By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read
Short answer
Quoted per event. The final price for event stage fabrication in India depends mainly on show duration and number of event days, equipment size and specification (screen size, projector brightness or drone count) and content creation and programming time. The fastest way to an exact figure is to share your event, dates, size and reference images and ask for an itemised quote rather than a lump sum.
Key takeaways
- A lump sum cannot be compared with anything. Two itemised quotes against one written scope can.
- Only 48% of this page's illustrative total is fabrication. The other ₹3,49,000 is everything a lump sum hides.
- Reuse beats negotiation. A second outing with the same structure is 32% of the first show's figure, with nothing haggled.
- Every budget overrun has a date on it, and the date is always after design sign-off.
- Quoted per event.
- The biggest cost drivers are show duration and number of event days and equipment size and specification (screen size, projector brightness or drone count).
What event stage fabrication costs in India
Stages, backdrops, ramps and sets for conferences, dealer meets, award nights and launches.
Quoted per event. Expect a modest premium in Delhi NCR, Mumbai and Bengaluru, driven by venue labour rules and compressed build-up windows rather than by the build itself. A Tier 2 city planned four weeks out is frequently the cheapest version of the same stand.
Custom fabrication is published at ₹9,000–₹18,000 per sq.m. Below that sit system builds, where the frame is reused instead of cut fresh, and below those an upgraded shell scheme. Read those as three different bargains rather than three qualities: you are trading how bespoke the stand looks against how much of it you still own after the show.
Note the span: top of band to bottom of band is a factor of 2, exactly. That makes the first real budget question not "how much" but "which" — the same build money is a stand of a given area at a plain finish, or half that area at a premium one. Decide that before the concept, because it changes the layout, not just the specification.
| Construction type | Relative cost | Reuse | Best for |
|---|---|---|---|
| Shell scheme upgrade | Lowest | Graphics only | 9–18 sq.m, first-time or budget exhibitors |
| Octanorm / system build | Low | Frame and graphics | 9–36 sq.m, exhibitors doing several shows a year |
| Modular with custom graphics | Medium | Frame, graphics, furniture | 18–54 sq.m, repeat exhibitors wanting a branded look |
| Custom wooden build | ₹9,000–₹18,000/sq.m | Limited | Any size where the stand must look bespoke |
| Double-decker | Quoted per project | Structure, with engineering | 72 sq.m and above, when meetings would eat display space |
Relative cost compares the build only. AV, furniture, flooring, transport, installation and taxes are quoted on their own lines in every case.
What drives the cost
A quote is not a number, it is a set of decisions you have already made without realising it. These are the variables doing the work, and each one is negotiable before the brief goes out and expensive afterwards.
Area and open sides dominate everything else. A stand with three open sides needs three finished faces, three lighting runs and more staff than an inline stand of the same area, so it costs more per square metre even before any design decision is made.
Then there is the pair nobody prices at briefing stage: lead time and finish level. 4 weeks is the schedule for 36 sq.m — take that away and you have not saved anything, you have bought the same work on an overtime shift. Finish is the other one: specify veneer where laminate would read identically from the aisle and you have spent the lighting budget on something visitors cannot see.
- Show duration and number of event days
- Equipment size and specification (screen size, projector brightness or drone count)
- Content creation and programming time
- Rigging, power backup and technician crew size
- Permissions, venue rules and rehearsal time
- The number of open sides, which decides how many faces have to be finished
- The number of approval rounds before the drawing is frozen
- How much of the stand has to be new, and how much can come out of storage
- Whether the build-up window runs in daytime hours or forces a night shift
A lump sum is not a price. It is a price with the questions removed.
What an event stage fabrication quote should itemise
An itemised quote is not a courtesy, it is the only format in which a price can be checked. Each line is something you can question, reduce or delete; a single figure is something you can only accept or refuse.
The exclusions are more informative than the inclusions. Transport back from the venue, the crew who put it up, the dismantle inside the organiser's window, the electrical fittings and the tax: ask about those five by name, because a quote rarely mentions what it has left out.
Three small lines are worth more than their value on experience and AV work: material certification, the organiser submission, and a named project manager with a telephone number. Each is cheap to include and painful to arrange once the hall has opened its doors to build-up.
- Installation, the on-site crew, and who supervises them
- GST, shown as a figure rather than as a footnote
- Fire-retardant certification for the materials being used
- Night-shift or overtime labour, if the build-up window forces it
- Transport to the venue and the return leg, stated separately
- Graphics proofing, and what happens if a panel has to be reprinted
- Truss and wooden stage sets
- Printed and LED backdrops
- Ramps, podiums and props
- Load-tested structures
Thirty-six square metres, costed properly
An example is worth more than a range. This one is 36 sq.m, with the structure costed at the bottom of the published band, ₹9,000 per sq.m, and every other scope on its own line, the way an itemised quote should arrive.
At ₹6,73,000 this stand works out at roughly ₹18,694 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹3,49,000, a little more than the fabrication itself.
Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 36 sq.m of structure is ₹6,48,000 rather than ₹3,24,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.
| Structure and joinery (36 sq.m × ₹9,000) | ₹3,24,000 |
|---|---|
| Raised flooring and carpet | ₹43,000 |
| Furniture — counters, seating, planters | ₹38,000 |
| Graphics — brand wall, tensioned fabric and vinyl | ₹97,000 |
| Lighting — track, aimed spots and backlit panels | ₹54,000 |
| Transport, both ways | ₹52,000 |
| Installation, crew and dismantle | ₹65,000 |
| Indicative total, before GST | ₹6,73,000 |
Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.
Area against finish: what the band actually means
The band is a range, not a price, and its two ends buy very different stands. At any given size, the lower figure is the plain version and the upper is the premium one — and because the upper is twice the lower, the premium version of a stand costs the same as the plain version of twice the area. Here is that worked out at common sizes.
Notice the symmetry in the middle two columns: the spread at any size is the lower figure again, because ₹18,000 minus ₹9,000 is ₹9,000. So the question "should I take more area or better finish?" is, at the published band, an exactly even trade. That is unusually clean, and it makes the decision a strategic one rather than an arithmetical one.
The honest rule is that area serves activity and finish serves belief. Demonstrations, queues, meetings and products that must be touched all need floor, and no amount of veneer compensates for a stand people cannot get into. A launch, a new category entry, or a brand that has to look established needs finish, and does better with a smaller, denser, well-lit stand than with a larger plain one.
| Stall size | Plain finish, build only | Premium finish, build only | What separates the two |
|---|---|---|---|
| 24 sq.m | ₹2,16,000 | ₹4,32,000 | A branded floor, a demo counter that actually works, and a spare hero panel |
| 36 sq.m | ₹3,24,000 | ₹6,48,000 | Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner |
| 54 sq.m | ₹4,86,000 | ₹9,72,000 | Double-height brand elements, integrated AV and a storage wall that hides the cartons |
| 72 sq.m | ₹6,48,000 | ₹12,96,000 | Architectural form — curves, a ceiling element, and a stand that reads as a building |
| 100 sq.m | ₹9,00,000 | ₹18,00,000 | All of the above, plus the engineering a raised or second-storey element needs |
Both columns are build only, at the two ends of the published band. Read them as the first line of a quote rather than as a quote.
Reading the gap between two quotes
The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.
We have itemised the gap below rather than describing it. Starting from the 36 sq.m example at ₹6,73,000, six reasonable-sounding assumptions produce ₹5,23,000 instead. The ₹1,50,000 between them is 22% of the total, and every rupee of it is a decision about scope that the brief did not make.
What follows from that is a procurement rule rather than a design one: write the scope down, in your own words, before you ask for prices. Name the board, the graphics medium, the fixture count, the flooring type, the furniture list and the crew. Then the quotes you get back are comparable, and the cheapest of them may genuinely be the right one.
| Where quotes diverge | What each vendor has assumed | Ask this and the gap closes |
|---|---|---|
| Structure | Ply and MDF to a finished edge in one quote, a lighter board with an exposed edge in the other | Name the board, the thickness and the edge finish |
| Taxes | One total is before tax and the other after it | Give me both the pre-tax and the post-tax figure |
| Who builds it | One quote comes from the workshop; the other from somebody who will find one | Whose workshop is it, and may we see a build in progress? |
| Flooring | A raised platform with cable management against carpet on the hall floor | Raised or not, and where do the cables run? |
| Drawings and approvals | One vendor is preparing the organiser submission; the other expects you to | Who prepares the drawings, and who submits them? |
| Electrical | The organiser's power charge, the stand's own wiring, or neither | Who pays the organiser, and who wires the stand? |
| Graphics | Tensioned fabric on a frame against printed flex taped to a panel | What is it printed on, and how is it fixed to the wall? |
| Furniture | Hired against fabricated, and a four-piece package against an eight-piece one | List the pieces, and say which are hired and which are built |
None of these rows implies bad faith. They are all consequences of a brief that left a decision open, which is why the brief is the cheapest place to fix them.
| Lighter board in the structure, with an exposed edge instead of a finished one | ₹42,000 |
|---|---|
| Printed flex taped to panels instead of tensioned fabric on a frame | ₹26,000 |
| Six aimed spots instead of fourteen, and no backlit panel | ₹18,000 |
| Carpet laid straight on the hall floor instead of a raised platform with cable management | ₹21,000 |
| A four-piece hired furniture package instead of eight pieces | ₹12,000 |
| Installation and dismantle left as "to be advised" | ₹31,000 |
| Total difference between the two quotes | ₹1,50,000 |
Illustrative, built by making six substitutions to the 36 sq.m example above. The higher quote is ₹6,73,000 and the lower is ₹5,23,000; the difference is ₹1,50,000, 22% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.
Where to cut, and where cutting costs more
Not every line in a quote is load-bearing, and not every cheap line is optional. The distinction is worth learning properly, because the expensive mistakes in exhibiting are almost all deletions that came back — on the first morning, in the organiser's window, at somebody else's rates.
Apply a single test to every candidate for deletion: if it is missing, who handles it and where? Anything that ends up being handled at the venue has not been saved. Site is the most expensive place on earth to buy a sheet of board, an electrician's hour or a reprint.
Below: the real options as a list, then the false economies as a table. Read the list first if you are over budget, because the savings in it are larger and none of them will be visible from the aisle.
- A second set of graphics for a message you have not tested on anybody yet
- A second screen that repeats what the first screen is already showing
- Veneer or PU paint where a good laminate reads identically from the aisle
- A ceiling or hanging element, unless the stand has to be found from across the hall
- Backlighting on every panel, rather than on the one panel you want looked at
- Fabricated furniture, where hired furniture would have been collected afterwards anyway
| Line | Why it looks optional | What actually happens if you cut it |
|---|---|---|
| Raised flooring | Carpet on the hall floor costs less | The cables then run under the carpet, and every visitor finds them with their feet |
| Fire-retardant certified material | Nobody asks to see the certificate | The venue safety officer asks, and an uncertified panel is refused at the hall door on the first morning |
| Supervision during build-up | The crew knows the drawing | When a drawing and a wall disagree, somebody has to have the authority to decide, on the spot, in the organiser's window |
| Storage between shows | We will decide after this one | "After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable |
| Dismantle and clearance | The show is over by then | The organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards |
| One spare panel for the hero wall | It will be fine | A scuffed hero panel is the one thing every photograph of the stand will show |
| The cable and socket count on the drawing | That is site detail | Site detail becomes a visible extension lead across the floor of a stand you paid to look expensive |
None of these are large figures in a quote. All of them are large figures once the hall is open, which is the entire point of the table.
A saving that has to be dealt with on site is not a saving. It is a deferral with a surcharge.
What changing your mind costs, stage by stage
Changes are where budgets actually overrun, and they do not appear on any quote. What makes them expensive is timing rather than magnitude: moving an entrance is a conversation at concept stage, a redraw after sign-off, a rebuild in production, and an improvisation at the venue.
This is why the design stage deserves more of your time than it usually gets. 4 weeks is our schedule for 36 sq.m — 3 weeks base plus 1 for the area — and the hours you spend arguing about the layout in week one are the cheapest hours in the whole programme. A premium finish adds 2 weeks and a double-decker another 2, so the window is longer than most briefs assume and still not long enough for a change of mind in production.
Two habits keep this under control. Name one approver on your side, so that a change is a decision rather than a negotiation. And ask, before the first payment, how variations are priced and approved — in writing, with a figure confirmed before work starts, rather than appearing on a final invoice as a surprise.
| Point in the programme | Cost of a change here | The reason |
|---|---|---|
| While the concept is being designed | Time, and nothing else | Nothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it |
| After design sign-off, before production | A redraw and a requote | Drawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you |
| After materials are ordered | The material, plus its replacement | Board, laminate and print are bought to a cutting list. A changed dimension turns the ordered sheet into offcuts |
| In production | The labour already spent, plus the labour to redo it | A fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved |
| After graphics go to print | A full reprint of the affected panel | Large-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment |
| After dispatch | Freight both ways, and a hole in the build schedule | The panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience |
Nothing in this table is a penalty. Each row is simply work that has to be done twice, plus whatever the first attempt cost in material.
Exhibiting soon? Let's build your stall.
Working back from the number you have
Most exhibitors do not start with a design, they start with a number. Working backwards from that number is a more reliable method than briefing a design and discovering afterwards what it costs — and it has one step that nearly everybody misses, which is subtracting the costs that no stand builder will ever quote you.
What follows is the list of costs no stand builder will quote you, and then one way to split a total, shown against ₹10,00,000. Treat it as an illustration and not as a benchmark — there is no published standard and we are not inventing one. Its useful feature is the last two lines: ₹9,00,000 is what a builder quotes against, ₹1,00,000 is yours alone, and ₹50,000 of the total is held back rather than committed.
That leaves ₹4,50,000 for the build itself in this illustration, which at ₹9,000 per sq.m is 50 sq.m of structure, or 25 sq.m at ₹18,000. Compare that with the area you have actually booked and you will know immediately whether your budget and your floor plan are in agreement — and if they are not, you have found it out at the right time, which is before the design.
- Storage of reusable elements between this edition and the next
- The organiser's power connection, charged against the load you declare
- Exhibitor badges, extra passes and vehicle parking
- Printed collateral, samples, and anything you intend to hand over
- Lead-capture devices, the data connection, and somewhere to charge them
- Product freight — the goods on display travel separately from the stand that holds them
- Travel, hotels and local transport for everyone who will stand on the stand
- Photography and video of the finished stand, which is the asset you use all year
| Allocation | Share | Illustrative amount |
|---|---|---|
| Stand build — structure, joinery and finish | 45% | ₹4,50,000 |
| Graphics, lighting and AV | 20% | ₹2,00,000 |
| Flooring and furniture | 10% | ₹1,00,000 |
| Transport, installation and dismantle | 15% | ₹1,50,000 |
| Your own show costs — travel, staffing, collateral, hospitality | 5% | ₹50,000 |
| Contingency, held back rather than allocated at briefing | 5% | ₹50,000 |
Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹10,00,000. The first four rows, ₹9,00,000, are what a stand builder quotes against. GST sits on top.
What you get for the money at each size
Before comparing prices per square metre, look at what a square metre does. Our planner's ratios are simple: storage at 10% up to 18 sq.m and 15% beyond it, a default 5% for a meeting corner, and the balance as display. Apply them and most stall-size arguments resolve themselves.
Read the visitor column as a constraint rather than as information. It is display area divided by 2.5, and if your footfall expectation implies more people in the stand at once than that, the thing standing in the way is the floor plan, not the campaign.
The build-weeks column is a budget column in disguise. Our schedule is 3 weeks base, +1 from 24 sq.m, +2 from 54 sq.m, +2 for a premium finish and +2 for a double-decker. Compressing it does not reduce the work; it relocates the work to night shifts and rush rates.
| Area booked | Display | Storage | Staff | Visitors at once | Lead time |
|---|---|---|---|---|---|
| 9 sq.m | 7.6 sq.m | 0.9 sq.m | 2 | 3 | 3 |
| 12 sq.m | 10.2 sq.m | 1.2 sq.m | 2 | 4 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
| 72 sq.m | 57.6 sq.m | 10.8 sq.m | 8 | 23 | 5 |
Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.
Milestones that correspond to something
We will not quote you a standard payment split, because there is not one to quote. What matters more than the percentages is whether each stage is attached to something you can verify. Terms are agreed in the quote; this section is about what to ask for inside them.
Hold to a single principle and the rest follows: no payment stage without a deliverable attached. The deliverables are obvious once you ask for them — the approved drawing set, the materials on the floor, the dry assembly, the finished stand — and each one is something you or a colleague can physically verify.
The item to settle alongside the schedule is how changes get priced. Who approves them on your side, in what format, and is the figure confirmed before work starts? Nearly every uncomfortable conversation about an exhibition invoice began as a change that nobody priced at the moment it was agreed.
01
Name one approver on your side
One person signs the drawing, the finish schedule and every variation. Two approvers with different opinions is the most expensive organisational structure in exhibiting, because the cost of resolving them lands in production.
02
Write the variation process down before there is a variation
Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.
03
Keep the organiser's bills on a separate line
Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.
04
Ask what happens if the show moves
Editions get postponed and dates shift. Ask what is recoverable and what is not if that happens, and at which stage the answer changes — the honest answer is different before materials are ordered and after a wall has been built.
05
Ask for the schedule inside the quote
Payment terms belong in the same document as the itemised scope, not in a separate message afterwards. If the stages and the deliverables are written on one page, you can see whether they line up — and if they do not, that is a conversation to have before you sign rather than in week three.
06
Keep something payable after handover
Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.
Agree how changes are priced before there is a change to price.
How the cost per show falls across a year
Everything above prices a single appearance. If you exhibit more than once a year, that is the wrong unit, and using it is the most expensive accounting mistake in exhibiting. The right unit is the cost per show across the programme, and it falls sharply after the first outing if — and only if — the first stand was designed to come apart and go back together.
The second outing is costed in full in the example on this page. The structure, having been stored, does not reappear: what remains is a graphics reprint for the new message, refurbishment of what got marked, storage between the two shows, and the same transport and installation as before. That comes to ₹2,15,000 against the first show's ₹6,73,000 — 32% of it — because ₹4,58,000 of the first build is not bought a second time.
The table follows it across three shows, and the average per show falls from ₹6,73,000 to ₹4,44,000 and then to about ₹3,67,667 — a fall of 45% against the first outing, with nothing negotiated and no corner cut. That is the strongest cost lever in exhibiting, and it is available only to exhibitors who asked for it before the first stand was built.
Three conditions have to hold, and they are all specification rather than luck. The structure has to be modular, dismantled in panels rather than broken down. The graphics have to be a separate layer — fabric on a frame, reprinted rather than rebuilt. And somewhere has to store it, which is a real cost and appears as a line in the example rather than being quietly ignored.
| Edition | Cost of this one | Total so far | Average per show |
|---|---|---|---|
| Show 1 — the first build | ₹6,73,000 | ₹6,73,000 | ₹6,73,000 |
| Show 2 — same structure, new graphics | ₹2,15,000 | ₹8,88,000 | ₹4,44,000 |
| Show 3 — same structure, new graphics | ₹2,15,000 | ₹11,03,000 | ₹3,67,667 |
Illustrative, built from the two worked examples on this page: ₹6,73,000 for the first build and ₹2,15,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.
| Graphics reprinted for the new show and the new message | ₹48,000 |
|---|---|
| Refurbishment — replaced panels, touch-up paint, relaminating what is marked | ₹32,000 |
| Storage of the structure between the two shows | ₹18,000 |
| Transport, both ways | ₹52,000 |
| Installation, crew and dismantle | ₹65,000 |
| Indicative second-show total, before GST | ₹2,15,000 |
Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹6,73,000, this is 32%, so ₹4,58,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.
How to reduce cost without looking cheap
Spend on the elements visitors notice in the first three seconds from the aisle — the brand wall, the lighting and the hero product position — and save on hidden structure, storage and anything above the sightline.
Reuse modular frames, graphics systems and furniture across shows, choose fabric graphics over rigid printed panels where the design allows, and bundle design, build and AV with one partner so you are not paying three margins and reconciling three schedules.
Protect the lighting line. The hall lights the aisles, not your stand, and an under-lit stand looks cheap however much the joinery cost — it is the smallest line with the largest visible return.
One qualification on the whole list: timing. Each of these is a genuine saving if it is decided before the brief is frozen and an expensive change if it is decided afterwards. Hiring furniture is cheaper than building it; deciding to hire it after it has been built is not.
- Freeze the layout once and leave it frozen, because the expensive version of every saving is a change
- One strong message instead of five competing ones, which is cheaper and also works better
- Keep graphics on fabric, so the next edition is a reprint instead of a rebuild
- Book early: rush charges and night-shift labour are avoidable rather than inevitable
- Share a lorry with your own product freight, if the dates allow it
- Print one hero graphic properly and keep everything around it plain
- Reuse a modular structure across several shows — the second outing costs a fraction of the first
What goes wrong with event stage fabrication quotes
The three failures that cost exhibitors real money on event stage fabrication are all avoidable at quoting stage. Under-specified equipment that looks dull in a bright hall. That is settled at quoting stage rather than at the venue, and the fix is to ask what the quote actually specifies, and who will physically do the work, before you compare totals.
The second failure is unwritten scope. A quote that does not name the board, the fixture count and the flooring type is a quote for an unspecified stand, and two such quotes cannot be compared with each other at all.
The last of the three is subtler. The quote was right; the job changed. Half a dozen small additions after sign-off, none of them priced at the time, and the final figure is not the one anybody approved — which is an argument for agreeing the variation process at the same moment as the price.
- Content not built for the actual screen or surface size
- Under-specified equipment that looks dull in a bright hall
- No rehearsal or technical run before doors open
- Missing backup power or spare units
Get an accurate price
Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised event stage fabrication quote within about two days.
We design free with every confirmed fabrication order, fabricate in our own workshops, prepare the organiser drawings and approvals, and put one project manager on the job from brief to dismantle. Quoted per event.
One closing piece of advice that applies to every vendor including us. Ask for the itemised scope, ask explicitly what is excluded, and ask how variations are priced. A supplier who answers all three without hesitation is telling you something useful about how the build will go.
Frequently asked questions
Is GST included in event stage fabrication quotes?+
A quote should say so on its face. Ask for the pre-tax total and the post-tax total, because two vendors quoting on different bases will look further apart, or closer together, than they actually are.
When is payment due?+
Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.
Does reusing a stand really lower the cost?+
Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹2,15,000 rather than ₹6,73,000 — 32% of the first show — because ₹4,58,000 of the first build is not bought again. Across three shows the average falls to about ₹3,67,667.
How far ahead should I book to avoid rush costs?+
Our own lead times are 3 weeks for a small stall, 4 from 24 sq.m and 5 from 54 sq.m, with another 2 for a premium finish and 2 for a double-decker. Work backwards from the build-up date and add your own approval rounds — those, not fabrication, are what usually makes a job late and therefore expensive.
Do you charge separately for design?+
3D design is free with every confirmed fabrication order, and revised until you approve it. Design-only projects are quoted per stall.
Why do two quotes for the same brief differ so much?+
Almost always because they describe two different stands. On the illustrative 36 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹1,50,000, or 22% of ₹6,73,000. Ask both vendors to itemise against the same written scope and the gap explains itself.
How much contingency should I hold back?+
Enough to absorb one change you have not thought of yet. The illustrative allocation on this page holds back ₹50,000 of ₹10,00,000, which is a planning habit rather than a published rule — set your own figure, but set it before briefing, because a contingency invented afterwards is just an overrun.
Who pays the organiser for space and power?+
You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.
Is the cheapest quote ever the right one?+
Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.
Event Stage Fabrication near you
Our crews deliver event stage fabrication in every major Indian city.
