India's largest stall fabrication network · 119 cities · 1,461 venues
15 Questions to Ask Before You Hire for Conference Setups

Questions to Ask

15 Questions to Ask Before You Hire for Conference Setups

A staged interview for any conference setups vendor — 15 questions covering capability, pricing, contract and build-up, with the diagnosis for each answer you are likely to get back.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 13 min read

Short answer

The 15 questions worth asking a conference setups vendor cover four things: who owns the work, what the price actually includes, what goes in writing before you pay, and who is in the hall during build-up. Judge the replies by shape rather than content — a name, a date, a document or a number is an answer, and anything that merely reassures you is not.

Key takeaways

  • Ask what your area can physically hold — at 36 sq.m the honest answer is about 11 visitors and 4 staff.
  • Ask what the quote excludes, never whether everything is included — the second question always gets a yes.
  • Put the same questions to three vendors and write the answers in three columns. The gaps do the work for you.
  • Tie each payment milestone to a deliverable you can inspect, and keep a balance payable after handover.
  • Insist on approving dimensioned drawings rather than a render before fabrication starts.
  • Ask who physically does the work. Every other answer depends on it.

How this interview works

Most vendor questionnaires fail for the same reason: they collect answers nobody knows how to read. Every firm says the work is in-house, every firm says the quote is all-inclusive, and every firm says their team will be on site. The useful skill is not asking the question — it is recognising, from the shape of the reply, whether the person answering has done this before.

That is why each question carries two notes: the answer that should settle it, and the answer that should worry you. The underlying test never changes. Specifics can be checked; reassurance cannot, and a conference setups vendor who offers only the second has told you something useful anyway.

Keep to the order. Each stage asks things that are still answerable truthfully at that point: capability before you shortlist, scope while the quote is being built, documents before money moves, logistics once the build is done. Out of sequence, the same questions produce politer and less useful replies.

First stage — is this firm worth briefing? (questions 1 to 4)

This is the filtering stage, and it is best done on the phone in twenty minutes. None of these questions needs your brief, your budget or your drawings — which means nobody can tune the answers to them.

All of them are really one question asked from several directions: does this firm control the thing it is selling? This guide is written for event managers, corporate communication teams and agencies running conferences, launches, dealer meets and public shows, and most of them find out the answer during build-up week. You can find it out in a twenty-minute call, which is the whole argument for asking these first.

  1. 01

    1. Have you worked at my venue, and what are its rules on height, rigging and fire rating?

    A good answer is specific about the hall — the height limit, whether rigging is allowed, what fire certification the organiser demands, and when drawings have to be submitted. A bad answer is "we work at every venue in India". Breadth is not the claim you need; one correct hall rule tells you more than a list of twenty cities.

  2. 02

    2. Who will be my single point of contact, from brief through dismantle?

    A good answer is a name, a role and a mobile number, plus confirmation that the same person is physically on site during build-up and show days. A bad answer is "our team" or "our coordination desk". Shared accountability is no accountability, and a contact who changes at handover means nobody carries the history of your decisions onto the floor.

  3. 03

    3. Which parts of this scope do you buy in, and from whom?

    A good answer names them without being pushed — nobody owns everything, and print, AV, furniture and freight are routinely bought. What you are listening for is whether the person knows their own supply chain. A bad answer treats the question as an accusation, which usually means more of the scope is bought in than they want to discuss.

  4. 04

    4. Who physically does this work — your own team, or a sub-contractor?

    A good answer is honest about the split, because every firm buys something in: print, AV hire, furniture, freight. You want to hear which trades are owned and which are bought, followed by an address. A bad answer is either a vague "we have a partner network" or a flat claim that everything is in-house with no site you can visit — the second is usually the same as the first, with less candour.

Second stage — making the numbers comparable (questions 5 to 8)

Now you have two or three vendors working from the same brief. These questions are what make their numbers comparable, and they are the ones most often skipped because they feel adversarial. They are not — a vendor who answers them well is making their own life easier too, since an itemised scope is also their defence against scope creep.

Quoted per event. The variables that move a conference setups price are well known, and the list below is all of them. Ask a vendor which two matter most on your job: a confident, specific ranking means the quote was built, and a vague answer means it was guessed.

  • Show duration and number of event days
  • Equipment size and specification (screen size, projector brightness or drone count)
  • Content creation and programming time
  • Rigging, power backup and technician crew size
  • Permissions, venue rules and rehearsal time
  1. 01

    5. Are transport both ways, installation, electrical fittings and dismantle inside this figure?

    A good answer goes line by line, yes or no, without hedging. A bad answer is a general "yes, everything's included" — which is the reply this question always draws, and the reason to put it as four separate questions. These are the four scopes most often missing, none of them is optional, and all of them get bought at show-week rates when they surface late.

  2. 02

    6. How many light fittings, and where exactly?

    A good answer is a count and a set of positions — spots on the brand wall, track over the product, a backlit panel at the entrance. A bad answer is "lighting included". Hall lighting is designed for the aisles rather than for your stand, which makes the lighting count the line most responsible for whether the stand reads as funded or forgotten.

  3. 03

    7. Is GST included, and what is the pre-tax total?

    A good answer gives both figures without being chased, because that is the only way two quotes can be compared on the same basis. A bad answer is ambiguity, or a total that quietly changes basis between the proposal and the invoice. Ask also which organiser or venue charges will be billed through the vendor rather than directly to you.

  4. 04

    8. If I remove something from this quote, what does the total become?

    A good answer is a revised figure within a day, because the quote was assembled from line items in the first place. A bad answer is a vague "we'll adjust" or a total that barely moves — the first means there were no line items, the second means the removed item was never honestly costed.

Before you sign: questions 9 to 12

This is the stage that decides whether you have a contract or an understanding. Each gap left open here is one you will meet again in the hall, at a moment when you have no leverage and no time.

Nothing in this stage touches aesthetics or cost. It is entirely paperwork: what gets signed, when, and by whom. Those are the variables that separate a stand built to the agreement from a stand built to whatever was remembered.

  1. 01

    9. What insurance and site documentation do you carry?

    A good answer arrives immediately, because any firm working regularly in exhibition halls keeps it to hand. A bad answer is a promise to check and come back. It is a dull question with a revealing answer — it separates contractors who work in venues every month from those about to find out what a venue requires.

  2. 02

    10. What drawings will I approve, and by when, before anything is cut?

    A good answer names dimensioned plans and elevations with finishes and lighting positions marked, and gives you a date for sign-off. A bad answer is "you've approved the render". A render is an impression; a drawing is an instruction. If what you signed has no dimensions on it, "this is not what we approved" is an argument you cannot win.

  3. 03

    11. Will you dry-build the stand in the workshop before dispatch, and can I see proof?

    A good answer is yes, with photographs or a video, panels numbered and circuits tested. A bad answer treats it as unnecessary. Where the first assembly happens decides whether build-up is assembly or problem-solving, and problem-solving in a hall costs hours you have not got.

  4. 04

    12. What are the payment milestones, and what does each one release against?

    A good answer attaches every instalment to something inspectable: a signed scope, approved drawings, the submission acknowledgement, a workshop dry build, handover of a working stand. A bad answer is a schedule of bare dates, or most of the money up front. Keep a meaningful balance payable after handover — it is what keeps a crew on the stand on show morning.

Last stage — the week that decides it (questions 13 to 15)

The last of them are asked a week or two before the show, when the build is done and the risk moves from production to logistics. Vendors expect design and pricing questions; far fewer expect to be asked for a build-up plan, which is exactly why the answers here are so informative.

The outcome you paid for is an experience strong enough that guests film and share it, with a clear brand moment and a call to action timed in the show — and it is won or lost in the last twenty-four hours before doors open. That is the window these questions are about.

  1. 01

    13. What do you need from me, and by when?

    A good answer is a dated list: artwork at final size, product dimensions, staff numbers, any samples to be displayed. A bad answer is "nothing, we'll handle it". Most build-up delays trace back to an input that arrived late, and a supplier who has not asked for yours has not planned backwards from the date.

  2. 02

    14. What is the backup if something fails during show hours?

    A good answer is concrete: spares carried to site, a technician reachable within minutes, a named person on the floor through show hours, and a replacement path for anything that would stop the stand working. A bad answer is "nothing has ever failed". Lamps fail, laminate chips, screens drop signal and power trips — the only question is whether somebody planned for it.

  3. 03

    15. What is the build-up plan — arrival slot, crew size and working hours?

    A good answer is a time, a number of people, a shift pattern, and the hour by which the stand will be finished and cleaned before doors open. A bad answer is "we'll be there from day one". Build-up windows are short and shared with every other exhibitor in the hall, so a vendor without a scheduled slot is planning to queue for the loading bay.

Exhibiting soon? Let's build your stall.

Or use the full form

Question, good answer, warning sign

Here are the ones where a plausible answer most often turns out to be empty. Every row applies the same test — is there anything in this reply you could check next week? Have it in front of you while you talk, not after.

Ask thisGood replyBad reply
Who is on site at build-upA name, a crew size and the shift hoursOur team will be there
What do you need from meA dated list of inputsNothing, we'll handle it
What happens after the showDismantle inside the organiser's window, elements into storageNo answer, because dismantle was never priced
What are the payment milestonesEach instalment tied to something you can inspectA schedule of dates, with most of it up front
Who submits to the organiserThe documents, the person and the deadlineThe organiser will let you know
Can I see finished workPhotographs from a named show, with the stall area and the yearRenders only, or images with nothing attached to them
What will I approve before cuttingDimensioned plans and elevations, by a stated dateThe render you have already been shown

The good column is almost always the shorter one. That is the quickest heuristic in this guide — specifics are compact, and reassurance needs room.

The size question most exhibitors never ask

A final question, and the most revealing of the lot: what will my area actually hold? It takes a conference setups vendor about ten seconds to work out, which means an evasive answer is not a limitation of the question.

Work it through once and you can check any vendor's answer. Storage: 10% up to 18 sq.m, 15% above. Meetings: 5%, or 20% if that is why you are exhibiting. Display takes the balance, holds one visitor per 2.5 sq.m, and the stand needs one staff member per 9 sq.m of total area.

Why it matters: footfall expectations and stand capacity are usually set by different people who never compare notes. If your campaign is built around a volume of visitors the stand cannot physically hold, the constraint is the stand, not the marketing — and that is a conversation to have at briefing stage, not on day one.

Stall areaDisplayStorageStaff on dutyVisitors at onceBuild weeks
9 sq.m7.6 sq.m0.9 sq.m233
12 sq.m10.2 sq.m1.2 sq.m243
18 sq.m15.3 sq.m1.8 sq.m263
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235

Figures follow the published ratios — one staff member per 9 sq.m (minimum 2) and one visitor per 2.5 sq.m of display. Build weeks exclude your own approval time.

When the answer is the decision

Some replies are not warning signs to weigh up — they are conclusions. The first group below are the failure modes specific to conference setups; if a vendor's answers point at any of them, you have learned what you needed to learn and the next call is to the second name on your list.

  • Under-specified equipment that looks dull in a bright hall
  • No rehearsal or technical run before doors open
  • Missing backup power or spare units
  • Content not built for the actual screen or surface size
  • No answer at all on dismantle, clearing or storage
  • Reference images that cannot be tied to a show, a size or a year
  • Every question fielded by the salesperson and none by anyone who builds
  • A discount offered the moment you hesitate, with nothing removed from the scope
  • A deadline on your decision that belongs to their cash flow rather than your show
  • An advance requested before any scope document exists
  • No one able to say who will be standing on your stand on build-up morning
A reply you cannot check next week is not an answer, however confident it sounds.

After the interview

Keep one page with the vendors across the top and the questions down the side. You are not scoring eloquence — you are looking for the empty cells, which are invisible in a phone call and obvious in a grid.

Finally, judge the whole set rather than the individual replies. The stand is a means to a result, and a supplier who is flawless on logistics but blank on what the show is for will build exactly what you specify — including your mistakes.

  • Who does the work, and the address where it happens
  • What the quote excludes, in writing and signed
  • What the vendor needs from you, and by when
  • The material specification, including the fire treatment
  • The show-day backup plan and who is on the floor
  • Who submits the organiser paperwork, and the deadline
  • The project manager's name and mobile number

The next step

Send all three vendors the same brief and the same questions: show name, city, dates, stall area, number of open sides, budget band, and two or three reference images with a line on what you liked about each. Identical inputs are what make the replies comparable, and how quickly and precisely a vendor answers before you have paid anything is the best available preview of how they will answer during build-up week.

We are happy to be interviewed this way — written answers, every question. Design free with a confirmed fabrication order, production in our own workshops, organiser submissions handled, and one named project manager accountable from brief through dismantle.

Frequently asked questions

How do I know if my stand is the right size?+

Ask the vendor what it can hold. At 36 sq.m the arithmetic gives about 28.8 sq.m of display, room for roughly 11 visitors at a time and 4 staff on duty. If your footfall expectation is far above that, the constraint is the stand rather than the campaign.

Which question matters most?+

Who physically does the work. It decides who controls quality and who controls the date, and every other answer — pricing, drawings, site crew, backup plans — depends on it.

How many vendors should I put these questions to?+

Three, with the same brief. Two gives you nothing to calibrate an outlier answer against, and five is more work than the comparison repays.

Is it reasonable to ask to visit the workshop?+

Entirely. It is a routine request for anyone buying a fabricated product, and the reaction to the question is informative even before the visit happens.

What should I ask a conference setups vendor about pricing?+

Quoted per event. Beyond the figure, ask what drives it, what would make it cheaper, which lines are excluded, and what the pre-tax total is. A vendor who can rank the drivers for your brief has priced the job rather than guessed at it.

What should I ask about the venue's rules?+

Ask for the height limit, whether rigging is permitted, the fire certification the organiser requires, and the date drawings must be submitted. Specific knowledge of one hall beats a claim to work in every city.

How long should this take?+

About a thirty-minute call for the first stage, then one document request each at quoting and signing. Set against a build that needs 3 weeks or more, it is the cheapest hour in the whole project.

What is the best question to catch a sub-contracted build?+

"Can I visit the workshop this week?" A firm that owns production answers with an address and a day. Anything that defers the visit — after the order, nearer the show, once design is approved — is the answer by another route.

Conference Setups near you

Our crews deliver conference setups in every major Indian city.

Powered byIRPR