By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read
Short answer
Quoted per launch. What moves the number for product launch sets is show duration and number of event days, equipment size and specification (screen size, projector brightness or drone count) and content creation and programming time — and what makes two numbers incomparable is scope that nobody wrote down. Send the show, the city, the dates, the area, the open sides and two reference images, and ask for the quote itemised line by line.
Key takeaways
- Quoted per launch.
- Two things dominate the quote: show duration and number of event days and equipment size and specification (screen size, projector brightness or drone count).
- A lump sum cannot be compared with anything. Two itemised quotes against one written scope can.
- Transport, installation, dismantle and taxes are separate lines. Confirm they are in the figure you are comparing.
- Booking early and reusing elements lowers the cost per event more than negotiation does.
- Spend longer at concept stage than feels comfortable. It is the only point at which a change costs nothing but time.
What product launch sets costs in India
Dramatic product reveals with kinetic stages, LED walls and lighting for press and dealer launches.
Quoted per launch. Where the show is matters less than most exhibitors expect. The fabrication cost barely moves between cities; what moves is transport distance from the workshop, how scarce crews are during a busy show week in that city, and whether the organiser's build-up window is tight enough to force a night shift.
Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.
One thing worth noticing about that band before we go further: ₹18,000 is exactly twice ₹9,000. A build budget therefore covers twice the area at the bottom of the band as at the top, and the single largest decision in an exhibition budget is which of those two stands you would rather have. There is no general answer. A product that has to be touched wants area; a brand that has to be believed wants finish.
| Construction type | Relative cost | Reuse | Best for |
|---|---|---|---|
| Shell scheme upgrade | Lowest | Graphics only | 9–18 sq.m, first-time or budget exhibitors |
| Octanorm / system build | Low | Frame and graphics | 9–36 sq.m, exhibitors doing several shows a year |
| Modular with custom graphics | Medium | Frame, graphics, furniture | 18–54 sq.m, repeat exhibitors wanting a branded look |
| Custom wooden build | ₹9,000–₹18,000/sq.m | Limited | Any size where the stand must look bespoke |
| Double-decker | Quoted per project | Structure, with engineering | 72 sq.m and above, when meetings would eat display space |
Relative cost compares the build only. AV, furniture, flooring, transport, installation and taxes are quoted on their own lines in every case.
What drives the cost
Price every product launch sets enquiry against the same short list and vendor comparison stops being guesswork. Each line below is something you can change; the total is only what they add up to.
Two numbers set the budget before anyone opens a sketchbook: how many square metres you booked and how many of its sides are open. An island stand is not a more expensive taste, it is four finished faces instead of one.
After area, the two variables with the most money in them are time and finish. Time, because a job booked inside the lead time is a job partly done at overtime rates: our own schedule needs 4 weeks for 36 sq.m, and compressing it does not remove work, it only moves it to a more expensive shift. Finish, because the difference between a good laminate and a veneer is invisible from the aisle and perfectly visible on the invoice.
- Rigging, power backup and technician crew size
- Permissions, venue rules and rehearsal time
- Show duration and number of event days
- Equipment size and specification (screen size, projector brightness or drone count)
- Content creation and programming time
- Whether furniture is hired for the week or fabricated to keep
- The number of open sides, which decides how many faces have to be finished
- Whether the build-up window runs in daytime hours or forces a night shift
- The finish on surfaces visitors can touch, as against the ones they cannot
You cannot compare two quotes until both describe the same stand.
Reading a product launch sets quote properly
A professional quote lists every element separately so you can compare vendors fairly and remove items you do not need. A lump sum hides which of these you are about to pay for twice — or not at all.
Four lines go missing more often than the rest: the return journey, the on-site crew, the dismantle, and the tax. On this page's illustrative 36 sq.m figures, transport and installation alone are ₹1,17,000 — which is what a quote without them is quietly saving.
For experience and AV work there are a few lines beyond the obvious ones that belong on the page: the certification the venue will ask for, the drawings the organiser will ask for, and the person whose phone you will be ringing at seven in the morning on build-up day. None of those are large figures. All of them are expensive to arrange late.
- Pre-build or dry assembly at the workshop before dispatch
- Transport to the venue and the return leg, stated separately
- Fire-retardant certification for the materials being used
- Storage of reusable elements after the show, and for how long
- Organiser drawing submission and approval handling
- GST, shown as a figure rather than as a footnote
- Reveal mechanisms
- LED and projection
- Press and photo zones
- Show-calling support
Thirty-six square metres, costed properly
An example is worth more than a range. This one is 36 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.
₹6,73,000 across 36 sq.m is about ₹18,694 per sq.m all-in, and that all-in figure is the one to compare, because it is the only one both vendors have to answer for. The split is the interesting part: fabrication is 48% of the total and everything else is the other 52%, or ₹3,49,000.
Read it with two corrections in mind. First, the band: the structure here is at ₹9,000 per sq.m, and the same area at the top of the band is ₹6,48,000 instead of ₹3,24,000. Second, tax: everything above is pre-GST. Those two adjustments are the difference between a planning figure and a quote.
| Structure and joinery (36 sq.m × ₹9,000) | ₹3,24,000 |
|---|---|
| Lighting — track, aimed spots and backlit panels | ₹54,000 |
| Raised flooring and carpet | ₹43,000 |
| Furniture — counters, seating, planters | ₹38,000 |
| Graphics — brand wall, tensioned fabric and vinyl | ₹97,000 |
| Transport, both ways | ₹52,000 |
| Installation, crew and dismantle | ₹65,000 |
| Indicative total, before GST | ₹6,73,000 |
Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.
The same money, spent two different ways
Because the top of the published band is twice the bottom, every build budget describes two possible stands: a larger one at a plain finish, or one of half the area at a premium one. The table below is that arithmetic at the sizes exhibitors actually book. The right-hand column is what the spread between the two ends of the band is actually spent on.
The arithmetic has a tidy consequence. ₹18,000 less ₹9,000 is ₹9,000, which is the lower figure, so the money that upgrades a stand from the bottom of the band to the top would instead have doubled its area. Whichever you pick, you are spending the same amount — which means the decision is about what the stand has to do, not about what it costs.
Choose by the job, not the taste. Anything involving queuing, demonstrating, handling or sitting down is an argument for area, because the premium finish on a stand nobody can enter is money spent on photographs. Anything involving persuasion rather than throughput is an argument for finish — and in that case a smaller stand, properly lit, beats a larger one that looks provisional.
| Stall size | Lower end of the band | Upper end of the band | The spread pays for |
|---|---|---|---|
| 9 sq.m | ₹81,000 | ₹1,62,000 | Better print, aimed light instead of clip lamps, and an edge finish that survives the week |
| 12 sq.m | ₹1,08,000 | ₹2,16,000 | A laminate that survives handling, a lighting track, and a counter that locks |
| 18 sq.m | ₹1,62,000 | ₹3,24,000 | A raised floor, aimed lighting and furniture you do not have to apologise for |
| 36 sq.m | ₹3,24,000 | ₹6,48,000 | Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner |
| 54 sq.m | ₹4,86,000 | ₹9,72,000 | Double-height brand elements, integrated AV and a storage wall that hides the cartons |
Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.
Where the difference between two prices lives
The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.
Here is the gap itemised, on the same illustrative 36 sq.m stand. Six ordinary substitutions — none of them dishonest, all of them things a vendor might assume — take ₹6,73,000 down to ₹5,23,000. That is ₹1,50,000, or 22% of the total, without anybody quoting a different margin or a different standard of workmanship.
So the fix sits with the buyer. Specify the things above in writing before you circulate the enquiry, and the spread between quotes collapses to something like the real difference between the vendors. Skip it, and you are not comparing prices at all — you are comparing assumptions.
| Line | The two readings of your brief | What to put in writing |
|---|---|---|
| Flooring | A raised platform with cable management against carpet on the hall floor | Raised or not, and where do the cables run? |
| Installation | A day crew against a night-shift crew, with or without supervision | How many crew, on which shift, and who supervises them? |
| Transport | One leg, both legs, or quietly left out | Is the return journey inside this figure? |
| Who builds it | One quote comes from the workshop; the other from somebody who will find one | Whose workshop is it, and may we see a build in progress? |
| Lighting | Fourteen aimed fixtures against six, or against none at all | How many fixtures, of what type, aimed at what? |
| Drawings and approvals | One vendor is preparing the organiser submission; the other expects you to | Who prepares the drawings, and who submits them? |
| Graphics | Tensioned fabric on a frame against printed flex taped to a panel | What is it printed on, and how is it fixed to the wall? |
| Furniture | Hired against fabricated, and a four-piece package against an eight-piece one | List the pieces, and say which are hired and which are built |
None of these rows implies bad faith. They are all consequences of a brief that left a decision open, which is why the brief is the cheapest place to fix them.
| A four-piece hired furniture package instead of eight pieces | ₹12,000 |
|---|---|
| Installation and dismantle left as "to be advised" | ₹31,000 |
| Lighter board in the structure, with an exposed edge instead of a finished one | ₹42,000 |
| Printed flex taped to panels instead of tensioned fabric on a frame | ₹26,000 |
| Six aimed spots instead of fourteen, and no backlit panel | ₹18,000 |
| Carpet laid straight on the hall floor instead of a raised platform with cable management | ₹21,000 |
| Total difference between the two quotes | ₹1,50,000 |
Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.
Where to cut, and where cutting costs more
Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.
The test is simple: ask what happens if this line is not there. If the answer is "nothing, nobody would notice", delete it with confidence. If the answer is "we deal with it on site", you have not removed a cost, you have moved it to the most expensive place and time available, and attached a risk to it.
Below: the real options as a list, then the false economies as a table. Read the list first if you are over budget, because the savings in it are larger and none of them will be visible from the aisle.
- A ceiling or hanging element, unless the stand has to be found from across the hall
- Fabricated furniture, where hired furniture would have been collected afterwards anyway
- A second screen that repeats what the first screen is already showing
- Wall height above the sightline, which costs material and is read by nobody
- A model, a mock-up or a prop that duplicates something the product already demonstrates
- Veneer or PU paint where a good laminate reads identically from the aisle
| Line item | Why it reads as padding | The consequence |
|---|---|---|
| Supervision during build-up | The crew knows the drawing | When a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window |
| Dismantle and clearance | The show is over by then | The organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards |
| Raised flooring | Carpet on the hall floor costs less | The cables then run under the carpet, and every visitor finds them with their feet |
| Fire-retardant certified material | Nobody asks to see the certificate | The venue safety officer asks, and an uncertified panel is refused at the hall door on the first morning |
| One spare panel for the hero wall | It will be fine | A scuffed hero panel is the one thing every photograph of the stand will show |
| The cable and socket count on the drawing | That is site detail | Site detail becomes a visible extension lead across the floor of a stand you paid to look expensive |
| The power load calculation | The organiser supplies power | The organiser supplies the load you declared. A screen added after the declaration is a screen without power |
The common thread is that each one is cheap in a workshop and expensive at a venue. Timing, not quality, is what makes them worth keeping.
Delete what nobody will look at. Keep what everybody will walk on, touch, or need power from.
The price of a late decision
Almost every overrun we see has the same shape. The quote was accurate; the decisions arrived late. A change costs nothing while nothing has been drawn to scale, and it costs a night shift once the stand is in the hall — the same change, twenty times the price.
So the cheapest thing you can buy is time at the front. A 36 sq.m build runs to 4 weeks on our schedule — 3 weeks base plus 1 for the area — and a premium finish or a double-decker element adds 2 and 2 weeks respectively. None of that window is spare, which is exactly why a decision taken in week one is free and the same decision in week four is not.
Protect yourself with two things. First, a single named approver — two people with different opinions about the same wall is the most expensive organisational arrangement in exhibiting. Second, a written variation process, so that every change has a price attached at the moment it is agreed rather than at the moment it is invoiced.
| When the change comes | What it costs | Why |
|---|---|---|
| After design sign-off, before production | A redraw and a requote | Drawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you |
| After materials are ordered | The material, plus its replacement | Board, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts |
| In production | The labour already spent, plus the labour to redo it | A fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved |
| After graphics go to print | A full reprint of the affected panel | Large-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment |
| After dispatch | Freight both ways, and a hole in the build schedule | The panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience |
| During build-up | Night-shift labour, and whatever can be improvised | There is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you |
The pattern is the whole lesson: the cost of a change is set by what has already been bought, drawn or built, not by how large the change is.
Exhibiting soon? Let's build your stall.
Working back from the number you have
Most exhibitors do not start with a design, they start with a number. Working backwards from that number is a more reliable method than briefing a design and discovering afterwards what it costs — and it has one step that nearly everybody misses, which is subtracting the costs that no stand builder will ever quote you.
What follows is the list of costs no stand builder will quote you, and then one way to split a total, shown against ₹10,00,000. Treat it as an illustration and not as a benchmark — there is no published standard and we are not inventing one. Its useful feature is the last two lines: ₹9,00,000 is what a builder quotes against, ₹1,00,000 is yours alone, and ₹50,000 of the total is held back rather than committed.
In this illustration the build line is ₹4,50,000: 50 sq.m of custom structure at ₹9,000 per sq.m, or 25 sq.m at ₹18,000. That single comparison — booked area against affordable area — settles the construction-type question before anybody draws anything, and it is a far less painful conversation to have at this stage than after a concept has been approved.
- Storage of reusable elements between this edition and the next
- The organiser's power connection, charged against the load you declare
- Lead-capture devices, the data connection, and somewhere to charge them
- Promoters, hostesses or interpreters, if your visitors need them
- Travel, hotels and local transport for everyone who will stand on the stand
- Photography and video of the finished stand, which is the asset you use all year
- Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
- Space rental, invoiced to you by the organiser rather than by your stand builder
| Allocation | Share | Illustrative amount |
|---|---|---|
| Stand build — structure, joinery and finish | 45% | ₹4,50,000 |
| Graphics, lighting and AV | 20% | ₹2,00,000 |
| Flooring and furniture | 10% | ₹1,00,000 |
| Transport, installation and dismantle | 15% | ₹1,50,000 |
| Your own show costs — travel, staffing, collateral, hospitality | 5% | ₹50,000 |
| Contingency, held back rather than allocated at briefing | 5% | ₹50,000 |
Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.
Size, space and what fits inside it
Before comparing prices per square metre, look at what a square metre does. Our planner's ratios are simple: storage at 10% up to 18 sq.m and 15% beyond it, a default 5% for a meeting corner, and the balance as display. Apply them and most stall-size arguments resolve themselves.
Read the visitor column as a constraint rather than as information. It is display area divided by 2.5, and if your footfall expectation implies more people in the stand at once than that, the thing standing in the way is the floor plan, not the campaign.
The build-weeks column is a budget column in disguise. Our schedule is 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for a premium finish and +2 for a double-decker. Compressing it does not reduce the work; it relocates the work to night shifts and rush rates.
| Stall size | Usable display | Storage | Staff on the stand | Visitors it holds | Weeks to build |
|---|---|---|---|---|---|
| 12 sq.m | 10.2 sq.m | 1.2 sq.m | 2 | 4 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
| 72 sq.m | 57.6 sq.m | 10.8 sq.m | 8 | 23 | 5 |
Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.
Paying for it: stages and deliverables
We will not quote you a standard payment split, because there is not one to quote. What matters more than the percentages is whether each stage is attached to something you can verify. Terms are agreed in the quote; this section is about what to ask for inside them.
One rule covers most of it: tie money to evidence. Drawings approved, materials bought, a pre-build you can inspect, a stand handed over complete — those are things you can see. Dates are not evidence of anything, because a date arrives whether or not the work did.
One more thing belongs in this conversation, because it is where disputes actually start: the variation process. Agree, before the first payment, who on your side approves a change, in what format, and whether its price is confirmed before the work begins. Unpriced variations are where almost every uncomfortable conversation about an exhibition invoice begins, and they are the one budget risk that is entirely administrative to remove.
01
Confirm what the first payment actually unlocks
Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.
02
Ask what happens if the show moves
Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.
03
Keep something payable after handover
Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.
04
Keep the organiser's bills on a separate line
Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.
05
Get the tax position in writing
Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.
06
Tie every stage to something you can see
A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.
The invoice you argue about is almost always the one that followed a verbal agreement.
Spreading the cost over a programme of shows
Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.
Costed properly — see the example — the second show has no structure line, a graphics reprint, a refurbishment allowance, storage between editions, and transport and installation as before. The total is ₹2,15,000 — 32% of the ₹6,73,000 first show — because ₹4,58,000 of that first figure was a one-time purchase.
The table follows it across three shows, and the average per show falls from ₹6,73,000 to ₹4,44,000 and then to about ₹3,67,667 — a fall of 45% against the first outing, with nothing negotiated and no corner cut. That is the strongest cost lever in exhibiting, and it is available only to exhibitors who asked for it before the first stand was built.
It depends on three things being true. A modular structure that comes apart without damage; graphics as a removable layer rather than as part of the wall; and storage, which costs money and is therefore a line in the example rather than an assumption. Miss any one and the second show is close to the price of the first.
| Outing | This edition | Spent to date | Running average |
|---|---|---|---|
| Show 1 — the first build | ₹6,73,000 | ₹6,73,000 | ₹6,73,000 |
| Show 2 — same structure, new graphics | ₹2,15,000 | ₹8,88,000 | ₹4,44,000 |
| Show 3 — same structure, new graphics | ₹2,15,000 | ₹11,03,000 | ₹3,67,667 |
Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.
| Graphics reprinted for the new show and the new message | ₹48,000 |
|---|---|
| Refurbishment — replaced panels, touch-up paint, relaminating what is marked | ₹32,000 |
| Storage of the structure between the two shows | ₹18,000 |
| Transport, both ways | ₹52,000 |
| Installation, crew and dismantle | ₹65,000 |
| Indicative second-show total, before GST | ₹2,15,000 |
Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.
Where to save, and where the saving shows
Put the money where a visitor's eye lands before they decide whether to walk in: the main graphic, the lighting on it, and whatever you most want them to look at. Everything behind that can be built to a budget without anybody noticing.
Three habits cut more than any negotiation does — reuse the frame, hire rather than build the furniture, and keep graphics on fabric so next year's edition costs a reprint instead of a rebuild.
What not to cut is lighting. Hall lighting is designed for circulation, not for your product, so an unlit stand reads as under-funded no matter what the joinery cost. It is the cheapest line with the largest visible effect.
One qualification on the whole list: timing. Each of these is a genuine saving if it is decided before the brief is frozen and an expensive change if it is decided afterwards. Hiring furniture is cheaper than building it; deciding to hire it after it has been built is not.
- Keep graphics on fabric, so the next edition is a reprint instead of a rebuild
- Print one hero graphic properly and keep everything around it plain
- Build the storage wall out of the back of the display wall, so one structure does two jobs
- Share a lorry with your own product freight, if the dates allow it
- Keep the footprint simple — every curve, angle and radius is another line on the cutting list
- Hire furniture and planters rather than fabricating them for a week
- Book early: rush charges and night-shift labour are avoidable rather than inevitable
The three expensive failures
The three failures that cost exhibitors real money on product launch sets are all avoidable at quoting stage. Under-specified equipment that looks dull in a bright hall. That is settled at quoting stage rather than at the venue, and the fix is to ask what the quote actually specifies, and who will physically do the work, before you compare totals.
The second failure is unwritten scope. A quote that does not name the board, the fixture count and the flooring type is a quote for an unspecified stand, and two such quotes cannot be compared with each other at all.
The third failure is a budget that was correct when it was written. Scope added in ones and twos after sign-off does not announce itself as an overrun until the final invoice, which is exactly why the change procedure matters as much as the price.
- Under-specified equipment that looks dull in a bright hall
- No rehearsal or technical run before doors open
- Missing backup power or spare units
- Content not built for the actual screen or surface size
How to get a real figure
Share your event name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept and an itemised product launch sets quote, usually within 48 hours.
What we do: free 3D design with every confirmed fabrication order, fabrication in our own workshops, organiser drawings and approvals handled, and a single project manager from brief to dismantle. Quoted per launch.
One closing piece of advice that applies to every vendor including us. Ask for the itemised scope, ask explicitly what is excluded, and ask how variations are priced. A supplier who answers all three without hesitation is telling you something useful about how the build will go.
Frequently asked questions
How much contingency should I hold back?+
Enough to absorb one change you have not thought of yet. The illustrative allocation on this page holds back ₹50,000 of ₹10,00,000, which is a planning habit rather than a published rule — set your own figure, but set it before briefing, because a contingency invented afterwards is just an overrun.
Is the cheapest quote ever the right one?+
Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.
Is GST included in product launch sets quotes?+
A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.
How much does product launch sets cost in India?+
Quoted per launch. For a custom build, work from ₹9,000–₹18,000 per sq.m for the structure, and treat graphics, lighting, flooring, furniture, AV, transport, installation and taxes as separate lines rather than as details inside that figure.
Does reusing a stand really lower the cost?+
Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹2,15,000 rather than ₹6,73,000 — 32% of the first show — because ₹4,58,000 of the first build is not bought again. Across three shows the average falls to about ₹3,67,667.
Do you charge separately for design?+
3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.
Who pays the organiser for space and power?+
You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.
What is never included in a stall quote?+
Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,00,000 of ₹10,00,000 — small enough to forget and large enough to hurt.
How far ahead should I book to avoid rush costs?+
Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.