India's largest stall fabrication network · 119 cities · 1,461 venues
Brand Experience Zones Cost in India: 2026 Price Guide

Cost Guides

Brand Experience Zones Cost in India: 2026 Price Guide

A full cost breakdown for brand experience zones in India — worked examples, the lines exhibitors forget, the price of changing your mind, and how reuse lowers the cost per show.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

Quoted per experience. For brand experience zones, number of concept options and revision rounds, depth of 3D work (stills, 360° views or walkthrough video) and technical drawing detail required by the organiser do most of the work in the arithmetic. Decide those before you brief anyone, insist on an itemised quote, and compare like with like: the cheapest total is usually the one with the most left out.

Key takeaways

  • Quoted per experience.
  • Before anything else, settle number of concept options and revision rounds and depth of 3D work (stills, 360° views or walkthrough video) — the rest of the quote follows from them.
  • A lump sum cannot be compared with anything. Two itemised quotes against one written scope can.
  • Only 50% of this page's illustrative total is fabrication. The other ₹4,88,000 is everything a lump sum hides.
  • Reuse beats negotiation. A second outing with the same structure is 30% of the first show's figure, with nothing haggled.
  • Changing your mind is free while the concept is being designed and expensive at every stage after it.

Brand experience zones: the published ranges

Interactive zones with projection, gamification and photo moments that visitors share.

Quoted per experience. Prices in metro cities such as Delhi NCR, Mumbai and Bengaluru tend to sit slightly higher because of venue labour rules and compressed build-up timings, while Tier 2 cities can be more economical when the build is planned well in advance. The difference is rarely in the fabrication itself — it is in transport distance, crew availability during a busy show week, and whether the organiser's schedule forces night-shift labour.

Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.

Note the span: top of band to bottom of band is a factor of 2, exactly. That makes the first real budget question not "how much" but "which" — the same build money is a stand of a given area at a plain finish, or half that area at a premium one. Decide that before the concept, because it changes the layout, not just the specification.

Construction typeWhere it sits on costWhat you still own afterwardsTypical fit
Shell scheme upgradeLowestGraphics only9–18 sq.m, first-time or budget exhibitors
Octanorm / system buildLowFrame and graphics9–36 sq.m, exhibitors doing several shows a year
Modular with custom graphicsMediumFrame, graphics, furniture18–54 sq.m, repeat exhibitors wanting a branded look
Custom wooden build₹9,000–₹18,000/sq.mLimitedAny size where the stand must look bespoke
Double-deckerQuoted per projectStructure, with engineering72 sq.m and above, when meetings would eat display space

Only the custom band is a published per-sq.m rate. The others are positions relative to it, because what they cost depends on how much of the frame already exists.

What drives the cost

A quote is not a number, it is a set of decisions you have already made without realising it. These are the variables doing the work, and each one is negotiable before the brief goes out and expensive afterwards.

Area and open sides dominate everything else. A stand with three open sides needs three finished faces, three lighting runs and more staff than an inline stand of the same area, so it costs more per square metre even before any design decision is made.

Two more variables carry most of the remaining money: how long you have given the job, and what the surfaces are made of. A 54 sq.m stand needs 5 weeks on our schedule; booked inside that, the same work happens at night-shift rates. And finish is where budgets quietly disappear, because the gap between a convincing laminate and a veneer costs real money and is invisible from two metres away.

  • Technical drawing detail required by the organiser
  • Whether design is bundled with fabrication
  • Number of concept options and revision rounds
  • Depth of 3D work (stills, 360° views or walkthrough video)
  • The number of approval rounds before the drawing is frozen
  • Whether furniture is hired for the week or fabricated to keep
  • Anything the organiser has to sign off: height, rigging, a raised floor, a second storey
  • How much of the stand has to be new, and how much can come out of storage
You cannot compare two quotes until both describe the same stand.

What a brand experience zones quote should itemise

An itemised quote is not a courtesy, it is the only format in which a price can be checked. Each line is something you can question, reduce or delete; a single figure is something you can only accept or refuse.

The exclusions are more informative than the inclusions. Transport back from the venue, the crew who put it up, the dismantle inside the organiser's window, the electrical fittings and the tax: ask about those five by name, because a quote rarely mentions what it has left out.

For design-led work there are a few lines beyond the obvious ones that belong on the page: the certification the venue will ask for, the drawings the organiser will ask for, and the person whose phone you will be ringing at seven in the morning on build-up day. None of those are large figures. All of them are expensive to arrange late.

  • Photo and selfie zones
  • Visitor data capture
  • Graphics proofing, and what happens if a panel has to be reprinted
  • GST, shown as a figure rather than as a footnote
  • Electrical fittings, the stand's own wiring, and the load being declared
  • Storage of reusable elements after the show, and for how long
  • Installation, the on-site crew, and who supervises them
  • Organiser drawing submission and approval handling
  • Projection mapping
  • Interactive floors and walls

A worked example: 54 sq.m custom stand

An example is worth more than a range. This one is 54 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.

At ₹9,74,000 this stand works out at roughly ₹18,037 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹4,88,000, a little more than the fabrication itself.

Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 54 sq.m of structure is ₹9,72,000 rather than ₹4,86,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.

Worked example · Fifty-four square metres, mid finish, three sides open
Structure and joinery (54 sq.m × ₹9,000)₹4,86,000
Raised flooring and carpet₹62,000
Furniture — counters, seating, planters₹54,000
Graphics — brand wall, tensioned fabric and vinyl₹1,34,000
Lighting — track, aimed spots and backlit panels₹78,000
Transport, both ways₹68,000
Installation, crew and dismantle₹92,000
Indicative total, before GST₹9,74,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

What the same budget buys at different sizes

This is the comparison most briefs skip. At every size, the band gives you a lower figure and an upper one, and the gap between them is not padding: it is finish, light, floor and detail. The last column names what it buys, so you can decide whether you want it more than you want the extra square metres.

The arithmetic has a tidy consequence. ₹18,000 less ₹9,000 is ₹9,000, which is the lower figure, so the money that upgrades a stand from the bottom of the band to the top would instead have doubled its area. Whichever you pick, you are spending the same amount — which means the decision is about what the stand has to do, not about what it costs.

Choose by the job, not the taste. Anything involving queuing, demonstrating, handling or sitting down is an argument for area, because the premium finish on a stand nobody can enter is money spent on photographs. Anything involving persuasion rather than throughput is an argument for finish — and in that case a smaller stand, properly lit, beats a larger one that looks provisional.

Stall sizeLower end of the bandUpper end of the bandThe spread pays for
9 sq.m₹81,000₹1,62,000Better print, aimed light instead of clip lamps, and an edge finish that survives the week
18 sq.m₹1,62,000₹3,24,000A raised floor, aimed lighting and furniture you do not have to apologise for
36 sq.m₹3,24,000₹6,48,000Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner
54 sq.m₹4,86,000₹9,72,000Double-height brand elements, integrated AV and a storage wall that hides the cartons
72 sq.m₹6,48,000₹12,96,000Architectural form — curves, a ceiling element, and a stand that reads as a building

These columns are the structure line and nothing else — the same line that is ₹4,86,000 in the 54 sq.m example above. Everything else on that example is additional at every size here.

Reading the gap between two quotes

The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.

We have itemised the gap below rather than describing it. Starting from the 54 sq.m example at ₹9,74,000, six reasonable-sounding assumptions produce ₹7,56,000 instead. The ₹2,18,000 between them is 22% of the total, and every rupee of it is a decision about scope that the brief did not make.

So the fix sits with the buyer. Specify the things above in writing before you circulate the enquiry, and the spread between quotes collapses to something like the real difference between the vendors. Skip it, and you are not comparing prices at all — you are comparing assumptions.

Where quotes divergeWhat each vendor has assumedAsk this and the gap closes
GraphicsTensioned fabric on a frame against printed flex taped to a panelWhat is it printed on, and how is it fixed to the wall?
RiskOne vendor has priced the unknowns; the other will raise them later as variationsWhat happens to this price if the drawing changes?
Drawings and approvalsOne vendor is preparing the organiser submission; the other expects you toWho prepares the drawings, and who submits them?
InstallationA day crew against a night-shift crew, with or without supervisionHow many crew, on which shift, and who supervises them?
Who builds itOne quote comes from the workshop; the other from somebody who will find oneWhose workshop is it, and may we see a build in progress?
TransportOne leg, both legs, or quietly left outIs the return journey inside this figure?
LightingFourteen aimed fixtures against six, or against none at allHow many fixtures, of what type, aimed at what?
FlooringA raised platform with cable management against carpet on the hall floorRaised or not, and where do the cables run?

Every row is a question you can ask both vendors in the same email. The answers, side by side, usually explain the entire difference.

Worked example · The same 54 sq.m brief, quoted two ways
Lighter board in the structure, with an exposed edge instead of a finished one₹62,000
Printed flex taped to panels instead of tensioned fabric on a frame₹38,000
Six aimed spots instead of fourteen, and no backlit panel₹26,000
Carpet laid straight on the hall floor instead of a raised platform with cable management₹30,000
A four-piece hired furniture package instead of eight pieces₹17,000
Installation and dismantle left as "to be advised"₹45,000
Total difference between the two quotes₹2,18,000

Illustrative, built by making six substitutions to the 54 sq.m example above. The higher quote is ₹9,74,000 and the lower is ₹7,56,000; the difference is ₹2,18,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

Where to cut, and where cutting costs more

There are two kinds of saving in a stall quote. One kind removes something nobody was going to look at. The other removes something that then has to be dealt with on site, at site prices, by people with the wrong tools. The lines look identical on paper.

One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.

The list immediately below is the first kind: real options, which can go without anybody noticing. The table after it is the second kind — lines that look like fat and are not, with what actually happens when each one is cut. Start with the list, because the genuinely optional items on a brand experience zones quote are usually larger than the false economies and far less painful to remove.

  • Fabricated furniture, where hired furniture would have been collected afterwards anyway
  • Giveaways in quantity, which measure footfall rather than interest
  • Backlighting on every panel, rather than on the one panel you want looked at
  • Veneer or PU paint where a good laminate reads identically from the aisle
  • A second screen that repeats what the first screen is already showing
  • Wall height above the sightline, which costs material and is read by nobody
LineWhy it looks optionalWhat actually happens if you cut it
Pre-build at the workshopThe crew can assemble it on siteSite is where there is no spare panel, no saw and no time. A dry run finds the problem while it is still cheap
The power load calculationThe organiser supplies powerThe organiser supplies the load you declared. A screen added after the declaration is a screen without power
Dismantle and clearanceThe show is over by thenThe organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost
A graphics proofing roundThe artwork is finalLarge-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall
Raised flooringCarpet on the hall floor costs lessThe cables then run under the carpet, and every visitor finds them with their feet
Supervision during build-upThe crew knows the drawingWhen a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window

None of these are large figures in a quote. All of them are large figures once the hall is open, which is the entire point of the table.

Delete what nobody will look at. Keep what everybody will walk on, touch, or need power from.

What changing your mind costs, stage by stage

Almost every overrun we see has the same shape. The quote was accurate; the decisions arrived late. A change costs nothing while nothing has been drawn to scale, and it costs a night shift once the stand is in the hall — the same change, twenty times the price.

So the cheapest thing you can buy is time at the front. A 54 sq.m build runs to 5 weeks on our schedule — 3 weeks base plus 2 for the area — and a premium finish or a double-decker element adds 2 and 2 weeks respectively. None of that window is spare, which is exactly why a decision taken in week one is free and the same decision in week four is not.

Protect yourself with two things. First, a single named approver — two people with different opinions about the same wall is the most expensive organisational arrangement in exhibiting. Second, a written variation process, so that every change has a price attached at the moment it is agreed rather than at the moment it is invoiced.

Point in the programmeCost of a change hereThe reason
After design sign-off, before productionA redraw and a requoteDrawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you
After materials are orderedThe material, plus its replacementBoard, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts
In productionThe labour already spent, plus the labour to redo itA fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved
After graphics go to printA full reprint of the affected panelLarge-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you
Once the show has openedUsually nothing can be done at allThe hall is open and the stand is public. The only honest response is to write it down for the next edition

Read the first row twice. It is the only stage at which a change is free, and it is the stage exhibitors rush through fastest.

Exhibiting soon? Let's build your stall.

Or use the full form

If the total is fixed, start there

Most exhibitors do not start with a design, they start with a number. Working backwards from that number is a more reliable method than briefing a design and discovering afterwards what it costs — and it has one step that nearly everybody misses, which is subtracting the costs that no stand builder will ever quote you.

After the list of costs that never reach a stall quote comes a worked allocation of ₹15,00,000, offered as an illustration rather than as a standard, because no standard exists that we could honestly cite. Read it from the bottom: ₹75,000 unallocated, ₹1,50,000 of costs no stand quote will carry, and ₹13,50,000 — 90% — left for the stand itself.

In this illustration the build line is ₹6,75,000: 75 sq.m of custom structure at ₹9,000 per sq.m, or 37.5 sq.m at ₹18,000. That single comparison — booked area against affordable area — settles the construction-type question before anybody draws anything, and it is a far less painful conversation to have at this stage than after a concept has been approved.

  • Storage of reusable elements between this edition and the next
  • Exhibitor badges, extra passes and vehicle parking
  • Printed collateral, samples, and anything you intend to hand over
  • Product freight — the goods on display travel separately from the stand that holds them
  • Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
  • Travel, hotels and local transport for everyone who will stand on the stand
  • The cost of your own team being away from their desks for the build-up and the show
  • The organiser's power connection, charged against the load you declare
Budget lineIllustrative shareAt a total of ₹15,00,000
Stand build — structure, joinery and finish45%₹6,75,000
Graphics, lighting and AV20%₹3,00,000
Flooring and furniture10%₹1,50,000
Transport, installation and dismantle15%₹2,25,000
Your own show costs — travel, staffing, collateral, hospitality5%₹75,000
Contingency, held back rather than allocated at briefing5%₹75,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹15,00,000. The first four rows, ₹13,50,000, are what a stand builder quotes against. GST sits on top.

What you get for the money at each size

Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.

One column deserves more attention than it gets: how many people physically fit. Display area divided by 2.5 gives the number of visitors who can be in the stand simultaneously, and that figure is a ceiling on everything your marketing plan promises.

Lead time belongs in a cost conversation because it is a cost. 3 weeks is the base, plus 1 week from 24 sq.m and 2 from 54 sq.m, with 2 more for a premium finish and 2 for a double-decker. Book inside those windows and the same stand costs more, because the work moves on to shifts that cost more.

Area bookedDisplayStorageStaffVisitors at onceLead time
9 sq.m7.6 sq.m0.9 sq.m233
12 sq.m10.2 sq.m1.2 sq.m243
18 sq.m15.3 sq.m1.8 sq.m263
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Paying for it: stages and deliverables

Payment terms vary by vendor, by scope and by how long the two of you have worked together, and we are not going to invent a standard split — there is no honest source for one. What can be said without inventing anything is what each stage ought to correspond to, and that is the part worth negotiating.

Hold to a single principle and the rest follows: no payment stage without a deliverable attached. The deliverables are obvious once you ask for them — the approved drawing set, the materials on the floor, the dry assembly, the finished stand — and each one is something you or a colleague can physically verify.

The item to settle alongside the schedule is how changes get priced. Who approves them on your side, in what format, and is the figure confirmed before work starts? Nearly every uncomfortable conversation about an exhibition invoice began as a change that nobody priced at the moment it was agreed.

  1. 01

    Name one approver on your side

    One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.

  2. 02

    Ask what happens if the show moves

    Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.

  3. 03

    Tie every stage to something you can see

    A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.

  4. 04

    Keep something payable after handover

    Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.

  5. 05

    Get the tax position in writing

    Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.

  6. 06

    Write the variation process down before there is a variation

    Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.

A milestone with no deliverable attached is a date, and a date is not a milestone.

How the cost per show falls across a year

The arithmetic changes completely once you exhibit twice. Costing a stand against one show, when it will stand at three, overstates it by a wide margin; but it only overstates it if the stand was built to be reused, which is a decision made at design stage and cannot be made afterwards.

Costed properly — see the example — the second show has no structure line, a graphics reprint, a refurbishment allowance, storage between editions, and transport and installation as before. The total is ₹2,96,000 — 30% of the ₹9,74,000 first show — because ₹6,78,000 of that first figure was a one-time purchase.

Extended to a third show in the table, the average per show becomes about ₹5,22,000, against ₹9,74,000 for the first outing alone: a 46% fall. No negotiation produces that. It comes entirely from a design decision taken before the first panel was cut, which is why it has to be asked for at briefing stage.

The conditions are worth stating because they are easy to miss. Modular structure, so it dismantles rather than breaks. Graphics on a separate reprintable layer. And somewhere to keep it between shows — a genuine cost, carried as a line in the example, and the one that most often turns a reusable stand into a stand that was reusable for a fortnight.

OutingThis editionSpent to dateRunning average
Show 1 — the first build₹9,74,000₹9,74,000₹9,74,000
Show 2 — same structure, new graphics₹2,96,000₹12,70,000₹6,35,000
Show 3 — same structure, new graphics₹2,96,000₹15,66,000₹5,22,000

Illustrative, built from the two worked examples on this page: ₹9,74,000 for the first build and ₹2,96,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · What the second show carries, and what it does not
Graphics reprinted for the new show and the new message₹67,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹45,000
Storage of the structure between the two shows₹24,000
Transport, both ways₹68,000
Installation, crew and dismantle₹92,000
Indicative second-show total, before GST₹2,96,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹9,74,000, this is 30%, so ₹6,78,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

Spending less without showing it

Spend on the elements visitors notice in the first three seconds from the aisle — the brand wall, the lighting and the hero product position — and save on hidden structure, storage and anything above the sightline.

Three habits cut more than any negotiation does — reuse the frame, hire rather than build the furniture, and keep graphics on fabric so next year's edition costs a reprint instead of a rebuild.

Protect the lighting line. The hall lights the aisles, not your stand, and an under-lit stand looks cheap however much the joinery cost — it is the smallest line with the largest visible return.

Read the list with the calendar in mind. These are savings at briefing stage and costs at any stage after it — a reprint instead of a rebuild saves money only if the design anticipated it, and a simpler footprint saves money only if the cutting list has not been written yet.

  • Freeze the layout once and leave it frozen, because the expensive version of every saving is a change
  • Build the storage wall out of the back of the display wall, so one structure does two jobs
  • Print one hero graphic properly and keep everything around it plain
  • Share a lorry with your own product freight, if the dates allow it
  • Upgrade a shell scheme instead of building raw space, for stalls under 18 sq.m
  • Book early: rush charges and night-shift labour are avoidable rather than inevitable
  • Choose a laminate that reads like veneer from a metre away, and spend the difference on light

Where quotes go wrong

Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: renders that cannot be built within the budget. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.

The second is scope that was never written down. If the quote does not name the finish, the lighting count and the flooring type, two vendors are not quoting the same stand and the comparison is meaningless.

And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.

  • Renders that cannot be built within the budget
  • Designs that ignore organiser height and setback rules
  • No material or finish specification, so the build looks different from the render

How to get a real figure

Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised brand experience zones quote within about two days.

Design is free with every confirmed fabrication order; the build happens in our own workshops; the organiser drawings and approvals are ours to handle; and one project manager stays with the job from brief through dismantle. Quoted per experience.

Before you sign anything, get three answers in writing: what is itemised, what is excluded, and what happens to the price when the drawing changes. They take one email to request, and they are the difference between a quote and a guess.

Frequently asked questions

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 54 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹2,18,000, or 22% of ₹9,74,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

How far ahead should I book to avoid rush costs?+

Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.

What does a 54 sq.m stand cost?+

Using the published band, the structure alone is ₹4,86,000–₹9,72,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹9,74,000 before GST — about ₹18,037 per sq.m — for a mid-finish custom stand.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

What is never included in a stall quote?+

Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,50,000 of ₹15,00,000 — small enough to forget and large enough to hurt.

Does reusing a stand really lower the cost?+

Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹2,96,000 rather than ₹9,74,000 — 30% of the first show — because ₹6,78,000 of the first build is not bought again. Across three shows the average falls to about ₹5,22,000.

How much does brand experience zones cost in India?+

Quoted per experience. For a custom build, work from ₹9,000–₹18,000 per sq.m for the structure, and treat graphics, lighting, flooring, furniture, AV, transport, installation and taxes as separate lines rather than as details inside that figure.

When is payment due?+

Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.

How much contingency should I hold back?+

Enough to absorb one change you have not thought of yet. The illustrative allocation on this page holds back ₹75,000 of ₹15,00,000, which is a planning habit rather than a published rule — set your own figure, but set it before briefing, because a contingency invented afterwards is just an overrun.

Brand Experience Zones near you

Our crews deliver brand experience zones in every major Indian city.

Powered byIRPR