Corporate Event Management Cost in India: 2026 Price Guide

Cost Guides

Corporate Event Management Cost in India: 2026 Price Guide

A full cost breakdown for corporate event management in India — worked examples, the lines exhibitors forget, the price of changing your mind, and how reuse lowers the cost per show.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

Quoted per event; packages for recurring annual events. For corporate event management, total area and number of co-exhibitors, scope (design, build, AV, furniture, logistics, manpower, hospitality) and number of cities or shows in the programme do most of the work in the arithmetic. Decide those before you brief anyone, insist on an itemised quote, and compare like with like: the cheapest total is usually the one with the most left out.

Key takeaways

  • Transport, installation, dismantle and taxes are separate lines. Confirm they are in the figure you are comparing.
  • Reuse beats negotiation. A second outing with the same structure is 32% of the first show's figure, with nothing haggled.
  • Every budget overrun has a date on it, and the date is always after design sign-off.
  • Quoted per event; packages for recurring annual events.
  • The biggest cost drivers are total area and number of co-exhibitors and scope (design, build, AV, furniture, logistics, manpower, hospitality).
  • Always compare itemised quotes, not lump sums — the cheapest total is usually the one with the most left out.

Typical corporate event management price ranges

Corporate events that reflect your brand: annual conferences, dealer and channel meets, award nights, product launches, town halls and offsites, delivered to a run-of-show.

Quoted per event; packages for recurring annual events. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.

Custom fabrication is published at ₹9,000–₹18,000 per sq.m. Below that sit system builds, where the frame is reused instead of cut fresh, and below those an upgraded shell scheme. Read those as three different bargains rather than three qualities: you are trading how bespoke the stand looks against how much of it you still own after the show.

The band has an arithmetic shape worth seeing. Because ₹18,000 is twice ₹9,000, the same build money buys either a large plain stand or half the area beautifully finished. Exhibitors who have decided which of those they need brief quickly and buy well; exhibitors who have not spend the whole process trying to have both.

Construction typeRelative costReuseBest for
Shell scheme upgradeLowestGraphics only9–18 sq.m, first-time or budget exhibitors
Octanorm / system buildLowFrame and graphics9–36 sq.m, exhibitors doing several shows a year
Modular with custom graphicsMediumFrame, graphics, furniture18–54 sq.m, repeat exhibitors wanting a branded look
Custom wooden build₹9,000–₹18,000/sq.mLimitedAny size where the stand must look bespoke
Double-deckerQuoted per projectStructure, with engineering72 sq.m and above, when meetings would eat display space

Relative cost compares the build only. AV, furniture, flooring, transport, installation and taxes are quoted on their own lines in every case.

What actually moves a corporate event management price

Every corporate event management quote is built from the same handful of variables. Knowing them lets you control the budget before you brief anyone, and lets you tell the difference between a vendor who is cheaper and a vendor who has quoted less work.

Two numbers set the budget before anyone opens a sketchbook: how many square metres you booked and how many of its sides are open. An island stand is not a more expensive taste, it is four finished faces instead of one.

Two more variables carry most of the remaining money: how long you have given the job, and what the surfaces are made of. A 36 sq.m stand needs 4 weeks on our schedule; booked inside that, the same work happens at night-shift rates. And finish is where budgets quietly disappear, because the gap between a convincing laminate and a veneer costs real money and is invisible from two metres away.

  • Scope (design, build, AV, furniture, logistics, manpower, hospitality)
  • Number of cities or shows in the programme
  • Approval layers with organisers, embassies or departments
  • Total area and number of co-exhibitors
  • The finish on surfaces visitors can touch, as against the ones they cannot
  • Whether furniture is hired for the week or fabricated to keep
  • The number of approval rounds before the drawing is frozen
  • How far the workshop is from the venue, and whether a lorry can reach the hall door
You cannot compare two quotes until both describe the same stand.

The lines a quote has to name

An itemised quote is not a courtesy, it is the only format in which a price can be checked. Each line is something you can question, reduce or delete; a single figure is something you can only accept or refuse.

Ask specifically whether transport, installation, dismantle, electrical fittings and taxes are inside the figure. Those four lines are the ones most often excluded, and together they are not small.

There is a third group of lines, small in value and large in consequence: who certifies the materials, who prepares and submits the organiser drawings, and who answers the phone during build-up. Ask for those to be named rather than assumed, because on turnkey participations they are the lines that decide whether the rest of the quote gets delivered.

  • A named project manager, with a phone number, for the build-up days
  • Dismantle and clearing the stand inside the organiser's window
  • Transport to the venue and the return leg, stated separately
  • GST, shown as a figure rather than as a footnote
  • Storage of reusable elements after the show, and for how long
  • Dealer meets and sales conferences
  • Award nights and gala dinners
  • Town halls and leadership offsites
  • Registration, delegate and VIP management
  • Installation, the on-site crew, and who supervises them

A worked example: 36 sq.m custom stand

Here is how a mid-size custom build actually breaks down. The structure line uses the bottom of the published band — ₹9,000 per sq.m across 36 sq.m — and everything below it is a separate scope that a lump-sum quote would bury.

At ₹6,73,000 this stand works out at roughly ₹18,694 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹3,49,000, a little more than the fabrication itself.

Before you use that number, apply two adjustments. The structure is priced at the band's lower end, so a heavier finish specification pushes it toward ₹6,48,000 for the same 36 sq.m. And the total is before GST throughout. With both adjustments made, it is a sound planning figure for a mid-finish custom stand, and nothing more than that.

Worked example · 36 sq.m custom stand, three sides open
Structure and joinery (36 sq.m × ₹9,000)₹3,24,000
Graphics — brand wall, tensioned fabric and vinyl₹97,000
Lighting — track, aimed spots and backlit panels₹54,000
Raised flooring and carpet₹43,000
Furniture — counters, seating, planters₹38,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative total, before GST₹6,73,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

Area against finish: what the band actually means

The band is a range, not a price, and its two ends buy very different stands. At any given size, the lower figure is the plain version and the upper is the premium one — and because the upper is twice the lower, the premium version of a stand costs the same as the plain version of twice the area. Here is that worked out at common sizes.

Hold the two middle columns next to each other and the trade is exact: the difference between them, ₹9,000 per sq.m, is the same as the lower rate itself. Upgrade the finish or double the footprint — at the published band, those two cost the same. Few budget decisions are this clean, and almost nobody uses it.

The honest rule is that area serves activity and finish serves belief. Demonstrations, queues, meetings and products that must be touched all need floor, and no amount of veneer compensates for a stand people cannot get into. A launch, a new category entry, or a brand that has to look established needs finish, and does better with a smaller, denser, well-lit stand than with a larger plain one.

Stall sizeBuild at ₹9,000/sq.mBuild at ₹18,000/sq.mWhat the difference buys
12 sq.m₹1,08,000₹2,16,000A laminate that survives handling, a lighting track, and a counter that locks
24 sq.m₹2,16,000₹4,32,000A branded floor, a demo counter that actually works, and a spare hero panel
54 sq.m₹4,86,000₹9,72,000Double-height brand elements, integrated AV and a storage wall that hides the cartons
72 sq.m₹6,48,000₹12,96,000Architectural form — curves, a ceiling element, and a stand that reads as a building
100 sq.m₹9,00,000₹18,00,000All of the above, plus the engineering a raised or second-storey element needs

Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.

Where the difference between two prices lives

Two quotes for one brief rarely differ because one vendor is greedy. They differ because the brief left a dozen decisions open and each vendor closed them differently — one in the direction of looking affordable, the other in the direction of looking thorough.

Here is the gap itemised, on the same illustrative 36 sq.m stand. Six ordinary substitutions — none of them dishonest, all of them things a vendor might assume — take ₹6,73,000 down to ₹5,23,000. That is ₹1,50,000, or 22% of the total, without anybody quoting a different margin or a different standard of workmanship.

What follows from that is a procurement rule rather than a design one: write the scope down, in your own words, before you ask for prices. Name the board, the graphics medium, the fixture count, the flooring type, the furniture list and the crew. Then the quotes you get back are comparable, and the cheapest of them may genuinely be the right one.

Where quotes divergeWhat each vendor has assumedAsk this and the gap closes
LightingFourteen aimed fixtures against six, or against none at allHow many fixtures, of what type, aimed at what?
DismantleFrequently missing from the cheaper quote entirelyIs clearing the stand inside the organiser's window in this price?
Who builds itOne quote comes from the workshop; the other from somebody who will find oneWhose workshop is it, and may we see a build in progress?
FurnitureHired against fabricated, and a four-piece package against an eight-piece oneList the pieces, and say which are hired and which are built
FlooringA raised platform with cable management against carpet on the hall floorRaised or not, and where do the cables run?
StructurePly and MDF to a finished edge in one quote, a lighter board with an exposed edge in the otherName the board, the thickness and the edge finish
TaxesOne total is before tax and the other after itGive me both the pre-tax and the post-tax figure
InstallationA day crew against a night-shift crew, with or without supervisionHow many crew, on which shift, and who supervises them?

Work down the list before you negotiate. A gap explained is usually a gap you no longer want closed, because you now know which stand you are buying.

Worked example · The same 36 sq.m brief, quoted two ways
Carpet laid straight on the hall floor instead of a raised platform with cable management₹21,000
A four-piece hired furniture package instead of eight pieces₹12,000
Installation and dismantle left as "to be advised"₹31,000
Lighter board in the structure, with an exposed edge instead of a finished one₹42,000
Printed flex taped to panels instead of tensioned fabric on a frame₹26,000
Six aimed spots instead of fourteen, and no backlit panel₹18,000
Total difference between the two quotes₹1,50,000

Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

Where to cut, and where cutting costs more

There are two kinds of saving in a stall quote. One kind removes something nobody was going to look at. The other removes something that then has to be dealt with on site, at site prices, by people with the wrong tools. The lines look identical on paper.

One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.

The list immediately below is the first kind: real options, which can go without anybody noticing. The table after it is the second kind — lines that look like fat and are not, with what actually happens when each one is cut. Start with the list, because the genuinely optional items on a corporate event management quote are usually larger than the false economies and far less painful to remove.

  • A second set of graphics for a message you have not tested on anybody yet
  • Fabricated furniture, where hired furniture would have been collected afterwards anyway
  • Giveaways in quantity, which measure footfall rather than interest
  • Veneer or PU paint where a good laminate reads identically from the aisle
  • Working shutters and locks on storage that nobody will see
  • A second screen that repeats what the first screen is already showing
What exhibitors delete firstThe reasoning at the timeWhere it turns up again
Pre-build at the workshopThe crew can assemble it on siteSite is where there is no spare panel, no saw and no time. A dry run finds the problem while it is still cheap
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost
The power load calculationThe organiser supplies powerThe organiser supplies the load you declared. A screen added after the declaration is a screen without power
Packing crates and transport coverIt travelled fine last timeOnce is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day
A graphics proofing roundThe artwork is finalLarge-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall
A single project managerEach vendor manages themselvesThen every gap between vendors is yours to discover, usually at eight o'clock on the first morning
Dismantle and clearanceThe show is over by thenThe organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards

If the budget genuinely will not stretch, cut from the list below this table instead. These lines are the ones that cost more when they are missing.

A saving that has to be dealt with on site is not a saving. It is a deferral with a surcharge.

What changing your mind costs, stage by stage

Changes are where budgets actually overrun, and they do not appear on any quote. What makes them expensive is timing rather than magnitude: moving an entrance is a conversation at concept stage, a redraw after sign-off, a rebuild in production, and an improvisation at the venue.

This is why the design stage deserves more of your time than it usually gets. 4 weeks is our schedule for 36 sq.m — 3 weeks base plus 1 for the area — and the hours you spend arguing about the layout in week one are the cheapest hours in the whole programme. A premium finish adds 2 weeks and a double-decker another 2, so the window is longer than most briefs assume and still not long enough for a change of mind in production.

There are two defences, and both are administrative. One approver on your side, with the authority to sign the drawing and the finish schedule. And an agreed variation process: who asks, who approves, and whether the price is confirmed before the work happens. Both cost nothing and both prevent the expensive version of this table.

When the change comesWhat it costsWhy
While the concept is being designedTime, and nothing elseNothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it
After materials are orderedThe material, plus its replacementBoard, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts
In productionThe labour already spent, plus the labour to redo itA fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved
After dispatchFreight both ways, and a hole in the build scheduleThe panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you
Once the show has openedUsually nothing can be done at allThe hall is open and the stand is public. The only honest response is to write it down for the next edition

Read the first row twice. It is the only stage at which a change is free, and it is the stage exhibitors rush through fastest.

Exhibiting soon? Let's build your stall.

Or use the full form

Working back from the number you have

If the total is already fixed, plan from the total. It works better than designing first and pricing afterwards, and it forces the one calculation most exhibitors postpone: how much of this money is never going to reach the stand, because it belongs to the organiser, the airline, the hotel and the print shop.

After the list of costs that never reach a stall quote comes a worked allocation of ₹10,00,000, offered as an illustration rather than as a standard, because no standard exists that we could honestly cite. Read it from the bottom: ₹50,000 unallocated, ₹1,00,000 of costs no stand quote will carry, and ₹9,00,000 — 90% — left for the stand itself.

The build line comes to ₹4,50,000, which buys 50 sq.m of structure at the bottom of the published band and 25 sq.m at the top. Hold that against the stall you have booked. If the booked area is larger than 50 sq.m, the arithmetic is telling you to use a system build rather than a custom one, and it is telling you now rather than in week three.

  • Storage of reusable elements between this edition and the next
  • Travel, hotels and local transport for everyone who will stand on the stand
  • The organiser's power connection, charged against the load you declare
  • Promoters, hostesses or interpreters, if your visitors need them
  • Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
  • Product freight — the goods on display travel separately from the stand that holds them
  • Space rental, invoiced to you by the organiser rather than by your stand builder
  • Photography and video of the finished stand, which is the asset you use all year
Where the money goesShare of the budgetAgainst ₹10,00,000
Stand build — structure, joinery and finish45%₹4,50,000
Graphics, lighting and AV20%₹2,00,000
Flooring and furniture10%₹1,00,000
Transport, installation and dismantle15%₹1,50,000
Your own show costs — travel, staffing, collateral, hospitality5%₹50,000
Contingency, held back rather than allocated at briefing5%₹50,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.

Size, space and what fits inside it

Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.

The visitors column is the one most exhibitors never calculate. Divide display area by 2.5 and you get roughly how many visitors can stand in the stand at once — which tells you whether your staffing plan and your footfall expectation are compatible.

Treat the weeks column as money. 3 weeks base, one more from 24 sq.m, 2 more from 54 sq.m, 2 more for a premium finish, 2 more for a second storey. Every week you take off the front of that schedule is bought back later at a worse rate, which is why late booking is a price decision rather than a planning one.

Area bookedDisplayStorageStaffVisitors at onceLead time
9 sq.m7.6 sq.m0.9 sq.m233
12 sq.m10.2 sq.m1.2 sq.m243
24 sq.m19.2 sq.m3.6 sq.m374
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Milestones that correspond to something

Payment terms vary by vendor, by scope and by how long the two of you have worked together, and we are not going to invent a standard split — there is no honest source for one. What can be said without inventing anything is what each stage ought to correspond to, and that is the part worth negotiating.

One rule covers most of it: tie money to evidence. Drawings approved, materials bought, a pre-build you can inspect, a stand handed over complete — those are things you can see. Dates are not evidence of anything, because a date arrives whether or not the work did.

Settle one more thing while you are settling the schedule: variations. A named approver, a written format, and a price confirmed before the work happens. On turnkey participations the most common budget complaint is not the quote — it is the half-dozen small changes that were agreed verbally and priced afterwards.

  1. 01

    Ask for the schedule inside the quote

    Payment terms belong in the same document as the itemised scope, not in a separate message afterwards. If the stages and the deliverables are written on one page, you can see whether they line up — and if they do not, that is a conversation to have before you sign rather than in week three.

  2. 02

    Ask what happens if the show moves

    Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.

  3. 03

    Keep something payable after handover

    Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.

  4. 04

    Confirm what the first payment actually unlocks

    Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.

  5. 05

    Get the tax position in writing

    Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.

  6. 06

    Tie every stage to something you can see

    A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.

A milestone with no deliverable attached is a date, and a date is not a milestone.

How the cost per show falls across a year

Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.

Costed properly — see the example — the second show has no structure line, a graphics reprint, a refurbishment allowance, storage between editions, and transport and installation as before. The total is ₹2,15,000 — 32% of the ₹6,73,000 first show — because ₹4,58,000 of that first figure was a one-time purchase.

Extended to a third show in the table, the average per show becomes about ₹3,67,667, against ₹6,73,000 for the first outing alone: a 45% fall. No negotiation produces that. It comes entirely from a design decision taken before the first panel was cut, which is why it has to be asked for at briefing stage.

Three conditions have to hold, and they are all specification rather than luck. The structure has to be modular, dismantled in panels rather than broken down. The graphics have to be a separate layer — fabric on a frame, reprinted rather than rebuilt. And somewhere has to store it, which is a real cost and appears as a line in the example rather than being quietly ignored.

OutingThis editionSpent to dateRunning average
Show 1 — the first build₹6,73,000₹6,73,000₹6,73,000
Show 2 — same structure, new graphics₹2,15,000₹8,88,000₹4,44,000
Show 3 — same structure, new graphics₹2,15,000₹11,03,000₹3,67,667

Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · What the second show carries, and what it does not
Graphics reprinted for the new show and the new message₹48,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹32,000
Storage of the structure between the two shows₹18,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative second-show total, before GST₹2,15,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

Where to save, and where the saving shows

Put the money where a visitor's eye lands before they decide whether to walk in: the main graphic, the lighting on it, and whatever you most want them to look at. Everything behind that can be built to a budget without anybody noticing.

The structural saving is reuse: a modular frame with reprintable graphics turns the second show into a fraction of the first. Beyond that, hire the furniture, print on fabric rather than rigid board, and buy the whole scope from one place instead of paying three separate margins.

Cut structure before light. Visitors cannot admire quality they are standing in the shadow of, and lighting costs a fraction of the thing it makes visible.

One qualification on the whole list: timing. Each of these is a genuine saving if it is decided before the brief is frozen and an expensive change if it is decided afterwards. Hiring furniture is cheaper than building it; deciding to hire it after it has been built is not.

  • Hire furniture and planters rather than fabricating them for a week
  • Keep the footprint simple — every curve, angle and radius is another line on the cutting list
  • Print one hero graphic properly and keep everything around it plain
  • Build the storage wall out of the back of the display wall, so one structure does two jobs
  • Keep graphics on fabric, so the next edition is a reprint instead of a rebuild
  • One strong message instead of five competing ones, which is cheaper and also works better
  • Reuse a modular structure across several shows — the second outing costs a fraction of the first

Where quotes go wrong

Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: too many vendors with no single point of accountability. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.

Next comes scope nobody wrote down — the single commonest cause of a quote that grows. Finish, fixture count, flooring type and furniture list: unnamed, each of them is an assumption, and the assumption will be resolved in the vendor's favour because you did not make it yourself.

The last of the three is subtler. The quote was right; the job changed. Half a dozen small additions after sign-off, none of them priced at the time, and the final figure is not the one anybody approved — which is an argument for agreeing the variation process at the same moment as the price.

  • Delayed approvals that compress build-up time
  • Too many vendors with no single point of accountability
  • Inconsistent branding across co-exhibitor booths
  • Budget overruns from scope that was never itemised

Get an accurate price

Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised corporate event management quote within about two days.

What we do: free 3D design with every confirmed fabrication order, fabrication in our own workshops, organiser drawings and approvals handled, and a single project manager from brief to dismantle. Quoted per event; packages for recurring annual events.

Before you sign anything, get three answers in writing: what is itemised, what is excluded, and what happens to the price when the drawing changes. They take one email to request, and they are the difference between a quote and a guess.

Frequently asked questions

What is never included in a stall quote?+

Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,00,000 of ₹10,00,000 — small enough to forget and large enough to hurt.

Do you charge separately for design?+

3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.

Is the cheapest quote ever the right one?+

Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.

When is payment due?+

Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

Does a bigger stand cost proportionally more?+

The build line scales with area at the published band — 50 sq.m of structure at ₹9,000 per sq.m is ₹4,50,000, and the same money buys 25 sq.m at ₹18,000. The lines that do not scale in a straight line are transport, crew and supervision, so ask your builder which of your lines move with area and which are closer to fixed.

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 36 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹1,50,000, or 22% of ₹6,73,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

How much does corporate event management cost in India?+

Quoted per event; packages for recurring annual events. For a custom build, work from ₹9,000–₹18,000 per sq.m for the structure, and treat graphics, lighting, flooring, furniture, AV, transport, installation and taxes as separate lines rather than as details inside that figure.

How can I lower the cost without the stand looking cheap?+

Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.