By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read
Short answer
Quoted per production; agency rates available. What moves the number for event production company is show duration and number of event days, equipment size and specification (screen size, projector brightness or drone count) and content creation and programming time — and what makes two numbers incomparable is scope that nobody wrote down. Send the show, the city, the dates, the area, the open sides and two reference images, and ask for the quote itemised line by line.
Key takeaways
- Booking early and reusing elements lowers the cost per event more than negotiation does.
- Spend longer at concept stage than feels comfortable. It is the only point at which a change costs nothing but time.
- Quoted per production; agency rates available.
- The biggest cost drivers are show duration and number of event days and equipment size and specification (screen size, projector brightness or drone count).
- Always compare itemised quotes, not lump sums — the cheapest total is usually the one with the most left out.
- Transport, installation, dismantle and taxes are separate lines. Confirm they are in the figure you are comparing.
What event production company costs in India
Technical event production for agencies and brands: set design and fabrication, LED walls, sound, lighting, rigging, projection and show-control crews.
Quoted per production; agency rates available. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.
Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.
One thing worth noticing about that band before we go further: ₹18,000 is exactly twice ₹9,000. A build budget therefore covers twice the area at the bottom of the band as at the top, and the single largest decision in an exhibition budget is which of those two stands you would rather have. There is no general answer. A product that has to be touched wants area; a brand that has to be believed wants finish.
| Construction type | Where it sits on cost | What you still own afterwards | Typical fit |
|---|---|---|---|
| Shell scheme upgrade | Lowest | Graphics only | 9–18 sq.m, first-time or budget exhibitors |
| Octanorm / system build | Low | Frame and graphics | 9–36 sq.m, exhibitors doing several shows a year |
| Modular with custom graphics | Medium | Frame, graphics, furniture | 18–54 sq.m, repeat exhibitors wanting a branded look |
| Custom wooden build | ₹9,000–₹18,000/sq.m | Limited | Any size where the stand must look bespoke |
| Double-decker | Quoted per project | Structure, with engineering | 72 sq.m and above, when meetings would eat display space |
Only the custom band is a published per-sq.m rate. The others are positions relative to it, because what they cost depends on how much of the frame already exists.
What actually moves an event production company price
Every event production company quote is built from the same handful of variables. Knowing them lets you control the budget before you brief anyone, and lets you tell the difference between a vendor who is cheaper and a vendor who has quoted less work.
Two numbers set the budget before anyone opens a sketchbook: how many square metres you booked and how many of its sides are open. An island stand is not a more expensive taste, it is four finished faces instead of one.
Then there is the pair nobody prices at briefing stage: lead time and finish level. 3 weeks is the schedule for 18 sq.m — take that away and you have not saved anything, you have bought the same work on an overtime shift. Finish is the other one: specify veneer where laminate would read identically from the aisle and you have spent the lighting budget on something visitors cannot see.
- Equipment size and specification (screen size, projector brightness or drone count)
- Content creation and programming time
- Rigging, power backup and technician crew size
- Permissions, venue rules and rehearsal time
- Show duration and number of event days
- The number of open sides, which decides how many faces have to be finished
- Whether the build-up window runs in daytime hours or forces a night shift
- The number of approval rounds before the drawing is frozen
- The finish on surfaces visitors can touch, as against the ones they cannot
You cannot compare two quotes until both describe the same stand.
Reading an event production company quote properly
An itemised quote is not a courtesy, it is the only format in which a price can be checked. Each line is something you can question, reduce or delete; a single figure is something you can only accept or refuse.
Four lines go missing more often than the rest: the return journey, the on-site crew, the dismantle, and the tax. On this page's illustrative 18 sq.m figures, transport and installation alone are ₹78,000 — which is what a quote without them is quietly saving.
For experience and AV work there are a few lines beyond the obvious ones that belong on the page: the certification the venue will ask for, the drawings the organiser will ask for, and the person whose phone you will be ringing at seven in the morning on build-up day. None of those are large figures. All of them are expensive to arrange late.
- GST, shown as a figure rather than as a footnote
- Fire-retardant certification for the materials being used
- Pre-build or dry assembly at the workshop before dispatch
- Set design and fabrication
- LED walls, sound and lighting
- Truss, rigging and load checks
- Technical director and show crew
- A named project manager, with a phone number, for the build-up days
- Transport to the venue and the return leg, stated separately
- Storage of reusable elements after the show, and for how long
Eighteen square metres, costed properly
An example is worth more than a range. This one is 18 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.
₹3,80,000 across 18 sq.m is about ₹21,111 per sq.m all-in, and that all-in figure is the one to compare, because it is the only one both vendors have to answer for. The split is the interesting part: fabrication is 43% of the total and everything else is the other 57%, or ₹2,18,000.
Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 18 sq.m of structure is ₹3,24,000 rather than ₹1,62,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.
| Structure and joinery (18 sq.m × ₹9,000) | ₹1,62,000 |
|---|---|
| Graphics — brand wall, tensioned fabric and vinyl | ₹56,000 |
| Lighting — track, aimed spots and backlit panels | ₹34,000 |
| Raised flooring and carpet | ₹26,000 |
| Furniture — counters, seating, planters | ₹24,000 |
| Transport, both ways | ₹34,000 |
| Installation, crew and dismantle | ₹44,000 |
| Indicative total, before GST | ₹3,80,000 |
Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.
What the same budget buys at different sizes
This is the comparison most briefs skip. At every size, the band gives you a lower figure and an upper one, and the gap between them is not padding: it is finish, light, floor and detail. The last column names what it buys, so you can decide whether you want it more than you want the extra square metres.
Notice the symmetry in the middle two columns: the spread at any size is the lower figure again, because ₹18,000 minus ₹9,000 is ₹9,000. So the question "should I take more area or better finish?" is, at the published band, an exactly even trade. That is unusually clean, and it makes the decision a strategic one rather than an arithmetical one.
Choose by the job, not the taste. Anything involving queuing, demonstrating, handling or sitting down is an argument for area, because the premium finish on a stand nobody can enter is money spent on photographs. Anything involving persuasion rather than throughput is an argument for finish — and in that case a smaller stand, properly lit, beats a larger one that looks provisional.
| Stall size | Build at ₹9,000/sq.m | Build at ₹18,000/sq.m | What the difference buys |
|---|---|---|---|
| 12 sq.m | ₹1,08,000 | ₹2,16,000 | A laminate that survives handling, a lighting track, and a counter that locks |
| 18 sq.m | ₹1,62,000 | ₹3,24,000 | A raised floor, aimed lighting and furniture you do not have to apologise for |
| 24 sq.m | ₹2,16,000 | ₹4,32,000 | A branded floor, a demo counter that actually works, and a spare hero panel |
| 54 sq.m | ₹4,86,000 | ₹9,72,000 | Double-height brand elements, integrated AV and a storage wall that hides the cartons |
| 100 sq.m | ₹9,00,000 | ₹18,00,000 | All of the above, plus the engineering a raised or second-storey element needs |
Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.
Reading the gap between two quotes
When two prices for the same stand are far apart, the instinct is to suspect the higher one. Usually both are honest and the brief was not specific: every unspecified detail is a decision the vendor makes for you, and the cheaper quote is simply the one that made the cheaper decisions.
The arithmetic below is the whole phenomenon in one table. Take the 18 sq.m example and make six substitutions a vendor could defend in a meeting, and ₹3,80,000 becomes ₹2,87,000. The 24% difference — ₹93,000 — is entirely scope, and none of it is visible in a lump-sum comparison.
So the fix sits with the buyer. Specify the things above in writing before you circulate the enquiry, and the spread between quotes collapses to something like the real difference between the vendors. Skip it, and you are not comparing prices at all — you are comparing assumptions.
| Line | The two readings of your brief | What to put in writing |
|---|---|---|
| Transport | One leg, both legs, or quietly left out | Is the return journey inside this figure? |
| Taxes | One total is before tax and the other after it | Give me both the pre-tax and the post-tax figure |
| Flooring | A raised platform with cable management against carpet on the hall floor | Raised or not, and where do the cables run? |
| Installation | A day crew against a night-shift crew, with or without supervision | How many crew, on which shift, and who supervises them? |
| Drawings and approvals | One vendor is preparing the organiser submission; the other expects you to | Who prepares the drawings, and who submits them? |
| Electrical | The organiser's power charge, the stand's own wiring, or neither | Who pays the organiser, and who wires the stand? |
| Graphics | Tensioned fabric on a frame against printed flex taped to a panel | What is it printed on, and how is it fixed to the wall? |
| Lighting | Fourteen aimed fixtures against six, or against none at all | How many fixtures, of what type, aimed at what? |
Every row is a question you can ask both vendors in the same email. The answers, side by side, usually explain the entire difference.
| Six aimed spots instead of fourteen, and no backlit panel | ₹11,000 |
|---|---|
| Carpet laid straight on the hall floor instead of a raised platform with cable management | ₹13,000 |
| A four-piece hired furniture package instead of eight pieces | ₹8,000 |
| Installation and dismantle left as "to be advised" | ₹21,000 |
| Lighter board in the structure, with an exposed edge instead of a finished one | ₹24,000 |
| Printed flex taped to panels instead of tensioned fabric on a frame | ₹16,000 |
| Total difference between the two quotes | ₹93,000 |
Illustrative, built by making six substitutions to the 18 sq.m example above. The higher quote is ₹3,80,000 and the lower is ₹2,87,000; the difference is ₹93,000, 24% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.
The false economies, and the real ones
Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.
One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.
Both halves of the distinction follow. First the lines that genuinely are optional — and these are usually the bigger numbers, which is the happy part of this section. Then, in the table, the ones that only look optional, each with its consequence spelled out.
- A second set of graphics for a message you have not tested on anybody yet
- A full-height closed meeting room on a small stand, where a screened corner does the same work
- Working shutters and locks on storage that nobody will see
- A printed floor, when plain carpet in the brand colour does the same job
- Backlighting on every panel, rather than on the one panel you want looked at
- A second screen that repeats what the first screen is already showing
| Line item | Why it reads as padding | The consequence |
|---|---|---|
| Packing crates and transport cover | It travelled fine last time | Once is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day |
| The power load calculation | The organiser supplies power | The organiser supplies the load you declared. A screen added after the declaration is a screen without power |
| Lighting beyond what the hall gives you | The hall is already lit | Hall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost |
| Storage between shows | We will decide after this one | "After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable |
| A graphics proofing round | The artwork is final | Large-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall |
| A single project manager | Each vendor manages themselves | Then every gap between vendors is yours to discover, usually at eight o'clock on the first morning |
| Fire-retardant certified material | Nobody asks to see the certificate | The venue safety officer asks, and an uncertified panel is refused at the hall door on the first morning |
The common thread is that each one is cheap in a workshop and expensive at a venue. Timing, not quality, is what makes them worth keeping.
Delete what nobody will look at. Keep what everybody will walk on, touch, or need power from.
The price of a late decision
Changes are where budgets actually overrun, and they do not appear on any quote. What makes them expensive is timing rather than magnitude: moving an entrance is a conversation at concept stage, a redraw after sign-off, a rebuild in production, and an improvisation at the venue.
The practical consequence is to front-load the arguing. With 3 weeks on the schedule for 18 sq.m, every disagreement settled before sign-off is free and every one settled afterwards has a price. Add 2 weeks for a premium finish or 2 for a double-decker element, and the calendar is still unforgiving once production has started.
Two habits keep this under control. Name one approver on your side, so that a change is a decision rather than a negotiation. And ask, before the first payment, how variations are priced and approved — in writing, with a figure confirmed before work starts, rather than appearing on a final invoice as a surprise.
| When the change comes | What it costs | Why |
|---|---|---|
| While the concept is being designed | Time, and nothing else | Nothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it |
| After design sign-off, before production | A redraw and a requote | Drawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you |
| After materials are ordered | The material, plus its replacement | Board, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts |
| After graphics go to print | A full reprint of the affected panel | Large-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment |
| After dispatch | Freight both ways, and a hole in the build schedule | The panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience |
| During build-up | Night-shift labour, and whatever can be improvised | There is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you |
Nothing in this table is a penalty. Each row is simply work that has to be done twice, plus whatever the first attempt cost in material.
Exhibiting soon? Let's build your stall.
Planning a budget backwards from a total
Most exhibitors do not start with a design, they start with a number. Working backwards from that number is a more reliable method than briefing a design and discovering afterwards what it costs — and it has one step that nearly everybody misses, which is subtracting the costs that no stand builder will ever quote you.
The allocation below is illustrative — a planning habit rather than a rule, and we have no source for a standard split. First, though, the list below: the exhibiting costs that never reach a stall quote at all. The allocation table after it is shown against ₹6,00,000 so the arithmetic is visible. Its important feature is the bottom two rows: ₹60,000 of ₹6,00,000 is money a stand builder never sees, and ₹30,000 of it is deliberately not allocated at briefing stage.
The build line comes to ₹2,70,000, which buys 30 sq.m of structure at the bottom of the published band and 15 sq.m at the top. Hold that against the stall you have booked. If the booked area is larger than 30 sq.m, the arithmetic is telling you to use a system build rather than a custom one, and it is telling you now rather than in week three.
- Promoters, hostesses or interpreters, if your visitors need them
- The organiser's power connection, charged against the load you declare
- Storage of reusable elements between this edition and the next
- Printed collateral, samples, and anything you intend to hand over
- Insurance on goods in transit and on the stand itself
- Lead-capture devices, the data connection, and somewhere to charge them
- Space rental, invoiced to you by the organiser rather than by your stand builder
- Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
| Budget line | Illustrative share | At a total of ₹6,00,000 |
|---|---|---|
| Stand build — structure, joinery and finish | 45% | ₹2,70,000 |
| Graphics, lighting and AV | 20% | ₹1,20,000 |
| Flooring and furniture | 10% | ₹60,000 |
| Transport, installation and dismantle | 15% | ₹90,000 |
| Your own show costs — travel, staffing, collateral, hospitality | 5% | ₹30,000 |
| Contingency, held back rather than allocated at briefing | 5% | ₹30,000 |
Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹6,00,000. The first four rows, ₹5,40,000, are what a stand builder quotes against. GST sits on top.
What the area actually gives you
Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.
Read the visitor column as a constraint rather than as information. It is display area divided by 2.5, and if your footfall expectation implies more people in the stand at once than that, the thing standing in the way is the floor plan, not the campaign.
The build-weeks column is a budget column in disguise. Our schedule is 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for a premium finish and +2 for a double-decker. Compressing it does not reduce the work; it relocates the work to night shifts and rush rates.
| Area booked | Display | Storage | Staff | Visitors at once | Lead time |
|---|---|---|---|---|---|
| 9 sq.m | 7.6 sq.m | 0.9 sq.m | 2 | 3 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
| 100 sq.m | 80 sq.m | 15 sq.m | 12 | 32 | 5 |
Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.
Milestones that correspond to something
Payment terms vary by vendor, by scope and by how long the two of you have worked together, and we are not going to invent a standard split — there is no honest source for one. What can be said without inventing anything is what each stage ought to correspond to, and that is the part worth negotiating.
One rule covers most of it: tie money to evidence. Drawings approved, materials bought, a pre-build you can inspect, a stand handed over complete — those are things you can see. Dates are not evidence of anything, because a date arrives whether or not the work did.
The item to settle alongside the schedule is how changes get priced. Who approves them on your side, in what format, and is the figure confirmed before work starts? Nearly every uncomfortable conversation about an exhibition invoice began as a change that nobody priced at the moment it was agreed.
01
Keep something payable after handover
Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.
02
Tie every stage to something you can see
A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.
03
Get the tax position in writing
Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.
04
Name one approver on your side
One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.
05
Ask for the schedule inside the quote
Payment terms belong in the same document as the itemised scope, not in a separate message afterwards. If the stages and the deliverables are written on one page, you can see whether they line up — and if they do not, that is a conversation to have before you sign rather than in week three.
06
Keep the organiser's bills on a separate line
Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.
The invoice you argue about is almost always the one that followed a verbal agreement.
Reuse arithmetic: the second show is the cheap one
The arithmetic changes completely once you exhibit twice. Costing a stand against one show, when it will stand at three, overstates it by a wide margin; but it only overstates it if the stand was built to be reused, which is a decision made at design stage and cannot be made afterwards.
The second outing is costed in full in the example on this page. The structure, having been stored, does not reappear: what remains is a graphics reprint for the new message, refurbishment of what got marked, storage between the two shows, and the same transport and installation as before. That comes to ₹1,36,000 against the first show's ₹3,80,000 — 36% of it — because ₹2,44,000 of the first build is not bought a second time.
The table follows it across three shows, and the average per show falls from ₹3,80,000 to ₹2,58,000 and then to about ₹2,17,333 — a fall of 43% against the first outing, with nothing negotiated and no corner cut. That is the strongest cost lever in exhibiting, and it is available only to exhibitors who asked for it before the first stand was built.
Three conditions have to hold, and they are all specification rather than luck. The structure has to be modular, dismantled in panels rather than broken down. The graphics have to be a separate layer — fabric on a frame, reprinted rather than rebuilt. And somewhere has to store it, which is a real cost and appears as a line in the example rather than being quietly ignored.
| Outing | This edition | Spent to date | Running average |
|---|---|---|---|
| Show 1 — the first build | ₹3,80,000 | ₹3,80,000 | ₹3,80,000 |
| Show 2 — same structure, new graphics | ₹1,36,000 | ₹5,16,000 | ₹2,58,000 |
| Show 3 — same structure, new graphics | ₹1,36,000 | ₹6,52,000 | ₹2,17,333 |
Illustrative, built from the two worked examples on this page: ₹3,80,000 for the first build and ₹1,36,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.
| Graphics reprinted for the new show and the new message | ₹28,000 |
|---|---|
| Refurbishment — replaced panels, touch-up paint, relaminating what is marked | ₹18,000 |
| Storage of the structure between the two shows | ₹12,000 |
| Transport, both ways | ₹34,000 |
| Installation, crew and dismantle | ₹44,000 |
| Indicative second-show total, before GST | ₹1,36,000 |
Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹3,80,000, this is 36%, so ₹2,44,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.
How to reduce cost without looking cheap
Put the money where a visitor's eye lands before they decide whether to walk in: the main graphic, the lighting on it, and whatever you most want them to look at. Everything behind that can be built to a budget without anybody noticing.
Three habits cut more than any negotiation does — reuse the frame, hire rather than build the furniture, and keep graphics on fabric so next year's edition costs a reprint instead of a rebuild.
Protect the lighting line. The hall lights the aisles, not your stand, and an under-lit stand looks cheap however much the joinery cost — it is the smallest line with the largest visible return.
Read the list with the calendar in mind. These are savings at briefing stage and costs at any stage after it — a reprint instead of a rebuild saves money only if the design anticipated it, and a simpler footprint saves money only if the cutting list has not been written yet.
- Keep the footprint simple — every curve, angle and radius is another line on the cutting list
- Freeze the layout once and leave it frozen, because the expensive version of every saving is a change
- Build the storage wall out of the back of the display wall, so one structure does two jobs
- Choose a laminate that reads like veneer from a metre away, and spend the difference on light
- Reuse a modular structure across several shows — the second outing costs a fraction of the first
- Upgrade a shell scheme instead of building raw space, for stalls under 18 sq.m
- Print one hero graphic properly and keep everything around it plain
What goes wrong with event production company quotes
Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: under-specified equipment that looks dull in a bright hall. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.
Next comes scope nobody wrote down — the single commonest cause of a quote that grows. Finish, fixture count, flooring type and furniture list: unnamed, each of them is an assumption, and the assumption will be resolved in the vendor's favour because you did not make it yourself.
And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.
- Missing backup power or spare units
- Content not built for the actual screen or surface size
- Under-specified equipment that looks dull in a bright hall
- No rehearsal or technical run before doors open
How to get a real figure
Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised event production company quote within about two days.
We design free with every confirmed fabrication order, fabricate in our own workshops, prepare the organiser drawings and approvals, and put one project manager on the job from brief to dismantle. Quoted per production; agency rates available.
One closing piece of advice that applies to every vendor including us. Ask for the itemised scope, ask explicitly what is excluded, and ask how variations are priced. A supplier who answers all three without hesitation is telling you something useful about how the build will go.
Frequently asked questions
Do you charge separately for design?+
3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.
How much contingency should I hold back?+
Enough to absorb one change you have not thought of yet. The illustrative allocation on this page holds back ₹30,000 of ₹6,00,000, which is a planning habit rather than a published rule — set your own figure, but set it before briefing, because a contingency invented afterwards is just an overrun.
How far ahead should I book to avoid rush costs?+
Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.
When is payment due?+
Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.
How can I lower the cost without the stand looking cheap?+
Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.
Why do two quotes for the same brief differ so much?+
Almost always because they describe two different stands. On the illustrative 18 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹93,000, or 24% of ₹3,80,000. Ask both vendors to itemise against the same written scope and the gap explains itself.
What is never included in a stall quote?+
Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹60,000 of ₹6,00,000 — small enough to forget and large enough to hurt.
What does a 18 sq.m stand cost?+
Using the published band, the structure alone is ₹1,62,000–₹3,24,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹3,80,000 before GST — about ₹21,111 per sq.m — for a mid-finish custom stand.
Is the cheapest quote ever the right one?+
Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.
Event Production Company near you
Our crews deliver event production company in every major Indian city.
