By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 13 min read
Short answer
Ask a turnkey messe solutions vendor where the work is produced and who supervises it, which lines the quote excludes, what drawings you sign before cutting starts, who lodges the organiser paperwork and by when, what each payment milestone releases against, who is on the floor during show hours, and what happens to the stand after the show. Then grade the answers on specificity, because that is what predicts delivery.
Key takeaways
- Ask what happens after the show. Dismantle, clearing and storage are where unpriced costs hide.
- Ask what the quote excludes, never whether everything is included — the second question always gets a yes.
- Put the same questions to three vendors and write the answers in three columns. The gaps do the work for you.
- Ask what your area can physically hold — at 36 sq.m the honest answer is about 11 visitors and 4 staff.
- Insist on approving dimensioned drawings rather than a render before fabrication starts.
- Ask what the vendor would change about your brief. A supplier with no opinion is not reading it.
Reading the answer, not just asking the question
The hard part was never the questions. Any vendor will tell you the work is in-house, the price is all-inclusive and their team will be there. What you need is a way of hearing the difference between a sentence that commits to something and a sentence that merely sounds right.
Every question is therefore paired with its diagnosis. One test runs through all 15 of them — does the reply contain something verifiable? A strong turnkey messe solutions vendor produces a name, a date, a document or a figure. A weak one produces confidence, which is not the same thing and cannot be checked.
Work through the stages in order. Questions asked at the wrong moment get the wrong answers — pricing questions before the brief is understood produce a number the vendor has to defend rather than revise, and build-up questions asked after signing produce whatever is convenient rather than whatever was planned.
Before you shortlist: questions 1 to 4
These decide who is worth briefing at all. Ask them on a call, before any design or pricing conversation, because they are about the firm rather than about your project — and because the answers are much harder to tailor when the vendor does not yet know what you want to hear.
Notice that they circle one issue: ownership of the work. For large exhibitors, government bodies, export councils and multinationals who want a single accountable partner for the whole participation, that is the single fact most likely to be discovered too late, and it is also the easiest to establish early if you simply ask directly.
01
1. What were the largest and the smallest stands you delivered last season?
A good answer is two areas and two shows, and it brackets your own stand somewhere in between. A bad answer is a range so wide it must be aspirational. Capability is size-specific: a firm that turns out neat small system booths may never have engineered a structure, and a pavilion specialist will price your small stand like a pavilion.
02
2. Who physically does this work — your own team, or a sub-contractor?
A good answer is honest about the split, because every firm buys something in: print, AV hire, furniture, freight. You want to hear which trades are owned and which are bought, followed by an address. A bad answer is either a vague "we have a partner network" or a flat claim that everything is in-house with no site you can visit — the second is usually the same as the first, with less candour.
03
3. How many jobs are in your production queue for my show week?
A good answer is a number, ideally with an unprompted note about which of them is largest — it tells you whether your stand is the priority or the filler. A bad answer is "don't worry, we'll manage", which is what a firm says when the queue is not theirs to see, or when they already know the answer is uncomfortable.
04
4. Can I see photographs of finished projects at my size, from a show you can name?
A good answer brings on-site photographs with the show, the city, the stall area and the year attached, including shots of the stand occupied by staff and visitors rather than empty at handover. A bad answer is renders only. A render proves somebody can design; only a photograph proves somebody can build, and the gap between the two is where most disappointment lives.
At quoting stage: questions 5 to 8
With a shortlist briefed, the job changes: you are no longer assessing firms, you are making quotes mean the same thing. Buyers skip this stage because it feels like haggling. It is the opposite — a vendor with an itemised scope is protected from scope creep just as much as you are.
Package pricing per show. The variables that move a turnkey messe solutions price are well known, and the list below is all of them. Ask a vendor which two matter most on your job: a confident, specific ranking means the quote was built, and a vague answer means it was guessed.
- Total area and number of co-exhibitors
- Scope (design, build, AV, furniture, logistics, manpower, hospitality)
- Number of cities or shows in the programme
- Approval layers with organisers, embassies or departments
01
5. Is GST included, and what is the pre-tax total?
A good answer gives both figures without being chased, because that is the only way two quotes can be compared on the same basis. A bad answer is ambiguity, or a total that quietly changes basis between the proposal and the invoice. Ask also which organiser or venue charges will be billed through the vendor rather than directly to you.
02
6. Will you itemise the quote, and will you write down what it excludes?
A good answer is yes to both, with the exclusion list as a separate signed page. A bad answer is a lump sum defended as "simpler for you", or an itemised quote with no exclusions at all — which is not transparency, it is an unanswered question. The exclusion page is the single most useful document in the process and the one you have to ask for by name.
03
7. How many light fittings, and where exactly?
A good answer is a count and a set of positions — spots on the brand wall, track over the product, a backlit panel at the entrance. A bad answer is "lighting included". Hall lighting is designed for the aisles rather than for your stand, which makes the lighting count the line most responsible for whether the stand reads as funded or forgotten.
04
8. What materials and finishes are you quoting, exactly?
A good answer names board thickness, the laminate or paint finish, and the fire treatment. A bad answer is "premium quality" or "imported finish". Specification is what the organiser's safety check examines, and it is also the only way to tell whether a cheaper quote reflects a better rate or a thinner board.
Third stage — turning a conversation into a contract (questions 9 to 12)
This is the stage that decides whether you have a contract or an understanding. Each gap left open here is one you will meet again in the hall, at a moment when you have no leverage and no time.
Design and price are already settled by now. What remains is authority and evidence — who may approve what, and what exists on paper when it matters. Unglamorous, and the reason most disputes never happen.
01
9. What happens if you are late?
A good answer is uncomfortable but specific: here is the slack in the schedule, here is who we call, here is what we would do. A bad answer is that it has never happened. You are not really looking for a penalty clause — you are looking for evidence that somebody has thought about the failure case before being inside it.
02
10. Who prepares and submits the organiser paperwork, and by what date?
A good answer lists the actual documents — stand drawings, electrical load, material certificates — names who lodges them, and states the organiser's deadline from memory. A bad answer is "the organiser will tell you what they need", which pushes a hard deadline onto the party least equipped to meet it. A rejected submission costs build-up days nobody has spare.
03
11. What drawings will I approve, and by when, before anything is cut?
A good answer names dimensioned plans and elevations with finishes and lighting positions marked, and gives you a date for sign-off. A bad answer is "you've approved the render". A render is an impression; a drawing is an instruction. If what you signed has no dimensions on it, "this is not what we approved" is an argument you cannot win.
04
12. Will you dry-build the stand in the workshop before dispatch, and can I see proof?
A good answer is yes, with photographs or a video, panels numbered and circuits tested. A bad answer treats it as unnecessary. Where the first assembly happens decides whether build-up is assembly or problem-solving, and problem-solving in a hall costs hours you have not got.
Last stage — the week that decides it (questions 13 to 15)
Ask these once the stand is built and the risk has shifted from the workshop to the loading bay. Few vendors are braced for them, because most buyers stop asking questions after signing — which makes this the stage where the replies are least rehearsed.
What the show finally has to deliver is a participation plan where every touchpoint, from the pavilion entrance to the VIP lounge, is designed to move visitors toward a meeting. These questions test whether anyone has planned for the hours in which that actually happens, because a stand still being assembled at ten in the morning on day one delivers none of it.
01
13. What are you bringing as spares?
A good answer is a short, specific list: laminate offcuts, spare lamps, a reprint of the main graphic, basic tools. A bad answer is that spares will not be needed. Transport damage is routine rather than exceptional, and a crew that travels with the fix turns a two-hour problem into a ten-minute one.
02
14. What do you need from me, and by when?
A good answer is a dated list: artwork at final size, product dimensions, staff numbers, any samples to be displayed. A bad answer is "nothing, we'll handle it". Most build-up delays trace back to an input that arrived late, and a supplier who has not asked for yours has not planned backwards from the date.
03
15. What is the backup if something fails during show hours?
A good answer is concrete: spares carried to site, a technician reachable within minutes, a named person on the floor through show hours, and a replacement path for anything that would stop the stand working. A bad answer is "nothing has ever failed". Lamps fail, laminate chips, screens drop signal and power trips — the only question is whether somebody planned for it.
Exhibiting soon? Let's build your stall.
The answers most likely to mislead you
Here are the ones where a plausible answer most often turns out to be empty. Every row applies the same test — is there anything in this reply you could check next week? Have it in front of you while you talk, not after.
| What you ask | A good answer sounds like | A warning sign |
|---|---|---|
| Who submits to the organiser | The documents, the person and the deadline | The organiser will let you know |
| How many lights | A count and a position for each one | Lighting included |
| What are the payment milestones | Each instalment tied to something you can inspect | A schedule of dates, with most of it up front |
| What is excluded | A written exclusion page attached to the quote | The phrase all-inclusive, with no list behind it |
| What happens after the show | Dismantle inside the organiser's window, elements into storage | No answer, because dismantle was never priced |
| Can I see finished work | Photographs from a named show, with the stall area and the year | Renders only, or images with nothing attached to them |
| What do you need from me | A dated list of inputs | Nothing, we'll handle it |
None of the warning signs is a lie. They are all true statements that cannot be verified, which is exactly what makes them worth noticing.
The size question most exhibitors never ask
A final question, and the most revealing of the lot: what will my area actually hold? It takes a turnkey messe solutions vendor about ten seconds to work out, which means an evasive answer is not a limitation of the question.
The sums are these: 10% of the area to storage up to 18 sq.m and 15% beyond it, 5% to a meeting corner — 20% if meetings are the point of attending — and the rest to display. Display divided by 2.5 gives simultaneous visitors; total area divided by 9 gives staff on duty.
The reason to ask is that nobody else will. Marketing sets a footfall target, procurement books the area, and the two numbers are rarely held up against each other until the aisle is blocked. Finding the mismatch while the brief is open costs nothing.
| Stall area | Display | Storage | Staff on duty | Visitors at once | Build weeks |
|---|---|---|---|---|---|
| 12 sq.m | 10.2 sq.m | 1.2 sq.m | 2 | 4 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
| 100 sq.m | 80 sq.m | 15 sq.m | 12 | 32 | 5 |
Figures follow the published ratios — one staff member per 9 sq.m (minimum 2) and one visitor per 2.5 sq.m of display. Build weeks exclude your own approval time.
When the answer is the decision
Not everything here needs weighing against the price. The first group holds the failures peculiar to turnkey messe solutions, the ones you cannot recover from in a hall; the second holds the behaviours that reliably precede them.
- Too many vendors with no single point of accountability
- Inconsistent branding across co-exhibitor booths
- Budget overruns from scope that was never itemised
- Delayed approvals that compress build-up time
- A delivery week offered in place of a dated production schedule
- No answer at all on dismantle, clearing or storage
- No one able to say who will be standing on your stand on build-up morning
- Reference images that cannot be tied to a show, a size or a year
- A discount offered the moment you hesitate, with nothing removed from the scope
- An advance requested before any scope document exists
- A material specification that says premium and names nothing
Every vendor sounds the same until you ask who is in the hall on build-up morning.
Turning replies into a decision
Record as you go, in a fixed order, one column per vendor. This is the whole method: in conversation a non-answer passes for an answer, and in a table it does not.
Finally, judge the whole set rather than the individual replies. The stand is a means to a result, and a supplier who is flawless on logistics but blank on what the show is for will build exactly what you specify — including your mistakes.
- Who submits the organiser paperwork, and the deadline
- The dismantle plan, and where reusable elements are stored
- The show-day backup plan and who is on the floor
- The payment milestones and the deliverable behind each one
- The build-up arrival slot, crew size and shift hours
- What the quote excludes, in writing and signed
- The material specification, including the fire treatment
Ask all three at once
Put the brief and the question set out together, unchanged, to all three. Show, city, dates, area, open sides, budget band, and a few annotated references. The replies are a free trial: the speed and precision you get before paying is the speed and precision you get in build-up week.
We are happy to be interviewed this way — written answers, every question. Design free with a confirmed fabrication order, production in our own workshops, organiser submissions handled, and one named project manager accountable from brief through dismantle.
Frequently asked questions
What should I ask about dismantle?+
Who does it, whether it happens inside the organiser's window, what is cleared, and where the reusable frames and graphics are stored afterwards. Unpriced dismantle is where deposits and penalties surface.
What should I ask about the venue's rules?+
Ask for the height limit, whether rigging is permitted, the fire certification the organiser requires, and the date drawings must be submitted. Specific knowledge of one hall beats a claim to work in every city.
What if a vendor refuses to itemise the quote?+
Treat the refusal as the answer. Without line items you cannot compare two quotes, remove scope you do not need, or tell the difference between a cheaper vendor and a smaller scope.
How do I know if my stand is the right size?+
Ask the vendor what it can hold. At 36 sq.m the arithmetic gives about 28.8 sq.m of display, room for roughly 11 visitors at a time and 4 staff on duty. If your footfall expectation is far above that, the constraint is the stand rather than the campaign.
Should I ask about things that could go wrong?+
Yes, and the quality of the answer matters more than the content. A vendor who describes the slack in their schedule, the spares they carry and who they would call has thought about failure. One who says nothing has ever gone wrong has not.
Which question matters most?+
Who physically does the work. It decides who controls quality and who controls the date, and every other answer — pricing, drawings, site crew, backup plans — depends on it.
When should I ask about build-up?+
A week or two before the show, once production is finished. Ask for the arrival slot, the crew size, the shift hours and the hour the stand will be finished and cleaned — not the hour build-up closes.
Should the answers be in writing?+
Yes. Scope, inclusions, exclusions, drawing dates, milestones and the named site contact all belong in the quote or the contract. A verbal answer is a recollection, not a commitment.