq.m for the build. Modular and octanorm system construction sits below that band because the frame is reused rather than cut fresh, and an upgraded shell scheme — the organiser's own panels wrapped in printed fabric, with a raised floor, spotlights and a branded counter — sits below that again. Those three options are not different qualities of the same thing; they are different trade-offs between cost, reuse and how much the stand can be made to look like only your brand.

One thing worth noticing about that band before we go further: ₹18,000 is exactly twice ₹9,000. A build budget therefore covers twice the area at the bottom of the band as at the top, and the single largest decision in an exhibition budget is which of those two stands you would rather have. There is no general answer. A product that has to be touched wants area; a brand that has to be believed wants finish.

Construction typeWhere it sits on costWhat you still own afterwardsTypical fit
Shell scheme upgradeLowestGraphics only9–18 sq.m, first-time or budget exhibitors
Octanorm / system buildLowFrame and graphics9–36 sq.m, exhibitors doing several shows a year
Modular with custom graphicsMediumFrame, graphics, furniture18–54 sq.m, repeat exhibitors wanting a branded look
Custom wooden build₹9,000–₹18,000/sq.mLimitedAny size where the stand must look bespoke
Double-deckerQuoted per projectStructure, with engineering72 sq.m and above, when meetings would eat display space

Only the custom band is a published per-sq.m rate. The others are positions relative to it, because what they cost depends on how much of the frame already exists.

What drives the cost

A quote is not a number, it is a set of decisions you have already made without realising it. These are the variables doing the work, and each one is negotiable before the brief goes out and expensive afterwards.

Area and open sides dominate everything else. A stand with three open sides needs three finished faces, three lighting runs and more staff than an inline stand of the same area, so it costs more per square metre even before any design decision is made.

Then there is the pair nobody prices at briefing stage: lead time and finish level. 3 weeks is the schedule for 18 sq.m — take that away and you have not saved anything, you have bought the same work on an overtime shift. Finish is the other one: specify veneer where laminate would read identically from the aisle and you have spent the lighting budget on something visitors cannot see.

  • Distance from the workshop to the venue and build-up hours
  • Stall area in square metres and number of open sides
  • Finish level (laminate, paint, veneer, acrylic, metal)
  • Height, hanging structures and double-decker elements
  • LED walls, lighting and raised flooring
  • How far the workshop is from the venue, and whether a lorry can reach the hall door
  • Anything the organiser has to sign off: height, rigging, a raised floor, a second storey
  • Whether furniture is hired for the week or fabricated to keep
  • Whether the build-up window runs in daytime hours or forces a night shift
A lump sum is not a price. It is a price with the questions removed.

The lines a quote has to name

A professional quote lists every element separately so you can compare vendors fairly and remove items you do not need. A lump sum hides which of these you are about to pay for twice — or not at all.

Ask specifically whether transport, installation, dismantle, electrical fittings and taxes are inside the figure. Those four lines are the ones most often excluded, and together they are not small.

There is a third group of lines, small in value and large in consequence: who certifies the materials, who prepares and submits the organiser drawings, and who answers the phone during build-up. Ask for those to be named rather than assumed, because on fabrication work they are the lines that decide whether the rest of the quote gets delivered.

  • Storage of reusable elements after the show, and for how long
  • Fire-retardant certification for the materials being used
  • Night-shift or overtime labour, if the build-up window forces it
  • Raised platform flooring
  • Carpet, vinyl, laminate finishes
  • Cable management
  • Edge lighting options
  • Pre-build or dry assembly at the workshop before dispatch
  • Dismantle and clearing the stand inside the organiser's window
  • Transport to the venue and the return leg, stated separately

Eighteen square metres, costed properly

Here is how a mid-size custom build actually breaks down. The structure line uses the bottom of the published band — ₹9,000 per sq.m across 18 sq.m — and everything below it is a separate scope that a lump-sum quote would bury.

₹3,80,000 across 18 sq.m is about ₹21,111 per sq.m all-in, and that all-in figure is the one to compare, because it is the only one both vendors have to answer for. The split is the interesting part: fabrication is 43% of the total and everything else is the other 57%, or ₹2,18,000.

Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 18 sq.m of structure is ₹3,24,000 rather than ₹1,62,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.

Worked example · Illustrative 18 sq.m custom build, costed line by line
Structure and joinery (18 sq.m × ₹9,000)₹1,62,000
Graphics — brand wall, tensioned fabric and vinyl₹56,000
Lighting — track, aimed spots and backlit panels₹34,000
Raised flooring and carpet₹26,000
Furniture — counters, seating, planters₹24,000
Transport, both ways₹34,000
Installation, crew and dismantle₹44,000
Indicative total, before GST₹3,80,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

What the same budget buys at different sizes

Because the top of the published band is twice the bottom, every build budget describes two possible stands: a larger one at a plain finish, or one of half the area at a premium one. The table below is that arithmetic at the sizes exhibitors actually book. The right-hand column is what the spread between the two ends of the band is actually spent on.

The arithmetic has a tidy consequence. ₹18,000 less ₹9,000 is ₹9,000, which is the lower figure, so the money that upgrades a stand from the bottom of the band to the top would instead have doubled its area. Whichever you pick, you are spending the same amount — which means the decision is about what the stand has to do, not about what it costs.

Choose by the job, not the taste. Anything involving queuing, demonstrating, handling or sitting down is an argument for area, because the premium finish on a stand nobody can enter is money spent on photographs. Anything involving persuasion rather than throughput is an argument for finish — and in that case a smaller stand, properly lit, beats a larger one that looks provisional.

Stall sizeBuild at ₹9,000/sq.mBuild at ₹18,000/sq.mWhat the difference buys
9 sq.m₹81,000₹1,62,000Better print, aimed light instead of clip lamps, and an edge finish that survives the week
12 sq.m₹1,08,000₹2,16,000A laminate that survives handling, a lighting track, and a counter that locks
36 sq.m₹3,24,000₹6,48,000Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner
54 sq.m₹4,86,000₹9,72,000Double-height brand elements, integrated AV and a storage wall that hides the cartons
100 sq.m₹9,00,000₹18,00,000All of the above, plus the engineering a raised or second-storey element needs

Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.

Why two quotes for one brief differ

The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.

Here is the gap itemised, on the same illustrative 18 sq.m stand. Six ordinary substitutions — none of them dishonest, all of them things a vendor might assume — take ₹3,80,000 down to ₹2,87,000. That is ₹93,000, or 24% of the total, without anybody quoting a different margin or a different standard of workmanship.

The remedy is unglamorous. Write the specification yourself — board, graphics medium, number of fixtures, flooring type, furniture list, crew and shift — and send the same page to everybody. The prices that come back will be close together, and you will be choosing a vendor rather than guessing at a scope.

LineThe two readings of your briefWhat to put in writing
TaxesOne total is before tax and the other after itGive me both the pre-tax and the post-tax figure
TransportOne leg, both legs, or quietly left outIs the return journey inside this figure?
InstallationA day crew against a night-shift crew, with or without supervisionHow many crew, on which shift, and who supervises them?
FurnitureHired against fabricated, and a four-piece package against an eight-piece oneList the pieces, and say which are hired and which are built
GraphicsTensioned fabric on a frame against printed flex taped to a panelWhat is it printed on, and how is it fixed to the wall?
RiskOne vendor has priced the unknowns; the other will raise them later as variationsWhat happens to this price if the drawing changes?
ElectricalThe organiser's power charge, the stand's own wiring, or neitherWho pays the organiser, and who wires the stand?
Who builds itOne quote comes from the workshop; the other from somebody who will find oneWhose workshop is it, and may we see a build in progress?

None of these rows implies bad faith. They are all consequences of a brief that left a decision open, which is why the brief is the cheapest place to fix them.

Worked example · The same 18 sq.m brief, quoted two ways
Lighter board in the structure, with an exposed edge instead of a finished one₹24,000
Printed flex taped to panels instead of tensioned fabric on a frame₹16,000
Six aimed spots instead of fourteen, and no backlit panel₹11,000
Carpet laid straight on the hall floor instead of a raised platform with cable management₹13,000
A four-piece hired furniture package instead of eight pieces₹8,000
Installation and dismantle left as "to be advised"₹21,000
Total difference between the two quotes₹93,000

Illustrative, built by making six substitutions to the 18 sq.m example above. The higher quote is ₹3,80,000 and the lower is ₹2,87,000; the difference is ₹93,000, 24% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

The false economies, and the real ones

There are two kinds of saving in a stall quote. One kind removes something nobody was going to look at. The other removes something that then has to be dealt with on site, at site prices, by people with the wrong tools. The lines look identical on paper.

The test is simple: ask what happens if this line is not there. If the answer is "nothing, nobody would notice", delete it with confidence. If the answer is "we deal with it on site", you have not removed a cost, you have moved it to the most expensive place and time available, and attached a risk to it.

Both halves of the distinction follow. First the lines that genuinely are optional — and these are usually the bigger numbers, which is the happy part of this section. Then, in the table, the ones that only look optional, each with its consequence spelled out.

  • A second set of graphics for a message you have not tested on anybody yet
  • Giveaways in quantity, which measure footfall rather than interest
  • Fabricated furniture, where hired furniture would have been collected afterwards anyway
  • A full-height closed meeting room on a small stand, where a screened corner does the same work
  • A printed floor, when plain carpet in the brand colour does the same job
  • Veneer or PU paint where a good laminate reads identically from the aisle
Line itemWhy it reads as paddingThe consequence
Dismantle and clearanceThe show is over by thenThe organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost
Storage between showsWe will decide after this one"After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable
The cable and socket count on the drawingThat is site detailSite detail becomes a visible extension lead across the floor of a stand you paid to look expensive
Packing crates and transport coverIt travelled fine last timeOnce is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day
One spare panel for the hero wallIt will be fineA scuffed hero panel is the one thing every photograph of the stand will show
Supervision during build-upThe crew knows the drawingWhen a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window

The common thread is that each one is cheap in a workshop and expensive at a venue. Timing, not quality, is what makes them worth keeping.

A saving that has to be dealt with on site is not a saving. It is a deferral with a surcharge.

What changing your mind costs, stage by stage

The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.

The practical consequence is to front-load the arguing. With 3 weeks on the schedule for 18 sq.m, every disagreement settled before sign-off is free and every one settled afterwards has a price. Add 2 weeks for a premium finish or 2 for a double-decker element, and the calendar is still unforgiving once production has started.

Two habits keep this under control. Name one approver on your side, so that a change is a decision rather than a negotiation. And ask, before the first payment, how variations are priced and approved — in writing, with a figure confirmed before work starts, rather than appearing on a final invoice as a surprise.

StageThe price of changing your mindWhat has already happened
While the concept is being designedTime, and nothing elseNothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it
After materials are orderedThe material, plus its replacementBoard, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts
After graphics go to printA full reprint of the affected panelLarge-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment
After dispatchFreight both ways, and a hole in the build scheduleThe panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you
Once the show has openedUsually nothing can be done at allThe hall is open and the stand is public. The only honest response is to write it down for the next edition

The pattern is the whole lesson: the cost of a change is set by what has already been bought, drawn or built, not by how large the change is.

Exhibiting soon? Let's build your stall.

Or use the full form

If the total is fixed, start there

Most exhibitors do not start with a design, they start with a number. Working backwards from that number is a more reliable method than briefing a design and discovering afterwards what it costs — and it has one step that nearly everybody misses, which is subtracting the costs that no stand builder will ever quote you.

After the list of costs that never reach a stall quote comes a worked allocation of ₹6,00,000, offered as an illustration rather than as a standard, because no standard exists that we could honestly cite. Read it from the bottom: ₹30,000 unallocated, ₹60,000 of costs no stand quote will carry, and ₹5,40,000 — 90% — left for the stand itself.

That leaves ₹2,70,000 for the build itself in this illustration, which at ₹9,000 per sq.m is 30 sq.m of structure, or 15 sq.m at ₹18,000. Compare that with the area you have actually booked and you will know immediately whether your budget and your floor plan are in agreement — and if they are not, you have found it out at the right time, which is before the design.

  • Product freight — the goods on display travel separately from the stand that holds them
  • Printed collateral, samples, and anything you intend to hand over
  • Travel, hotels and local transport for everyone who will stand on the stand
  • Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
  • Space rental, invoiced to you by the organiser rather than by your stand builder
  • Promoters, hostesses or interpreters, if your visitors need them
  • The organiser's power connection, charged against the load you declare
  • The cost of your own team being away from their desks for the build-up and the show
AllocationShareIllustrative amount
Stand build — structure, joinery and finish45%₹2,70,000
Graphics, lighting and AV20%₹1,20,000
Flooring and furniture10%₹60,000
Transport, installation and dismantle15%₹90,000
Your own show costs — travel, staffing, collateral, hospitality5%₹30,000
Contingency, held back rather than allocated at briefing5%₹30,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹6,00,000. The first four rows, ₹5,40,000, are what a stand builder quotes against. GST sits on top.

What the area actually gives you

Stall area decides more than price — it decides what the stand can physically do. The split below is the same arithmetic as our stall planner: storage takes 10% of the area up to 18 sq.m and 15% above it, a meeting corner takes 5% unless you are actually hosting meetings, and display takes the remainder.

The visitors column is the one most exhibitors never calculate. Divide display area by 2.5 and you get roughly how many visitors can stand in the stand at once — which tells you whether your staffing plan and your footfall expectation are compatible.

The build-weeks column is a budget column in disguise. Our schedule is 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for a premium finish and +2 for a double-decker. Compressing it does not reduce the work; it relocates the work to night shifts and rush rates.

Stall sizeDisplay areaStorageStaff neededVisitors at onceBuild weeks
9 sq.m7.6 sq.m0.9 sq.m233
18 sq.m15.3 sq.m1.8 sq.m263
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235
100 sq.m80 sq.m15 sq.m12325

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Paying for it: stages and deliverables

We will not quote you a standard payment split, because there is not one to quote. What matters more than the percentages is whether each stage is attached to something you can verify. Terms are agreed in the quote; this section is about what to ask for inside them.

The principle is that a payment stage should correspond to a deliverable rather than to a date. Approved drawings exist or they do not. Materials are on the shop floor or they are not. A pre-build can be walked around or it cannot. The stand is standing at the venue or it is not. Each of those is checkable; "end of week two" is not.

One more thing belongs in this conversation, because it is where disputes actually start: the variation process. Agree, before the first payment, who on your side approves a change, in what format, and whether its price is confirmed before the work begins. Unpriced variations are where almost every uncomfortable conversation about an exhibition invoice begins, and they are the one budget risk that is entirely administrative to remove.

  1. 01

    Confirm what the first payment actually unlocks

    Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.

  2. 02

    Name one approver on your side

    One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.

  3. 03

    Ask what happens if the show moves

    Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.

  4. 04

    Keep something payable after handover

    Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.

  5. 05

    Get the tax position in writing

    Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.

  6. 06

    Write the variation process down before there is a variation

    Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.

Agree how changes are priced before there is a change to price.

Reuse arithmetic: the second show is the cheap one

The arithmetic changes completely once you exhibit twice. Costing a stand against one show, when it will stand at three, overstates it by a wide margin; but it only overstates it if the stand was built to be reused, which is a decision made at design stage and cannot be made afterwards.

The second outing is costed in full in the example on this page. The structure, having been stored, does not reappear: what remains is a graphics reprint for the new message, refurbishment of what got marked, storage between the two shows, and the same transport and installation as before. That comes to ₹1,36,000 against the first show's ₹3,80,000 — 36% of it — because ₹2,44,000 of the first build is not bought a second time.

The table follows it across three shows, and the average per show falls from ₹3,80,000 to ₹2,58,000 and then to about ₹2,17,333 — a fall of 43% against the first outing, with nothing negotiated and no corner cut. That is the strongest cost lever in exhibiting, and it is available only to exhibitors who asked for it before the first stand was built.

Three conditions have to hold, and they are all specification rather than luck. The structure has to be modular, dismantled in panels rather than broken down. The graphics have to be a separate layer — fabric on a frame, reprinted rather than rebuilt. And somewhere has to store it, which is a real cost and appears as a line in the example rather than being quietly ignored.

EditionCost of this oneTotal so farAverage per show
Show 1 — the first build₹3,80,000₹3,80,000₹3,80,000
Show 2 — same structure, new graphics₹1,36,000₹5,16,000₹2,58,000
Show 3 — same structure, new graphics₹1,36,000₹6,52,000₹2,17,333

Illustrative, built from the two worked examples on this page: ₹3,80,000 for the first build and ₹1,36,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · What the second show carries, and what it does not
Graphics reprinted for the new show and the new message₹28,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹18,000
Storage of the structure between the two shows₹12,000
Transport, both ways₹34,000
Installation, crew and dismantle₹44,000
Indicative second-show total, before GST₹1,36,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹3,80,000, this is 36%, so ₹2,44,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

How to reduce cost without looking cheap

Spend on the elements visitors notice in the first three seconds from the aisle — the brand wall, the lighting and the hero product position — and save on hidden structure, storage and anything above the sightline.

Reuse modular frames, graphics systems and furniture across shows, choose fabric graphics over rigid printed panels where the design allows, and bundle design, build and AV with one partner so you are not paying three margins and reconciling three schedules.

Cut structure before light. Visitors cannot admire quality they are standing in the shadow of, and lighting costs a fraction of the thing it makes visible.

One qualification on the whole list: timing. Each of these is a genuine saving if it is decided before the brief is frozen and an expensive change if it is decided afterwards. Hiring furniture is cheaper than building it; deciding to hire it after it has been built is not.

  • Choose a laminate that reads like veneer from a metre away, and spend the difference on light
  • Reuse a modular structure across several shows — the second outing costs a fraction of the first
  • Hire the AV for the week instead of buying a screen you will then have to store
  • Keep the footprint simple — every curve, angle and radius is another line on the cutting list
  • One strong message instead of five competing ones, which is cheaper and also works better
  • Print one hero graphic properly and keep everything around it plain
  • Keep graphics on fabric, so the next edition is a reprint instead of a rebuild

The three expensive failures

Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: sub-contracted builds with no quality control. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.

The second failure is unwritten scope. A quote that does not name the board, the fixture count and the flooring type is a quote for an unspecified stand, and two such quotes cannot be compared with each other at all.

The last of the three is subtler. The quote was right; the job changed. Half a dozen small additions after sign-off, none of them priced at the time, and the final figure is not the one anybody approved — which is an argument for agreeing the variation process at the same moment as the price.

  • Hidden extras for electrical, carpet or dismantling
  • Sub-contracted builds with no quality control
  • Non fire-retardant materials rejected at the venue
  • Late arrival on site that eats into build-up time

Getting a flooring & carpeting quote you can rely on

Share your event name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept and an itemised flooring & carpeting quote, usually within 48 hours.

Design is free with every confirmed fabrication order; the build happens in our own workshops; the organiser drawings and approvals are ours to handle; and one project manager stays with the job from brief through dismantle. Per sq.m by finish.

Before you sign anything, get three answers in writing: what is itemised, what is excluded, and what happens to the price when the drawing changes. They take one email to request, and they are the difference between a quote and a guess.

Frequently asked questions

When is payment due?+

Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.

Do you charge separately for design?+

3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.

How much does flooring & carpeting cost in India?+

Per sq.m by finish. For a custom build, work from ₹9,000–₹18,000 per sq.m for the structure, and treat graphics, lighting, flooring, furniture, AV, transport, installation and taxes as separate lines rather than as details inside that figure.

How can I lower the cost without the stand looking cheap?+

Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.

Is GST included in flooring & carpeting quotes?+

A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

What does a 18 sq.m stand cost?+

Using the published band, the structure alone is ₹1,62,000–₹3,24,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹3,80,000 before GST — about ₹21,111 per sq.m — for a mid-finish custom stand.

Is the cheapest quote ever the right one?+

Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 18 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹93,000, or 24% of ₹3,80,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

Flooring & Carpeting near you

Our crews deliver flooring & carpeting in every major Indian city.

Powered byIRPR