By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read
Short answer
Quoted per activation. What moves the number for mall activations is total area and number of co-exhibitors, scope (design, build, AV, furniture, logistics, manpower, hospitality) and number of cities or shows in the programme — and what makes two numbers incomparable is scope that nobody wrote down. Send the show, the city, the dates, the area, the open sides and two reference images, and ask for the quote itemised line by line.
Key takeaways
- Reuse beats negotiation. A second outing with the same structure is 32% of the first show's figure, with nothing haggled.
- Changing your mind is free while the concept is being designed and expensive at every stage after it.
- Quoted per activation.
- Before anything else, settle total area and number of co-exhibitors and scope (design, build, AV, furniture, logistics, manpower, hospitality) — the rest of the quote follows from them.
- Always compare itemised quotes, not lump sums — the cheapest total is usually the one with the most left out.
- Only 48% of this page's illustrative total is fabrication. The other ₹3,49,000 is everything a lump sum hides.
Mall activations: the published ranges
Mall atrium activations, pop-ups and sampling setups with mall permission handling.
Quoted per activation. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.
Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.
One thing worth noticing about that band before we go further: ₹18,000 is exactly twice ₹9,000. A build budget therefore covers twice the area at the bottom of the band as at the top, and the single largest decision in an exhibition budget is which of those two stands you would rather have. There is no general answer. A product that has to be touched wants area; a brand that has to be believed wants finish.
| Construction type | Where it sits on cost | What you still own afterwards | Typical fit |
|---|---|---|---|
| Shell scheme upgrade | Lowest | Graphics only | 9–18 sq.m, first-time or budget exhibitors |
| Octanorm / system build | Low | Frame and graphics | 9–36 sq.m, exhibitors doing several shows a year |
| Modular with custom graphics | Medium | Frame, graphics, furniture | 18–54 sq.m, repeat exhibitors wanting a branded look |
| Custom wooden build | ₹9,000–₹18,000/sq.m | Limited | Any size where the stand must look bespoke |
| Double-decker | Quoted per project | Structure, with engineering | 72 sq.m and above, when meetings would eat display space |
Only the custom band is a published per-sq.m rate. The others are positions relative to it, because what they cost depends on how much of the frame already exists.
The variables doing the work
Price every mall activations enquiry against the same short list and vendor comparison stops being guesswork. Each line below is something you can change; the total is only what they add up to.
Open sides are the variable exhibitors forget to price. Each additional open face adds finished surface, another lighting run and another person to staff it — which is why two stands of identical area can quote very differently.
Then there is the pair nobody prices at briefing stage: lead time and finish level. 4 weeks is the schedule for 36 sq.m — take that away and you have not saved anything, you have bought the same work on an overtime shift. Finish is the other one: specify veneer where laminate would read identically from the aisle and you have spent the lighting budget on something visitors cannot see.
- Scope (design, build, AV, furniture, logistics, manpower, hospitality)
- Number of cities or shows in the programme
- Approval layers with organisers, embassies or departments
- Total area and number of co-exhibitors
- The finish on surfaces visitors can touch, as against the ones they cannot
- Anything the organiser has to sign off: height, rigging, a raised floor, a second storey
- The number of approval rounds before the drawing is frozen
- The number of open sides, which decides how many faces have to be finished
The cheapest quote is usually the one with the most left out.
What a mall activations quote should itemise
Insist on the itemisation before you discuss the total. Every line is a decision somebody made on your behalf, and some of those decisions are ones you would have made differently if you had been shown them.
Four lines go missing more often than the rest: the return journey, the on-site crew, the dismantle, and the tax. On this page's illustrative 36 sq.m figures, transport and installation alone are ₹1,17,000 — which is what a quote without them is quietly saving.
For turnkey participations there are a few lines beyond the obvious ones that belong on the page: the certification the venue will ask for, the drawings the organiser will ask for, and the person whose phone you will be ringing at seven in the morning on build-up day. None of those are large figures. All of them are expensive to arrange late.
- Installation, the on-site crew, and who supervises them
- A named project manager, with a phone number, for the build-up days
- Transport to the venue and the return leg, stated separately
- Atrium installations
- Pop-up stores
- Mall permissions
- Promoter staffing support
- GST, shown as a figure rather than as a footnote
- Dismantle and clearing the stand inside the organiser's window
- Fire-retardant certification for the materials being used
A worked example: 36 sq.m custom stand
An example is worth more than a range. This one is 36 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.
The total is ₹6,73,000 — about ₹18,694 per sq.m once everything is counted. Most exhibitors are surprised by the shape rather than the size of it: the joinery everybody argues about is 48% of the figure, and ₹3,49,000 goes on graphics, light, floor, furniture, freight and crew.
Before you use that number, apply two adjustments. The structure is priced at the band's lower end, so a heavier finish specification pushes it toward ₹6,48,000 for the same 36 sq.m. And the total is before GST throughout. With both adjustments made, it is a sound planning figure for a mid-finish custom stand, and nothing more than that.
| Structure and joinery (36 sq.m × ₹9,000) | ₹3,24,000 |
|---|---|
| Raised flooring and carpet | ₹43,000 |
| Furniture — counters, seating, planters | ₹38,000 |
| Graphics — brand wall, tensioned fabric and vinyl | ₹97,000 |
| Lighting — track, aimed spots and backlit panels | ₹54,000 |
| Transport, both ways | ₹52,000 |
| Installation, crew and dismantle | ₹65,000 |
| Indicative total, before GST | ₹6,73,000 |
Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.
What the same budget buys at different sizes
This is the comparison most briefs skip. At every size, the band gives you a lower figure and an upper one, and the gap between them is not padding: it is finish, light, floor and detail. The last column names what it buys, so you can decide whether you want it more than you want the extra square metres.
Hold the two middle columns next to each other and the trade is exact: the difference between them, ₹9,000 per sq.m, is the same as the lower rate itself. Upgrade the finish or double the footprint — at the published band, those two cost the same. Few budget decisions are this clean, and almost nobody uses it.
The honest rule is that area serves activity and finish serves belief. Demonstrations, queues, meetings and products that must be touched all need floor, and no amount of veneer compensates for a stand people cannot get into. A launch, a new category entry, or a brand that has to look established needs finish, and does better with a smaller, denser, well-lit stand than with a larger plain one.
| Stall size | Lower end of the band | Upper end of the band | The spread pays for |
|---|---|---|---|
| 9 sq.m | ₹81,000 | ₹1,62,000 | Better print, aimed light instead of clip lamps, and an edge finish that survives the week |
| 12 sq.m | ₹1,08,000 | ₹2,16,000 | A laminate that survives handling, a lighting track, and a counter that locks |
| 18 sq.m | ₹1,62,000 | ₹3,24,000 | A raised floor, aimed lighting and furniture you do not have to apologise for |
| 36 sq.m | ₹3,24,000 | ₹6,48,000 | Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner |
| 54 sq.m | ₹4,86,000 | ₹9,72,000 | Double-height brand elements, integrated AV and a storage wall that hides the cartons |
Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.
Reading the gap between two quotes
When two prices for the same stand are far apart, the instinct is to suspect the higher one. Usually both are honest and the brief was not specific: every unspecified detail is a decision the vendor makes for you, and the cheaper quote is simply the one that made the cheaper decisions.
The arithmetic below is the whole phenomenon in one table. Take the 36 sq.m example and make six substitutions a vendor could defend in a meeting, and ₹6,73,000 becomes ₹5,23,000. The 22% difference — ₹1,50,000 — is entirely scope, and none of it is visible in a lump-sum comparison.
So the fix sits with the buyer. Specify the things above in writing before you circulate the enquiry, and the spread between quotes collapses to something like the real difference between the vendors. Skip it, and you are not comparing prices at all — you are comparing assumptions.
| Line | The two readings of your brief | What to put in writing |
|---|---|---|
| Taxes | One total is before tax and the other after it | Give me both the pre-tax and the post-tax figure |
| Lighting | Fourteen aimed fixtures against six, or against none at all | How many fixtures, of what type, aimed at what? |
| Who builds it | One quote comes from the workshop; the other from somebody who will find one | Whose workshop is it, and may we see a build in progress? |
| Furniture | Hired against fabricated, and a four-piece package against an eight-piece one | List the pieces, and say which are hired and which are built |
| Risk | One vendor has priced the unknowns; the other will raise them later as variations | What happens to this price if the drawing changes? |
| Electrical | The organiser's power charge, the stand's own wiring, or neither | Who pays the organiser, and who wires the stand? |
| Installation | A day crew against a night-shift crew, with or without supervision | How many crew, on which shift, and who supervises them? |
| Transport | One leg, both legs, or quietly left out | Is the return journey inside this figure? |
None of these rows implies bad faith. They are all consequences of a brief that left a decision open, which is why the brief is the cheapest place to fix them.
| A four-piece hired furniture package instead of eight pieces | ₹12,000 |
|---|---|
| Installation and dismantle left as "to be advised" | ₹31,000 |
| Lighter board in the structure, with an exposed edge instead of a finished one | ₹42,000 |
| Printed flex taped to panels instead of tensioned fabric on a frame | ₹26,000 |
| Six aimed spots instead of fourteen, and no backlit panel | ₹18,000 |
| Carpet laid straight on the hall floor instead of a raised platform with cable management | ₹21,000 |
| Total difference between the two quotes | ₹1,50,000 |
Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.
What is optional, and what only looks optional
Every quote contains lines you can delete and lines that merely look deletable. Telling them apart is the single most useful skill in exhibition procurement, because the second kind does not announce itself — it simply reappears later, larger, as a problem rather than as a line item.
One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.
Below: the real options as a list, then the false economies as a table. Read the list first if you are over budget, because the savings in it are larger and none of them will be visible from the aisle.
- Working shutters and locks on storage that nobody will see
- Giveaways in quantity, which measure footfall rather than interest
- Veneer or PU paint where a good laminate reads identically from the aisle
- A second set of graphics for a message you have not tested on anybody yet
- A ceiling or hanging element, unless the stand has to be found from across the hall
- A full-height closed meeting room on a small stand, where a screened corner does the same work
| Line | Why it looks optional | What actually happens if you cut it |
|---|---|---|
| Storage between shows | We will decide after this one | "After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable |
| Dismantle and clearance | The show is over by then | The organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards |
| Supervision during build-up | The crew knows the drawing | When a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window |
| A graphics proofing round | The artwork is final | Large-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall |
| One spare panel for the hero wall | It will be fine | A scuffed hero panel is the one thing every photograph of the stand will show |
| A single project manager | Each vendor manages themselves | Then every gap between vendors is yours to discover, usually at eight o'clock on the first morning |
| Packing crates and transport cover | It travelled fine last time | Once is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day |
None of these are large figures in a quote. All of them are large figures once the hall is open, which is the entire point of the table.
Delete what nobody will look at. Keep what everybody will walk on, touch, or need power from.
What changing your mind costs, stage by stage
The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.
The practical consequence is to front-load the arguing. With 4 weeks on the schedule for 36 sq.m, every disagreement settled before sign-off is free and every one settled afterwards has a price. Add 2 weeks for a premium finish or 2 for a double-decker element, and the calendar is still unforgiving once production has started.
Two habits keep this under control. Name one approver on your side, so that a change is a decision rather than a negotiation. And ask, before the first payment, how variations are priced and approved — in writing, with a figure confirmed before work starts, rather than appearing on a final invoice as a surprise.
| Point in the programme | Cost of a change here | The reason |
|---|---|---|
| After design sign-off, before production | A redraw and a requote | Drawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you |
| In production | The labour already spent, plus the labour to redo it | A fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved |
| After graphics go to print | A full reprint of the affected panel | Large-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment |
| After dispatch | Freight both ways, and a hole in the build schedule | The panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience |
| During build-up | Night-shift labour, and whatever can be improvised | There is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you |
| Once the show has opened | Usually nothing can be done at all | The hall is open and the stand is public. The only honest response is to write it down for the next edition |
Read the first row twice. It is the only stage at which a change is free, and it is the stage exhibitors rush through fastest.
Exhibiting soon? Let's build your stall.
If the total is fixed, start there
Most exhibitors do not start with a design, they start with a number. Working backwards from that number is a more reliable method than briefing a design and discovering afterwards what it costs — and it has one step that nearly everybody misses, which is subtracting the costs that no stand builder will ever quote you.
The allocation below is illustrative — a planning habit rather than a rule, and we have no source for a standard split. First, though, the list below: the exhibiting costs that never reach a stall quote at all. The allocation table after it is shown against ₹10,00,000 so the arithmetic is visible. Its important feature is the bottom two rows: ₹1,00,000 of ₹10,00,000 is money a stand builder never sees, and ₹50,000 of it is deliberately not allocated at briefing stage.
That leaves ₹4,50,000 for the build itself in this illustration, which at ₹9,000 per sq.m is 50 sq.m of structure, or 25 sq.m at ₹18,000. Compare that with the area you have actually booked and you will know immediately whether your budget and your floor plan are in agreement — and if they are not, you have found it out at the right time, which is before the design.
- Lead-capture devices, the data connection, and somewhere to charge them
- The organiser's power connection, charged against the load you declare
- Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
- Printed collateral, samples, and anything you intend to hand over
- Product freight — the goods on display travel separately from the stand that holds them
- Storage of reusable elements between this edition and the next
- Photography and video of the finished stand, which is the asset you use all year
- Space rental, invoiced to you by the organiser rather than by your stand builder
| Allocation | Share | Illustrative amount |
|---|---|---|
| Stand build — structure, joinery and finish | 45% | ₹4,50,000 |
| Graphics, lighting and AV | 20% | ₹2,00,000 |
| Flooring and furniture | 10% | ₹1,00,000 |
| Transport, installation and dismantle | 15% | ₹1,50,000 |
| Your own show costs — travel, staffing, collateral, hospitality | 5% | ₹50,000 |
| Contingency, held back rather than allocated at briefing | 5% | ₹50,000 |
Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.
What the area actually gives you
Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.
Read the visitor column as a constraint rather than as information. It is display area divided by 2.5, and if your footfall expectation implies more people in the stand at once than that, the thing standing in the way is the floor plan, not the campaign.
The build-weeks column is a budget column in disguise. Our schedule is 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for a premium finish and +2 for a double-decker. Compressing it does not reduce the work; it relocates the work to night shifts and rush rates.
| Stall size | Display area | Storage | Staff needed | Visitors at once | Build weeks |
|---|---|---|---|---|---|
| 9 sq.m | 7.6 sq.m | 0.9 sq.m | 2 | 3 | 3 |
| 12 sq.m | 10.2 sq.m | 1.2 sq.m | 2 | 4 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.
Payment, milestones and what each one should mean
Payment terms vary by vendor, by scope and by how long the two of you have worked together, and we are not going to invent a standard split — there is no honest source for one. What can be said without inventing anything is what each stage ought to correspond to, and that is the part worth negotiating.
The principle is that a payment stage should correspond to a deliverable rather than to a date. Approved drawings exist or they do not. Materials are on the shop floor or they are not. A pre-build can be walked around or it cannot. The stand is standing at the venue or it is not. Each of those is checkable; "end of week two" is not.
The item to settle alongside the schedule is how changes get priced. Who approves them on your side, in what format, and is the figure confirmed before work starts? Nearly every uncomfortable conversation about an exhibition invoice began as a change that nobody priced at the moment it was agreed.
01
Name one approver on your side
One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.
02
Keep the organiser's bills on a separate line
Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.
03
Confirm what the first payment actually unlocks
Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.
04
Get the tax position in writing
Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.
05
Keep something payable after handover
Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.
06
Write the variation process down before there is a variation
Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.
A milestone with no deliverable attached is a date, and a date is not a milestone.
How the cost per show falls across a year
Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.
Costed properly — see the example — the second show has no structure line, a graphics reprint, a refurbishment allowance, storage between editions, and transport and installation as before. The total is ₹2,15,000 — 32% of the ₹6,73,000 first show — because ₹4,58,000 of that first figure was a one-time purchase.
Extended to a third show in the table, the average per show becomes about ₹3,67,667, against ₹6,73,000 for the first outing alone: a 45% fall. No negotiation produces that. It comes entirely from a design decision taken before the first panel was cut, which is why it has to be asked for at briefing stage.
It depends on three things being true. A modular structure that comes apart without damage; graphics as a removable layer rather than as part of the wall; and storage, which costs money and is therefore a line in the example rather than an assumption. Miss any one and the second show is close to the price of the first.
| Edition | Cost of this one | Total so far | Average per show |
|---|---|---|---|
| Show 1 — the first build | ₹6,73,000 | ₹6,73,000 | ₹6,73,000 |
| Show 2 — same structure, new graphics | ₹2,15,000 | ₹8,88,000 | ₹4,44,000 |
| Show 3 — same structure, new graphics | ₹2,15,000 | ₹11,03,000 | ₹3,67,667 |
Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.
| Graphics reprinted for the new show and the new message | ₹48,000 |
|---|---|
| Refurbishment — replaced panels, touch-up paint, relaminating what is marked | ₹32,000 |
| Storage of the structure between the two shows | ₹18,000 |
| Transport, both ways | ₹52,000 |
| Installation, crew and dismantle | ₹65,000 |
| Indicative second-show total, before GST | ₹2,15,000 |
Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.
How to reduce cost without looking cheap
Put the money where a visitor's eye lands before they decide whether to walk in: the main graphic, the lighting on it, and whatever you most want them to look at. Everything behind that can be built to a budget without anybody noticing.
The structural saving is reuse: a modular frame with reprintable graphics turns the second show into a fraction of the first. Beyond that, hire the furniture, print on fabric rather than rigid board, and buy the whole scope from one place instead of paying three separate margins.
Cut structure before light. Visitors cannot admire quality they are standing in the shadow of, and lighting costs a fraction of the thing it makes visible.
The savings that work are the ones decided early. Booking inside the lead time, redesigning after sign-off and adding scope in production are not savings at all — they are the three most reliable ways to spend more than you planned. Every item in the list below has to be chosen before the brief is frozen to be worth anything.
- Hire furniture and planters rather than fabricating them for a week
- Book early: rush charges and night-shift labour are avoidable rather than inevitable
- Reuse a modular structure across several shows — the second outing costs a fraction of the first
- One strong message instead of five competing ones, which is cheaper and also works better
- Hire the AV for the week instead of buying a screen you will then have to store
- Keep graphics on fabric, so the next edition is a reprint instead of a rebuild
- Build the storage wall out of the back of the display wall, so one structure does two jobs
The three expensive failures
The three failures that cost exhibitors real money on mall activations are all avoidable at quoting stage. Too many vendors with no single point of accountability. That is settled at quoting stage rather than at the venue, and the fix is to ask what the quote actually specifies, and who will physically do the work, before you compare totals.
The second failure is unwritten scope. A quote that does not name the board, the fixture count and the flooring type is a quote for an unspecified stand, and two such quotes cannot be compared with each other at all.
The third failure is a budget that was correct when it was written. Scope added in ones and twos after sign-off does not announce itself as an overrun until the final invoice, which is exactly why the change procedure matters as much as the price.
- Budget overruns from scope that was never itemised
- Delayed approvals that compress build-up time
- Too many vendors with no single point of accountability
- Inconsistent branding across co-exhibitor booths
Getting a mall activations quote you can rely on
Share your event name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept and an itemised mall activations quote, usually within 48 hours.
We design free with every confirmed fabrication order, fabricate in our own workshops, prepare the organiser drawings and approvals, and put one project manager on the job from brief to dismantle. Quoted per activation.
One closing piece of advice that applies to every vendor including us. Ask for the itemised scope, ask explicitly what is excluded, and ask how variations are priced. A supplier who answers all three without hesitation is telling you something useful about how the build will go.
Frequently asked questions
Is the cheapest quote ever the right one?+
Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.
Does a bigger stand cost proportionally more?+
The build line scales with area at the published band — 50 sq.m of structure at ₹9,000 per sq.m is ₹4,50,000, and the same money buys 25 sq.m at ₹18,000. The lines that do not scale in a straight line are transport, crew and supervision, so ask your builder which of your lines move with area and which are closer to fixed.
Why do two quotes for the same brief differ so much?+
Almost always because they describe two different stands. On the illustrative 36 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹1,50,000, or 22% of ₹6,73,000. Ask both vendors to itemise against the same written scope and the gap explains itself.
When is payment due?+
Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.
Is GST included in mall activations quotes?+
A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.
Do you charge separately for design?+
3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.
What does a 36 sq.m stand cost?+
Using the published band, the structure alone is ₹3,24,000–₹6,48,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹6,73,000 before GST — about ₹18,694 per sq.m — for a mid-finish custom stand.
What is never included in a stall quote?+
Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,00,000 of ₹10,00,000 — small enough to forget and large enough to hurt.
How much does mall activations cost in India?+
Quoted per activation. For a custom build, work from ₹9,000–₹18,000 per sq.m for the structure, and treat graphics, lighting, flooring, furniture, AV, transport, installation and taxes as separate lines rather than as details inside that figure.