India's largest stall fabrication network · 119 cities · 1,461 venues
Event Management Company Cost in India: 2026 Price Guide

Cost Guides

Event Management Company Cost in India: 2026 Price Guide

What event management company really costs in India, what pushes the price up or down, and how to get an accurate, itemised quote.

By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read

Short answer

Quoted per event after a brief; we share a line-item budget before you commit. For event management company, total area and number of co-exhibitors, scope (design, build, AV, furniture, logistics, manpower, hospitality) and number of cities or shows in the programme do most of the work in the arithmetic. Decide those before you brief anyone, insist on an itemised quote, and compare like with like: the cheapest total is usually the one with the most left out.

Key takeaways

  • Every budget overrun has a date on it, and the date is always after design sign-off.
  • Quoted per event after a brief; we share a line-item budget before you commit.
  • The biggest cost drivers are total area and number of co-exhibitors and scope (design, build, AV, furniture, logistics, manpower, hospitality).
  • Six ordinary substitutions explain 22% of the gap between two quotes for the same brief. Ask for the itemisation and the gap stops being a mystery.
  • Only 48% of this page's illustrative total is fabrication. The other ₹3,49,000 is everything a lump sum hides.
  • Booking early and reusing elements lowers the cost per event more than negotiation does.

What event management company costs in India

One accountable team plans, designs, builds and runs your event — venue, stage, AV, branding, logistics, guest flow and show-calling — so you only focus on your guests.

Quoted per event after a brief; we share a line-item budget before you commit. Expect a modest premium in Delhi NCR, Mumbai and Bengaluru, driven by venue labour rules and compressed build-up windows rather than by the build itself. A Tier 2 city planned four weeks out is frequently the cheapest version of the same stand.

The published band for custom fabrication is ₹9,000–₹18,000 per sq.m for the build. Modular and octanorm system construction sits below that band because the frame is reused rather than cut fresh, and an upgraded shell scheme — the organiser's own panels wrapped in printed fabric, with a raised floor, spotlights and a branded counter — sits below that again. Those three options are not different qualities of the same thing; they are different trade-offs between cost, reuse and how much the stand can be made to look like only your brand.

The band has an arithmetic shape worth seeing. Because ₹18,000 is twice ₹9,000, the same build money buys either a large plain stand or half the area beautifully finished. Exhibitors who have decided which of those they need brief quickly and buy well; exhibitors who have not spend the whole process trying to have both.

Construction typeRelative costReuseBest for
Shell scheme upgradeLowestGraphics only9–18 sq.m, first-time or budget exhibitors
Octanorm / system buildLowFrame and graphics9–36 sq.m, exhibitors doing several shows a year
Modular with custom graphicsMediumFrame, graphics, furniture18–54 sq.m, repeat exhibitors wanting a branded look
Custom wooden build₹9,000–₹18,000/sq.mLimitedAny size where the stand must look bespoke
Double-deckerQuoted per projectStructure, with engineering72 sq.m and above, when meetings would eat display space

Relative cost compares the build only. AV, furniture, flooring, transport, installation and taxes are quoted on their own lines in every case.

What drives the cost

A quote is not a number, it is a set of decisions you have already made without realising it. These are the variables doing the work, and each one is negotiable before the brief goes out and expensive afterwards.

Two numbers set the budget before anyone opens a sketchbook: how many square metres you booked and how many of its sides are open. An island stand is not a more expensive taste, it is four finished faces instead of one.

After area, the two variables with the most money in them are time and finish. Time, because a job booked inside the lead time is a job partly done at overtime rates: our own schedule needs 4 weeks for 36 sq.m, and compressing it does not remove work, it only moves it to a more expensive shift. Finish, because the difference between a good laminate and a veneer is invisible from the aisle and perfectly visible on the invoice.

  • Total area and number of co-exhibitors
  • Scope (design, build, AV, furniture, logistics, manpower, hospitality)
  • Number of cities or shows in the programme
  • Approval layers with organisers, embassies or departments
  • The number of open sides, which decides how many faces have to be finished
  • How much of the stand has to be new, and how much can come out of storage
  • The finish on surfaces visitors can touch, as against the ones they cannot
  • Whether the build-up window runs in daytime hours or forces a night shift
You cannot compare two quotes until both describe the same stand.

The lines a quote has to name

Insist on the itemisation before you discuss the total. Every line is a decision somebody made on your behalf, and some of those decisions are ones you would have made differently if you had been shown them.

Four lines go missing more often than the rest: the return journey, the on-site crew, the dismantle, and the tax. On this page's illustrative 36 sq.m figures, transport and installation alone are ₹1,17,000 — which is what a quote without them is quietly saving.

There is a third group of lines, small in value and large in consequence: who certifies the materials, who prepares and submits the organiser drawings, and who answers the phone during build-up. Ask for those to be named rather than assumed, because on turnkey participations they are the lines that decide whether the rest of the quote gets delivered.

  • Venue scouting and permissions
  • Stage, AV, lighting and decor in-house
  • On-ground crew and show-calling
  • Installation, the on-site crew, and who supervises them
  • Dismantle and clearing the stand inside the organiser's window
  • Fire-retardant certification for the materials being used
  • A named project manager, with a phone number, for the build-up days
  • Transport to the venue and the return leg, stated separately
  • Storage of reusable elements after the show, and for how long
  • Concept, budget and run-of-show planning

What 36 sq.m actually costs, line by line

Here is how a mid-size custom build actually breaks down. The structure line uses the bottom of the published band — ₹9,000 per sq.m across 36 sq.m — and everything below it is a separate scope that a lump-sum quote would bury.

₹6,73,000 across 36 sq.m is about ₹18,694 per sq.m all-in, and that all-in figure is the one to compare, because it is the only one both vendors have to answer for. The split is the interesting part: fabrication is 48% of the total and everything else is the other 52%, or ₹3,49,000.

Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 36 sq.m of structure is ₹6,48,000 rather than ₹3,24,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.

Worked example · Illustrative 36 sq.m custom build, costed line by line
Structure and joinery (36 sq.m × ₹9,000)₹3,24,000
Graphics — brand wall, tensioned fabric and vinyl₹97,000
Lighting — track, aimed spots and backlit panels₹54,000
Raised flooring and carpet₹43,000
Furniture — counters, seating, planters₹38,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative total, before GST₹6,73,000

Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.

Area against finish: what the band actually means

The band is a range, not a price, and its two ends buy very different stands. At any given size, the lower figure is the plain version and the upper is the premium one — and because the upper is twice the lower, the premium version of a stand costs the same as the plain version of twice the area. Here is that worked out at common sizes.

The arithmetic has a tidy consequence. ₹18,000 less ₹9,000 is ₹9,000, which is the lower figure, so the money that upgrades a stand from the bottom of the band to the top would instead have doubled its area. Whichever you pick, you are spending the same amount — which means the decision is about what the stand has to do, not about what it costs.

Which way to go depends on what the stand has to achieve. If visitors need to handle the product, queue for a demonstration or sit down with somebody, area wins: a crowded premium stand turns people away, and the finish is wasted on the backs of their heads. If the job is credibility — a launch, a first appearance in a category, a stand that has to look like the market leader's — finish wins, and a smaller, denser, better-lit stand does it better than a large plain one.

Stall sizeLower end of the bandUpper end of the bandThe spread pays for
9 sq.m₹81,000₹1,62,000Better print, aimed light instead of clip lamps, and an edge finish that survives the week
12 sq.m₹1,08,000₹2,16,000A laminate that survives handling, a lighting track, and a counter that locks
18 sq.m₹1,62,000₹3,24,000A raised floor, aimed lighting and furniture you do not have to apologise for
24 sq.m₹2,16,000₹4,32,000A branded floor, a demo counter that actually works, and a spare hero panel
72 sq.m₹6,48,000₹12,96,000Architectural form — curves, a ceiling element, and a stand that reads as a building

Build only. Graphics, lighting, flooring, furniture, AV, transport, installation, dismantle and GST sit outside these two columns in every row.

Why two quotes for one brief differ

The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.

We have itemised the gap below rather than describing it. Starting from the 36 sq.m example at ₹6,73,000, six reasonable-sounding assumptions produce ₹5,23,000 instead. The ₹1,50,000 between them is 22% of the total, and every rupee of it is a decision about scope that the brief did not make.

So the fix sits with the buyer. Specify the things above in writing before you circulate the enquiry, and the spread between quotes collapses to something like the real difference between the vendors. Skip it, and you are not comparing prices at all — you are comparing assumptions.

Where quotes divergeWhat each vendor has assumedAsk this and the gap closes
LightingFourteen aimed fixtures against six, or against none at allHow many fixtures, of what type, aimed at what?
StructurePly and MDF to a finished edge in one quote, a lighter board with an exposed edge in the otherName the board, the thickness and the edge finish
ElectricalThe organiser's power charge, the stand's own wiring, or neitherWho pays the organiser, and who wires the stand?
TransportOne leg, both legs, or quietly left outIs the return journey inside this figure?
DismantleFrequently missing from the cheaper quote entirelyIs clearing the stand inside the organiser's window in this price?
FurnitureHired against fabricated, and a four-piece package against an eight-piece oneList the pieces, and say which are hired and which are built
InstallationA day crew against a night-shift crew, with or without supervisionHow many crew, on which shift, and who supervises them?
Drawings and approvalsOne vendor is preparing the organiser submission; the other expects you toWho prepares the drawings, and who submits them?

Work down the list before you negotiate. A gap explained is usually a gap you no longer want closed, because you now know which stand you are buying.

Worked example · Itemising the gap between ₹6,73,000 and ₹5,23,000
Printed flex taped to panels instead of tensioned fabric on a frame₹26,000
Six aimed spots instead of fourteen, and no backlit panel₹18,000
Carpet laid straight on the hall floor instead of a raised platform with cable management₹21,000
A four-piece hired furniture package instead of eight pieces₹12,000
Installation and dismantle left as "to be advised"₹31,000
Lighter board in the structure, with an exposed edge instead of a finished one₹42,000
Total difference between the two quotes₹1,50,000

Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.

Where to cut, and where cutting costs more

Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.

One question sorts them. What happens if this is not in the quote? Answers of the form "nobody will notice" are genuine savings. Answers of the form "we will sort it at the venue" are deferrals, and the venue is the worst place to buy anything, because you are buying it in a hurry from whoever is standing there.

Both halves of the distinction follow. First the lines that genuinely are optional — and these are usually the bigger numbers, which is the happy part of this section. Then, in the table, the ones that only look optional, each with its consequence spelled out.

  • A second set of graphics for a message you have not tested on anybody yet
  • A model, a mock-up or a prop that duplicates something the product already demonstrates
  • A ceiling or hanging element, unless the stand has to be found from across the hall
  • A printed floor, when plain carpet in the brand colour does the same job
  • A second screen that repeats what the first screen is already showing
  • Giveaways in quantity, which measure footfall rather than interest
LineWhy it looks optionalWhat actually happens if you cut it
Lighting beyond what the hall gives youThe hall is already litHall lighting is aimed at the aisles. An unlit stand reads as under-funded from three metres away, whatever the joinery cost
The cable and socket count on the drawingThat is site detailSite detail becomes a visible extension lead across the floor of a stand you paid to look expensive
Storage between showsWe will decide after this one"After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable
The power load calculationThe organiser supplies powerThe organiser supplies the load you declared. A screen added after the declaration is a screen without power
Fire-retardant certified materialNobody asks to see the certificateThe venue safety officer asks, and an uncertified panel is refused at the hall door on the first morning
Supervision during build-upThe crew knows the drawingWhen a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window
Raised flooringCarpet on the hall floor costs lessThe cables then run under the carpet, and every visitor finds them with their feet

If the budget genuinely will not stretch, cut from the list below this table instead. These lines are the ones that cost more when they are missing.

A saving that has to be dealt with on site is not a saving. It is a deferral with a surcharge.

What changing your mind costs, stage by stage

The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.

The practical consequence is to front-load the arguing. With 4 weeks on the schedule for 36 sq.m, every disagreement settled before sign-off is free and every one settled afterwards has a price. Add 2 weeks for a premium finish or 2 for a double-decker element, and the calendar is still unforgiving once production has started.

Two habits keep this under control. Name one approver on your side, so that a change is a decision rather than a negotiation. And ask, before the first payment, how variations are priced and approved — in writing, with a figure confirmed before work starts, rather than appearing on a final invoice as a surprise.

Point in the programmeCost of a change hereThe reason
While the concept is being designedTime, and nothing elseNothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it
After materials are orderedThe material, plus its replacementBoard, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts
After graphics go to printA full reprint of the affected panelLarge-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment
After dispatchFreight both ways, and a hole in the build scheduleThe panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience
During build-upNight-shift labour, and whatever can be improvisedThere is no workshop at the venue, no spare material, and the clock belongs to the organiser rather than to you
Once the show has openedUsually nothing can be done at allThe hall is open and the stand is public. The only honest response is to write it down for the next edition

Read the first row twice. It is the only stage at which a change is free, and it is the stage exhibitors rush through fastest.

Exhibiting soon? Let's build your stall.

Or use the full form

Working back from the number you have

In practice the budget usually exists before the brief. That is not a problem; it is a better starting point, provided you do the subtraction first. The step that gets skipped is taking out the exhibiting costs that never appear on a stall quote at all, because those are the ones that arrive late and unbudgeted.

What follows is the list of costs no stand builder will quote you, and then one way to split a total, shown against ₹10,00,000. Treat it as an illustration and not as a benchmark — there is no published standard and we are not inventing one. Its useful feature is the last two lines: ₹9,00,000 is what a builder quotes against, ₹1,00,000 is yours alone, and ₹50,000 of the total is held back rather than committed.

In this illustration the build line is ₹4,50,000: 50 sq.m of custom structure at ₹9,000 per sq.m, or 25 sq.m at ₹18,000. That single comparison — booked area against affordable area — settles the construction-type question before anybody draws anything, and it is a far less painful conversation to have at this stage than after a concept has been approved.

  • Printed collateral, samples, and anything you intend to hand over
  • Lead-capture devices, the data connection, and somewhere to charge them
  • Exhibitor badges, extra passes and vehicle parking
  • Photography and video of the finished stand, which is the asset you use all year
  • Promoters, hostesses or interpreters, if your visitors need them
  • Travel, hotels and local transport for everyone who will stand on the stand
  • Space rental, invoiced to you by the organiser rather than by your stand builder
  • Insurance on goods in transit and on the stand itself
AllocationShareIllustrative amount
Stand build — structure, joinery and finish45%₹4,50,000
Graphics, lighting and AV20%₹2,00,000
Flooring and furniture10%₹1,00,000
Transport, installation and dismantle15%₹1,50,000
Your own show costs — travel, staffing, collateral, hospitality5%₹50,000
Contingency, held back rather than allocated at briefing5%₹50,000

Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.

Size, space and what fits inside it

Area buys capability before it buys impression. The table uses the same ratios as our stall planner — 10% of the floor to storage below 18 sq.m, 15% above it, 5% to a meeting corner by default, and whatever is left to display.

One column deserves more attention than it gets: how many people physically fit. Display area divided by 2.5 gives the number of visitors who can be in the stand simultaneously, and that figure is a ceiling on everything your marketing plan promises.

Treat the weeks column as money. 3 weeks base, one more from 24 sq.m, 2 more from 54 sq.m, 2 more for a premium finish, 2 more for a second storey. Every week you take off the front of that schedule is bought back later at a worse rate, which is why late booking is a price decision rather than a planning one.

Stall sizeDisplay areaStorageStaff neededVisitors at onceBuild weeks
9 sq.m7.6 sq.m0.9 sq.m233
24 sq.m19.2 sq.m3.6 sq.m374
36 sq.m28.8 sq.m5.4 sq.m4114
54 sq.m43.2 sq.m8.1 sq.m6175
72 sq.m57.6 sq.m10.8 sq.m8235
100 sq.m80 sq.m15 sq.m12325

Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.

Payment, milestones and what each one should mean

There is no universal payment schedule in this industry and anybody presenting one is describing their own terms rather than a standard. So the useful discussion is not about the percentages but about what each payment should buy, and that can be specified precisely.

One rule covers most of it: tie money to evidence. Drawings approved, materials bought, a pre-build you can inspect, a stand handed over complete — those are things you can see. Dates are not evidence of anything, because a date arrives whether or not the work did.

The item to settle alongside the schedule is how changes get priced. Who approves them on your side, in what format, and is the figure confirmed before work starts? Nearly every uncomfortable conversation about an exhibition invoice began as a change that nobody priced at the moment it was agreed.

  1. 01

    Name one approver on your side

    One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.

  2. 02

    Keep something payable after handover

    Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.

  3. 03

    Keep the organiser's bills on a separate line

    Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.

  4. 04

    Tie every stage to something you can see

    A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.

  5. 05

    Ask what happens if the show moves

    Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.

  6. 06

    Confirm what the first payment actually unlocks

    Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.

A milestone with no deliverable attached is a date, and a date is not a milestone.

Spreading the cost over a programme of shows

Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.

The second outing is costed in full in the example on this page. The structure, having been stored, does not reappear: what remains is a graphics reprint for the new message, refurbishment of what got marked, storage between the two shows, and the same transport and installation as before. That comes to ₹2,15,000 against the first show's ₹6,73,000 — 32% of it — because ₹4,58,000 of the first build is not bought a second time.

The table follows it across three shows, and the average per show falls from ₹6,73,000 to ₹4,44,000 and then to about ₹3,67,667 — a fall of 45% against the first outing, with nothing negotiated and no corner cut. That is the strongest cost lever in exhibiting, and it is available only to exhibitors who asked for it before the first stand was built.

Three conditions have to hold, and they are all specification rather than luck. The structure has to be modular, dismantled in panels rather than broken down. The graphics have to be a separate layer — fabric on a frame, reprinted rather than rebuilt. And somewhere has to store it, which is a real cost and appears as a line in the example rather than being quietly ignored.

ShowCost this showCumulativeAverage per show so far
Show 1 — the first build₹6,73,000₹6,73,000₹6,73,000
Show 2 — same structure, new graphics₹2,15,000₹8,88,000₹4,44,000
Show 3 — same structure, new graphics₹2,15,000₹11,03,000₹3,67,667

Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.

Worked example · What the second show carries, and what it does not
Graphics reprinted for the new show and the new message₹48,000
Refurbishment — replaced panels, touch-up paint, relaminating what is marked₹32,000
Storage of the structure between the two shows₹18,000
Transport, both ways₹52,000
Installation, crew and dismantle₹65,000
Indicative second-show total, before GST₹2,15,000

Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.

How to reduce cost without looking cheap

Budget by sightline. What faces the aisle deserves the spend; storage walls, back-of-house and anything above head height does not, because nobody is looking at it.

Reuse modular frames, graphics systems and furniture across shows, choose fabric graphics over rigid printed panels where the design allows, and bundle design, build and AV with one partner so you are not paying three margins and reconciling three schedules.

Protect the lighting line. The hall lights the aisles, not your stand, and an under-lit stand looks cheap however much the joinery cost — it is the smallest line with the largest visible return.

One qualification on the whole list: timing. Each of these is a genuine saving if it is decided before the brief is frozen and an expensive change if it is decided afterwards. Hiring furniture is cheaper than building it; deciding to hire it after it has been built is not.

  • Print one hero graphic properly and keep everything around it plain
  • Hire the AV for the week instead of buying a screen you will then have to store
  • One strong message instead of five competing ones, which is cheaper and also works better
  • Reuse a modular structure across several shows — the second outing costs a fraction of the first
  • Share a lorry with your own product freight, if the dates allow it
  • Freeze the layout once and leave it frozen, because the expensive version of every saving is a change
  • Hire furniture and planters rather than fabricating them for a week

The three expensive failures

Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: too many vendors with no single point of accountability. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.

The second failure is unwritten scope. A quote that does not name the board, the fixture count and the flooring type is a quote for an unspecified stand, and two such quotes cannot be compared with each other at all.

The last of the three is subtler. The quote was right; the job changed. Half a dozen small additions after sign-off, none of them priced at the time, and the final figure is not the one anybody approved — which is an argument for agreeing the variation process at the same moment as the price.

  • Delayed approvals that compress build-up time
  • Too many vendors with no single point of accountability
  • Inconsistent branding across co-exhibitor booths
  • Budget overruns from scope that was never itemised

Get an accurate price

Share your event name, city, dates, stall area, number of open sides and two or three reference images. That is enough for a concept and an itemised event management company quote, usually within 48 hours.

We design free with every confirmed fabrication order, fabricate in our own workshops, prepare the organiser drawings and approvals, and put one project manager on the job from brief to dismantle. Quoted per event after a brief; we share a line-item budget before you commit.

One closing piece of advice that applies to every vendor including us. Ask for the itemised scope, ask explicitly what is excluded, and ask how variations are priced. A supplier who answers all three without hesitation is telling you something useful about how the build will go.

Frequently asked questions

How far ahead should I book to avoid rush costs?+

Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.

Do you charge separately for design?+

3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.

How can I lower the cost without the stand looking cheap?+

Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.

Who pays the organiser for space and power?+

You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.

Is GST included in event management company quotes?+

A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.

What is never included in a stall quote?+

Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹1,00,000 of ₹10,00,000 — small enough to forget and large enough to hurt.

Why do two quotes for the same brief differ so much?+

Almost always because they describe two different stands. On the illustrative 36 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹1,50,000, or 22% of ₹6,73,000. Ask both vendors to itemise against the same written scope and the gap explains itself.

Does reusing a stand really lower the cost?+

Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹2,15,000 rather than ₹6,73,000 — 32% of the first show — because ₹4,58,000 of the first build is not bought again. Across three shows the average falls to about ₹3,67,667.

When is payment due?+

Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.

Event Management Company near you

Our crews deliver event management company in every major Indian city.

Powered byIRPR