India's largest stall fabrication network · 119 cities · 1,461 venues
AV & LED Wall Support Cost in India: 2026 Price Guide

Cost Guides

AV & LED Wall Support Cost in India: 2026 Price Guide

What AV & LED wall support really costs in India, what pushes the price up or down, and how to get an accurate, itemised quote.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

Rental by day; bundled with stall builds. What moves the number for AV & LED wall support is show duration and number of event days, equipment size and specification (screen size, projector brightness or drone count) and content creation and programming time — and what makes two numbers incomparable is scope that nobody wrote down. Send the show, the city, the dates, the area, the open sides and two reference images, and ask for the quote itemised line by line.

Key takeaways

  • Booking early and reusing elements lowers the cost per event more than negotiation does.
  • Every budget overrun has a date on it, and the date is always after design sign-off.
  • Rental by day; bundled with stall builds.
  • Before anything else, settle show duration and number of event days and equipment size and specification (screen size, projector brightness or drone count) — the rest of the quote follows from them.
  • Six ordinary substitutions explain 22% of the gap between two quotes for the same brief. Ask for the itemisation and the gap stops being a mystery.
  • Four lines are missing from most cheap quotes: the return journey, the crew, the dismantle, and the tax.

AV & LED wall support: the published ranges

LED video walls, displays, sound systems and technicians for stalls, stages and conferences.

Rental by day; bundled with stall builds. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.

Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.

One thing worth noticing about that band before we go further: ₹18,000 is exactly twice ₹9,000. A build budget therefore covers twice the area at the bottom of the band as at the top, and the single largest decision in an exhibition budget is which of those two stands you would rather have. There is no general answer. A product that has to be touched wants area; a brand that has to be believed wants finish.

Construction typeRelative costWhat you keep afterwards
Shell scheme upgradeLowestGraphics only
Octanorm / system buildLowFrame and graphics
Modular with custom graphicsMediumFrame, graphics, furniture
Custom wooden build₹9,000–₹18,000/sq.mLimited
Double-deckerQuoted per projectStructure, with engineering

Reuse is the column that decides cost over a year of shows, rather than cost at this one. Read it before the cost column if you exhibit more than twice.

What actually moves an AV & LED wall support price

A quote is not a number, it is a set of decisions you have already made without realising it. These are the variables doing the work, and each one is negotiable before the brief goes out and expensive afterwards.

Two numbers set the budget before anyone opens a sketchbook: how many square metres you booked and how many of its sides are open. An island stand is not a more expensive taste, it is four finished faces instead of one.

After area, the two variables with the most money in them are time and finish. Time, because a job booked inside the lead time is a job partly done at overtime rates: our own schedule needs 4 weeks for 36 sq.m, and compressing it does not remove work, it only moves it to a more expensive shift. Finish, because the difference between a good laminate and a veneer is invisible from the aisle and perfectly visible on the invoice.

  • Rigging, power backup and technician crew size
  • Permissions, venue rules and rehearsal time
  • Show duration and number of event days
  • Equipment size and specification (screen size, projector brightness or drone count)
  • Content creation and programming time
  • The finish on surfaces visitors can touch, as against the ones they cannot
  • Whether furniture is hired for the week or fabricated to keep
  • How much of the stand has to be new, and how much can come out of storage
  • The number of approval rounds before the drawing is frozen
Nothing in a stall budget is as expensive as a decision taken late.

What an AV & LED wall support quote should itemise

An itemised quote is not a courtesy, it is the only format in which a price can be checked. Each line is something you can question, reduce or delete; a single figure is something you can only accept or refuse.

The exclusions are more informative than the inclusions. Transport back from the venue, the crew who put it up, the dismantle inside the organiser's window, the electrical fittings and the tax: ask about those five by name, because a quote rarely mentions what it has left out.

Three small lines are worth more than their value on experience and AV work: material certification, the organiser submission, and a named project manager with a telephone number. Each is cheap to include and painful to arrange once the hall has opened its doors to build-up.

  • GST, shown as a figure rather than as a footnote
  • Pre-build or dry assembly at the workshop before dispatch
  • A named project manager, with a phone number, for the build-up days
  • Graphics proofing, and what happens if a panel has to be reprinted
  • Electrical fittings, the stand's own wiring, and the load being declared
  • Transport to the venue and the return leg, stated separately
  • Indoor P2.5–P3.9 LED walls
  • Touchscreens and kiosks
  • PA systems and mics
  • On-site AV technicians

What 36 sq.m actually costs, line by line

An example is worth more than a range. This one is 36 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.

The total is ₹6,73,000 — about ₹18,694 per sq.m once everything is counted. Most exhibitors are surprised by the shape rather than the size of it: the joinery everybody argues about is 48% of the figure, and ₹3,49,000 goes on graphics, light, floor, furniture, freight and crew.

Read it with two corrections in mind. First, the band: the structure here is at ₹9,000 per sq.m, and the same area at the top of the band is ₹6,48,000 instead of ₹3,24,000. Second, tax: everything above is pre-GST. Those two adjustments are the difference between a planning figure and a quote.

Worked example · Illustrative 36 sq.m custom build, costed line by line
Structure and joinery (36 sq.m × ₹9,000)₹3,24,000
Furniture — counters, seating, planters₹38,000
Graphics — brand wall, tensioned fabric and vinyl₹97,000
Lighting — track, aimed spots and backlit panels₹54,000
Raised flooring and carpet₹43,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative total, before GST₹6,73,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

The same money, spent two different ways

Because the top of the published band is twice the bottom, every build budget describes two possible stands: a larger one at a plain finish, or one of half the area at a premium one. The table below is that arithmetic at the sizes exhibitors actually book. The right-hand column is what the spread between the two ends of the band is actually spent on.

The arithmetic has a tidy consequence. ₹18,000 less ₹9,000 is ₹9,000, which is the lower figure, so the money that upgrades a stand from the bottom of the band to the top would instead have doubled its area. Whichever you pick, you are spending the same amount — which means the decision is about what the stand has to do, not about what it costs.

The honest rule is that area serves activity and finish serves belief. Demonstrations, queues, meetings and products that must be touched all need floor, and no amount of veneer compensates for a stand people cannot get into. A launch, a new category entry, or a brand that has to look established needs finish, and does better with a smaller, denser, well-lit stand than with a larger plain one.

Stall sizeBuild at ₹9,000/sq.mBuild at ₹18,000/sq.mWhat the difference buys
9 sq.m₹81,000₹1,62,000Better print, aimed light instead of clip lamps, and an edge finish that survives the week
18 sq.m₹1,62,000₹3,24,000A raised floor, aimed lighting and furniture you do not have to apologise for
36 sq.m₹3,24,000₹6,48,000Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner
54 sq.m₹4,86,000₹9,72,000Double-height brand elements, integrated AV and a storage wall that hides the cartons
100 sq.m₹9,00,000₹18,00,000All of the above, plus the engineering a raised or second-storey element needs

Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.

Why two quotes for one brief differ

Two quotes for one brief rarely differ because one vendor is greedy. They differ because the brief left a dozen decisions open and each vendor closed them differently — one in the direction of looking affordable, the other in the direction of looking thorough.

The arithmetic below is the whole phenomenon in one table. Take the 36 sq.m example and make six substitutions a vendor could defend in a meeting, and ₹6,73,000 becomes ₹5,23,000. The 22% difference — ₹1,50,000 — is entirely scope, and none of it is visible in a lump-sum comparison.

The remedy is unglamorous. Write the specification yourself — board, graphics medium, number of fixtures, flooring type, furniture list, crew and shift — and send the same page to everybody. The prices that come back will be close together, and you will be choosing a vendor rather than guessing at a scope.

Line that differsWhy the two figures are not the sameThe question that settles it
ElectricalThe organiser's power charge, the stand's own wiring, or neitherWho pays the organiser, and who wires the stand?
TransportOne leg, both legs, or quietly left outIs the return journey inside this figure?
Who builds itOne quote comes from the workshop; the other from somebody who will find oneWhose workshop is it, and may we see a build in progress?
TaxesOne total is before tax and the other after itGive me both the pre-tax and the post-tax figure
StructurePly and MDF to a finished edge in one quote, a lighter board with an exposed edge in the otherName the board, the thickness and the edge finish
FlooringA raised platform with cable management against carpet on the hall floorRaised or not, and where do the cables run?
FurnitureHired against fabricated, and a four-piece package against an eight-piece oneList the pieces, and say which are hired and which are built
RiskOne vendor has priced the unknowns; the other will raise them later as variationsWhat happens to this price if the drawing changes?

Every row is a question you can ask both vendors in the same email. The answers, side by side, usually explain the entire difference.

Worked example · The same 36 sq.m brief, quoted two ways
Carpet laid straight on the hall floor instead of a raised platform with cable management₹21,000
A four-piece hired furniture package instead of eight pieces₹12,000
Installation and dismantle left as "to be advised"₹31,000
Lighter board in the structure, with an exposed edge instead of a finished one₹42,000
Printed flex taped to panels instead of tensioned fabric on a frame₹26,000
Six aimed spots instead of fourteen, and no backlit panel₹18,000
Total difference between the two quotes₹1,50,000

Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

What is optional, and what only looks optional

Every quote contains lines you can delete and lines that merely look deletable. Telling them apart is the single most useful skill in exhibition procurement, because the second kind does not announce itself — it simply reappears later, larger, as a problem rather than as a line item.

One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.

Below: the real options as a list, then the false economies as a table. Read the list first if you are over budget, because the savings in it are larger and none of them will be visible from the aisle.

  • Backlighting on every panel, rather than on the one panel you want looked at
  • A ceiling or hanging element, unless the stand has to be found from across the hall
  • Giveaways in quantity, which measure footfall rather than interest
  • A second set of graphics for a message you have not tested on anybody yet
  • A model, a mock-up or a prop that duplicates something the product already demonstrates
  • A full-height closed meeting room on a small stand, where a screened corner does the same work
What exhibitors delete firstThe reasoning at the timeWhere it turns up again
Pre-build at the workshopThe crew can assemble it on siteSite is where there is no spare panel, no saw and no time. A dry run finds the problem while it is still cheap
One spare panel for the hero wallIt will be fineA scuffed hero panel is the one thing every photograph of the stand will show
Packing crates and transport coverIt travelled fine last timeOnce is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day
The cable and socket count on the drawingThat is site detailSite detail becomes a visible extension lead across the floor of a stand you paid to look expensive
Raised flooringCarpet on the hall floor costs lessThe cables then run under the carpet, and every visitor finds them with their feet
Dismantle and clearanceThe show is over by thenThe organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost

None of these are large figures in a quote. All of them are large figures once the hall is open, which is the entire point of the table.

A saving that has to be dealt with on site is not a saving. It is a deferral with a surcharge.

The price of a late decision

The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.

This is why the design stage deserves more of your time than it usually gets. 4 weeks is our schedule for 36 sq.m — 3 weeks base plus 1 for the area — and the hours you spend arguing about the layout in week one are the cheapest hours in the whole programme. A premium finish adds 2 weeks and a double-decker another 2, so the window is longer than most briefs assume and still not long enough for a change of mind in production.

Two habits keep this under control. Name one approver on your side, so that a change is a decision rather than a negotiation. And ask, before the first payment, how variations are priced and approved — in writing, with a figure confirmed before work starts, rather than appearing on a final invoice as a surprise.

StageThe price of changing your mindWhat has already happened
While the concept is being designedTime, and nothing elseNothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it
After design sign-off, before productionA redraw and a requoteDrawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you
After graphics go to printA full reprint of the affected panelLarge-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment
After dispatchFreight both ways, and a hole in the build scheduleThe panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you
Once the show has openedUsually nothing can be done at allThe hall is open and the stand is public. The only honest response is to write it down for the next edition

Read the first row twice. It is the only stage at which a change is free, and it is the stage exhibitors rush through fastest.

Exhibiting soon? Let's build your stall.

Or use the full form

If the total is fixed, start there

In practice the budget usually exists before the brief. That is not a problem; it is a better starting point, provided you do the subtraction first. The step that gets skipped is taking out the exhibiting costs that never appear on a stall quote at all, because those are the ones that arrive late and unbudgeted.

The allocation below is illustrative — a planning habit rather than a rule, and we have no source for a standard split. First, though, the list below: the exhibiting costs that never reach a stall quote at all. The allocation table after it is shown against ₹10,00,000 so the arithmetic is visible. Its important feature is the bottom two rows: ₹1,00,000 of ₹10,00,000 is money a stand builder never sees, and ₹50,000 of it is deliberately not allocated at briefing stage.

In this illustration the build line is ₹4,50,000: 50 sq.m of custom structure at ₹9,000 per sq.m, or 25 sq.m at ₹18,000. That single comparison — booked area against affordable area — settles the construction-type question before anybody draws anything, and it is a far less painful conversation to have at this stage than after a concept has been approved.

  • Promoters, hostesses or interpreters, if your visitors need them
  • Travel, hotels and local transport for everyone who will stand on the stand
  • Lead-capture devices, the data connection, and somewhere to charge them
  • Photography and video of the finished stand, which is the asset you use all year
  • Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
  • Space rental, invoiced to you by the organiser rather than by your stand builder
  • Storage of reusable elements between this edition and the next
  • Printed collateral, samples, and anything you intend to hand over
Budget lineIllustrative shareAt a total of ₹10,00,000
Stand build — structure, joinery and finish45%₹4,50,000
Graphics, lighting and AV20%₹2,00,000
Flooring and furniture10%₹1,00,000
Transport, installation and dismantle15%₹1,50,000
Your own show costs — travel, staffing, collateral, hospitality5%₹50,000
Contingency, held back rather than allocated at briefing5%₹50,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.

Size, space and what fits inside it

Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.

The visitors column is the one most exhibitors never calculate. Divide display area by 2.5 and you get roughly how many visitors can stand in the stand at once — which tells you whether your staffing plan and your footfall expectation are compatible.

Lead time belongs in a cost conversation because it is a cost. 3 weeks is the base, plus 1 week from 24 sq.m and 2 from 54 sq.m, with 2 more for a premium finish and 2 for a double-decker. Book inside those windows and the same stand costs more, because the work moves on to shifts that cost more.

Area bookedDisplayStorageStaffVisitors at onceLead time
18 sq.m15.3 sq.m1.8 sq.m263
24 sq.m19.2 sq.m3.6 sq.m374
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235
100 sq.m80 sq.m15 sq.m12325

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Milestones that correspond to something

Payment terms vary by vendor, by scope and by how long the two of you have worked together, and we are not going to invent a standard split — there is no honest source for one. What can be said without inventing anything is what each stage ought to correspond to, and that is the part worth negotiating.

One rule covers most of it: tie money to evidence. Drawings approved, materials bought, a pre-build you can inspect, a stand handed over complete — those are things you can see. Dates are not evidence of anything, because a date arrives whether or not the work did.

One more thing belongs in this conversation, because it is where disputes actually start: the variation process. Agree, before the first payment, who on your side approves a change, in what format, and whether its price is confirmed before the work begins. Unpriced variations are where almost every uncomfortable conversation about an exhibition invoice begins, and they are the one budget risk that is entirely administrative to remove.

  1. 01

    Keep the organiser's bills on a separate line

    Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.

  2. 02

    Keep something payable after handover

    Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.

  3. 03

    Get the tax position in writing

    Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.

  4. 04

    Confirm what the first payment actually unlocks

    Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.

  5. 05

    Ask for the schedule inside the quote

    Payment terms belong in the same document as the itemised scope, not in a separate message afterwards. If the stages and the deliverables are written on one page, you can see whether they line up — and if they do not, that is a conversation to have before you sign rather than in week three.

  6. 06

    Ask what happens if the show moves

    Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.

The invoice you argue about is almost always the one that followed a verbal agreement.

How the cost per show falls across a year

Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.

The second outing is costed in full in the example on this page. The structure, having been stored, does not reappear: what remains is a graphics reprint for the new message, refurbishment of what got marked, storage between the two shows, and the same transport and installation as before. That comes to ₹2,15,000 against the first show's ₹6,73,000 — 32% of it — because ₹4,58,000 of the first build is not bought a second time.

Extended to a third show in the table, the average per show becomes about ₹3,67,667, against ₹6,73,000 for the first outing alone: a 45% fall. No negotiation produces that. It comes entirely from a design decision taken before the first panel was cut, which is why it has to be asked for at briefing stage.

It depends on three things being true. A modular structure that comes apart without damage; graphics as a removable layer rather than as part of the wall; and storage, which costs money and is therefore a line in the example rather than an assumption. Miss any one and the second show is close to the price of the first.

EditionCost of this oneTotal so farAverage per show
Show 1 — the first build₹6,73,000₹6,73,000₹6,73,000
Show 2 — same structure, new graphics₹2,15,000₹8,88,000₹4,44,000
Show 3 — same structure, new graphics₹2,15,000₹11,03,000₹3,67,667

Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · What the second show carries, and what it does not
Graphics reprinted for the new show and the new message₹48,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹32,000
Storage of the structure between the two shows₹18,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative second-show total, before GST₹2,15,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

How to reduce cost without looking cheap

Put the money where a visitor's eye lands before they decide whether to walk in: the main graphic, the lighting on it, and whatever you most want them to look at. Everything behind that can be built to a budget without anybody noticing.

Reuse modular frames, graphics systems and furniture across shows, choose fabric graphics over rigid printed panels where the design allows, and bundle design, build and AV with one partner so you are not paying three margins and reconciling three schedules.

Cut structure before light. Visitors cannot admire quality they are standing in the shadow of, and lighting costs a fraction of the thing it makes visible.

The savings that work are the ones decided early. Booking inside the lead time, redesigning after sign-off and adding scope in production are not savings at all — they are the three most reliable ways to spend more than you planned. Every item in the list below has to be chosen before the brief is frozen to be worth anything.

  • Keep graphics on fabric, so the next edition is a reprint instead of a rebuild
  • Keep the footprint simple — every curve, angle and radius is another line on the cutting list
  • Print one hero graphic properly and keep everything around it plain
  • Book early: rush charges and night-shift labour are avoidable rather than inevitable
  • Hire the AV for the week instead of buying a screen you will then have to store
  • One strong message instead of five competing ones, which is cheaper and also works better
  • Build the storage wall out of the back of the display wall, so one structure does two jobs

The three expensive failures

The expensive failures on AV & LED wall support happen at quoting stage, not at the venue, which is why they are worth listing here rather than in a build guide. Start with the commonest: under-specified equipment that looks dull in a bright hall. The question that prevents it is what the quote actually specifies, and who is answerable for delivering it.

Next comes scope nobody wrote down — the single commonest cause of a quote that grows. Finish, fixture count, flooring type and furniture list: unnamed, each of them is an assumption, and the assumption will be resolved in the vendor's favour because you did not make it yourself.

And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.

  • No rehearsal or technical run before doors open
  • Missing backup power or spare units
  • Content not built for the actual screen or surface size
  • Under-specified equipment that looks dull in a bright hall

Get an accurate price

Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised AV & LED wall support quote within about two days.

What we do: free 3D design with every confirmed fabrication order, fabrication in our own workshops, organiser drawings and approvals handled, and a single project manager from brief to dismantle. Rental by day; bundled with stall builds.

Before you sign anything, get three answers in writing: what is itemised, what is excluded, and what happens to the price when the drawing changes. They take one email to request, and they are the difference between a quote and a guess.

Frequently asked questions

How far ahead should I book to avoid rush costs?+

Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.

Is GST included in AV & LED wall support quotes?+

A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 36 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹1,50,000, or 22% of ₹6,73,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

Does reusing a stand really lower the cost?+

Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹2,15,000 rather than ₹6,73,000 — 32% of the first show — because ₹4,58,000 of the first build is not bought again. Across three shows the average falls to about ₹3,67,667.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

When is payment due?+

Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.

Do you charge separately for design?+

3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.

How much does AV & LED wall support cost in India?+

Rental by day; bundled with stall builds. For a custom build, work from ₹9,000–₹18,000 per sq.m for the structure, and treat graphics, lighting, flooring, furniture, AV, transport, installation and taxes as separate lines rather than as details inside that figure.

Does a bigger stand cost proportionally more?+

The build line scales with area at the published band — 50 sq.m of structure at ₹9,000 per sq.m is ₹4,50,000, and the same money buys 25 sq.m at ₹18,000. The lines that do not scale in a straight line are transport, crew and supervision, so ask your builder which of your lines move with area and which are closer to fixed.

AV & LED Wall Support near you

Our crews deliver av & led wall support in every major Indian city.

Powered byIRPR