By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 17 min read
Short answer
From ₹60,000 per kiosk. What moves the number for kiosk design is number of concept options and revision rounds, depth of 3D work (stills, 360° views or walkthrough video) and technical drawing detail required by the organiser — and what makes two numbers incomparable is scope that nobody wrote down. Send the show, the city, the dates, the area, the open sides and two reference images, and ask for the quote itemised line by line.
Key takeaways
- Reuse beats negotiation. A second outing with the same structure is 36% of the first show's figure, with nothing haggled.
- Every budget overrun has a date on it, and the date is always after design sign-off.
- From ₹60,000 per kiosk.
- Before anything else, settle number of concept options and revision rounds and depth of 3D work (stills, 360° views or walkthrough video) — the rest of the quote follows from them.
- Always compare itemised quotes, not lump sums — the cheapest total is usually the one with the most left out.
- Transport, installation, dismantle and taxes are separate lines. Confirm they are in the figure you are comparing.
What kiosk design costs in India
Compact branded kiosks for retail activations, sampling and sales points.
From ₹60,000 per kiosk. Expect a modest premium in Delhi NCR, Mumbai and Bengaluru, driven by venue labour rules and compressed build-up windows rather than by the build itself. A Tier 2 city planned four weeks out is frequently the cheapest version of the same stand.
Work from ₹9,000–₹18,000 per sq.m for a custom build. Modular and octanorm construction undercuts it because the structure is hired or reused; a shell scheme upgrade undercuts that again because the organiser already supplied the walls. The right choice depends far more on how often you exhibit than on this year's budget.
Note the span: top of band to bottom of band is a factor of 2, exactly. That makes the first real budget question not "how much" but "which" — the same build money is a stand of a given area at a plain finish, or half that area at a premium one. Decide that before the concept, because it changes the layout, not just the specification.
| Construction type | Relative cost | What you keep afterwards |
|---|---|---|
| Shell scheme upgrade | Lowest | Graphics only |
| Octanorm / system build | Low | Frame and graphics |
| Modular with custom graphics | Medium | Frame, graphics, furniture |
| Custom wooden build | ₹9,000–₹18,000/sq.m | Limited |
| Double-decker | Quoted per project | Structure, with engineering |
Reuse is the column that decides cost over a year of shows, rather than cost at this one. Read it before the cost column if you exhibit more than twice.
What actually moves a kiosk design price
Price every kiosk design enquiry against the same short list and vendor comparison stops being guesswork. Each line below is something you can change; the total is only what they add up to.
Two numbers set the budget before anyone opens a sketchbook: how many square metres you booked and how many of its sides are open. An island stand is not a more expensive taste, it is four finished faces instead of one.
Then there is the pair nobody prices at briefing stage: lead time and finish level. 3 weeks is the schedule for 18 sq.m — take that away and you have not saved anything, you have bought the same work on an overtime shift. Finish is the other one: specify veneer where laminate would read identically from the aisle and you have spent the lighting budget on something visitors cannot see.
- Number of concept options and revision rounds
- Depth of 3D work (stills, 360° views or walkthrough video)
- Technical drawing detail required by the organiser
- Whether design is bundled with fabrication
- Anything the organiser has to sign off: height, rigging, a raised floor, a second storey
- How far the workshop is from the venue, and whether a lorry can reach the hall door
- The number of approval rounds before the drawing is frozen
- How much of the stand has to be new, and how much can come out of storage
The cheapest quote is usually the one with the most left out.
Reading a kiosk design quote properly
Insist on the itemisation before you discuss the total. Every line is a decision somebody made on your behalf, and some of those decisions are ones you would have made differently if you had been shown them.
Ask specifically whether transport, installation, dismantle, electrical fittings and taxes are inside the figure. Those four lines are the ones most often excluded, and together they are not small.
For design-led work there are a few lines beyond the obvious ones that belong on the page: the certification the venue will ask for, the drawings the organiser will ask for, and the person whose phone you will be ringing at seven in the morning on build-up day. None of those are large figures. All of them are expensive to arrange late.
- Transport to the venue and the return leg, stated separately
- Mall and airport compliant
- Storage and lockable counters
- Digital screens
- Reusable builds
- Graphics proofing, and what happens if a panel has to be reprinted
- Fire-retardant certification for the materials being used
- Storage of reusable elements after the show, and for how long
- Dismantle and clearing the stand inside the organiser's window
- Organiser drawing submission and approval handling
Eighteen square metres, costed properly
Work one example through properly and the subject becomes concrete. Below is 18 sq.m of custom build: the structure at ₹9,000 per sq.m — the lower end of the published band — and then each of the scopes that a single figure would have hidden.
At ₹3,80,000 this stand works out at roughly ₹21,111 per sq.m all-in, which is the number worth comparing between vendors. Note how much of it is not the stand: graphics, lighting, flooring, furniture, transport and crew together come to ₹2,18,000, comfortably more than the fabrication itself.
Two caveats, both of which matter when you use this to plan. The structure line sits at the bottom of the band, so a premium finish moves it upward — at the top of the band the same 18 sq.m of structure is ₹3,24,000 rather than ₹1,62,000. And GST sits on top of the whole thing. Treat the figure as a planning number, not as a quotation.
| Structure and joinery (18 sq.m × ₹9,000) | ₹1,62,000 |
|---|---|
| Furniture — counters, seating, planters | ₹24,000 |
| Graphics — brand wall, tensioned fabric and vinyl | ₹56,000 |
| Lighting — track, aimed spots and backlit panels | ₹34,000 |
| Raised flooring and carpet | ₹26,000 |
| Transport, both ways | ₹34,000 |
| Installation, crew and dismantle | ₹44,000 |
| Indicative total, before GST | ₹3,80,000 |
Illustrative only, using the published ₹9,000–₹18,000 per sq.m band at its lower end for the structure line. The remaining lines are planning figures rather than a quotation, and your own will differ with finish level, city, venue rules and how much AV you add. GST is extra. Space rental, power, badges, travel and your own team's time are not in this figure — they are invoiced by the organiser or by nobody at all.
What the same budget buys at different sizes
Because the top of the published band is twice the bottom, every build budget describes two possible stands: a larger one at a plain finish, or one of half the area at a premium one. The table below is that arithmetic at the sizes exhibitors actually book. The right-hand column is what the spread between the two ends of the band is actually spent on.
The arithmetic has a tidy consequence. ₹18,000 less ₹9,000 is ₹9,000, which is the lower figure, so the money that upgrades a stand from the bottom of the band to the top would instead have doubled its area. Whichever you pick, you are spending the same amount — which means the decision is about what the stand has to do, not about what it costs.
Which way to go depends on what the stand has to achieve. If visitors need to handle the product, queue for a demonstration or sit down with somebody, area wins: a crowded premium stand turns people away, and the finish is wasted on the backs of their heads. If the job is credibility — a launch, a first appearance in a category, a stand that has to look like the market leader's — finish wins, and a smaller, denser, better-lit stand does it better than a large plain one.
| Stall size | Build at ₹9,000/sq.m | Build at ₹18,000/sq.m | What the difference buys |
|---|---|---|---|
| 9 sq.m | ₹81,000 | ₹1,62,000 | Better print, aimed light instead of clip lamps, and an edge finish that survives the week |
| 18 sq.m | ₹1,62,000 | ₹3,24,000 | A raised floor, aimed lighting and furniture you do not have to apologise for |
| 24 sq.m | ₹2,16,000 | ₹4,32,000 | A branded floor, a demo counter that actually works, and a spare hero panel |
| 36 sq.m | ₹3,24,000 | ₹6,48,000 | Veneer or PU paint in place of laminate, backlit panels and a screened meeting corner |
| 54 sq.m | ₹4,86,000 | ₹9,72,000 | Double-height brand elements, integrated AV and a storage wall that hides the cartons |
These columns are the structure line and nothing else — the same line that is ₹1,62,000 in the 18 sq.m example above. Everything else on that example is additional at every size here.
Where the difference between two prices lives
The question we are asked most often is why one vendor has quoted substantially less than another for what looks like the same stand. The answer is almost never margin. It is that the two quotes describe two different stands, and the brief was not specific enough to prevent that.
The arithmetic below is the whole phenomenon in one table. Take the 18 sq.m example and make six substitutions a vendor could defend in a meeting, and ₹3,80,000 becomes ₹2,87,000. The 24% difference — ₹93,000 — is entirely scope, and none of it is visible in a lump-sum comparison.
The remedy is unglamorous. Write the specification yourself — board, graphics medium, number of fixtures, flooring type, furniture list, crew and shift — and send the same page to everybody. The prices that come back will be close together, and you will be choosing a vendor rather than guessing at a scope.
| Where quotes diverge | What each vendor has assumed | Ask this and the gap closes |
|---|---|---|
| Drawings and approvals | One vendor is preparing the organiser submission; the other expects you to | Who prepares the drawings, and who submits them? |
| Taxes | One total is before tax and the other after it | Give me both the pre-tax and the post-tax figure |
| Graphics | Tensioned fabric on a frame against printed flex taped to a panel | What is it printed on, and how is it fixed to the wall? |
| Lighting | Fourteen aimed fixtures against six, or against none at all | How many fixtures, of what type, aimed at what? |
| Furniture | Hired against fabricated, and a four-piece package against an eight-piece one | List the pieces, and say which are hired and which are built |
| Structure | Ply and MDF to a finished edge in one quote, a lighter board with an exposed edge in the other | Name the board, the thickness and the edge finish |
| Who builds it | One quote comes from the workshop; the other from somebody who will find one | Whose workshop is it, and may we see a build in progress? |
| Flooring | A raised platform with cable management against carpet on the hall floor | Raised or not, and where do the cables run? |
None of these rows implies bad faith. They are all consequences of a brief that left a decision open, which is why the brief is the cheapest place to fix them.
| Installation and dismantle left as "to be advised" | ₹21,000 |
|---|---|
| Lighter board in the structure, with an exposed edge instead of a finished one | ₹24,000 |
| Printed flex taped to panels instead of tensioned fabric on a frame | ₹16,000 |
| Six aimed spots instead of fourteen, and no backlit panel | ₹11,000 |
| Carpet laid straight on the hall floor instead of a raised platform with cable management | ₹13,000 |
| A four-piece hired furniture package instead of eight pieces | ₹8,000 |
| Total difference between the two quotes | ₹93,000 |
Illustrative, built by making six substitutions to the 18 sq.m example above. The higher quote is ₹3,80,000 and the lower is ₹2,87,000; the difference is ₹93,000, 24% of the higher figure. None of these substitutions is dishonest — each is a decision the brief failed to make — and none of them is visible unless both quotes are itemised. Figures are planning numbers, not a quotation, and GST is extra on both.
What is optional, and what only looks optional
There are two kinds of saving in a stall quote. One kind removes something nobody was going to look at. The other removes something that then has to be dealt with on site, at site prices, by people with the wrong tools. The lines look identical on paper.
Apply a single test to every candidate for deletion: if it is missing, who handles it and where? Anything that ends up being handled at the venue has not been saved. Site is the most expensive place on earth to buy a sheet of board, an electrician's hour or a reprint.
Below: the real options as a list, then the false economies as a table. Read the list first if you are over budget, because the savings in it are larger and none of them will be visible from the aisle.
- A model, a mock-up or a prop that duplicates something the product already demonstrates
- Wall height above the sightline, which costs material and is read by nobody
- Giveaways in quantity, which measure footfall rather than interest
- A ceiling or hanging element, unless the stand has to be found from across the hall
- A second set of graphics for a message you have not tested on anybody yet
- Fabricated furniture, where hired furniture would have been collected afterwards anyway
| What exhibitors delete first | The reasoning at the time | Where it turns up again |
|---|---|---|
| A single project manager | Each vendor manages themselves | Then every gap between vendors is yours to discover, usually at eight o'clock on the first morning |
| Raised flooring | Carpet on the hall floor costs less | The cables then run under the carpet, and every visitor finds them with their feet |
| Pre-build at the workshop | The crew can assemble it on site | Site is where there is no spare panel, no saw and no time. A dry run finds the problem while it is still cheap |
| Packing crates and transport cover | It travelled fine last time | Once is not a plan. A cracked acrylic panel is a reprint, a lorry and a lost day |
| A graphics proofing round | The artwork is final | Large-format print is where a wrong size and a missing bleed turn into a full reprint of the hero wall |
| Storage between shows | We will decide after this one | "After this one" is a fortnight of the structure stacked in a corner, which is where reusable elements stop being reusable |
| Dismantle and clearance | The show is over by then | The organiser charges for whatever is still in the hall when the window closes, and the charge is not negotiated afterwards |
If the budget genuinely will not stretch, cut from the list below this table instead. These lines are the ones that cost more when they are missing.
The venue is the most expensive shop in India, and it only opens when you have run out of time.
What changing your mind costs, stage by stage
The single largest controllable item in most stall budgets is not a line on the quote at all. It is the cost of changes, and it rises steeply with the stage at which the change arrives. The same decision — move the entrance, change the logo size, add a screen — costs nothing in week one and a night shift in the last week.
The practical consequence is to front-load the arguing. With 3 weeks on the schedule for 18 sq.m, every disagreement settled before sign-off is free and every one settled afterwards has a price. Add 2 weeks for a premium finish or 2 for a double-decker element, and the calendar is still unforgiving once production has started.
There are two defences, and both are administrative. One approver on your side, with the authority to sign the drawing and the finish schedule. And an agreed variation process: who asks, who approves, and whether the price is confirmed before the work happens. Both cost nothing and both prevent the expensive version of this table.
| When the change comes | What it costs | Why |
|---|---|---|
| While the concept is being designed | Time, and nothing else | Nothing has been drawn to scale, priced, cut or ordered. This is the only stage where changing your mind is free, which is the argument for spending longer in it |
| After design sign-off, before production | A redraw and a requote | Drawings have gone to the organiser and materials have been priced against them. Both have to be done again, and the organiser's queue does not restart for you |
| In production | The labour already spent, plus the labour to redo it | A fabricated wall is days of somebody's bench. Changing it means buying those days twice, inside a window that has not moved |
| After graphics go to print | A full reprint of the affected panel | Large-format print has no partial fix. A logo at the wrong size is a new panel, not an amendment |
| After dispatch | Freight both ways, and a hole in the build schedule | The panel is on a lorry. The alternative is a modification on site, with the wrong tools and an audience |
| Once the show has opened | Usually nothing can be done at all | The hall is open and the stand is public. The only honest response is to write it down for the next edition |
The pattern is the whole lesson: the cost of a change is set by what has already been bought, drawn or built, not by how large the change is.
Exhibiting soon? Let's build your stall.
If the total is fixed, start there
If the total is already fixed, plan from the total. It works better than designing first and pricing afterwards, and it forces the one calculation most exhibitors postpone: how much of this money is never going to reach the stand, because it belongs to the organiser, the airline, the hotel and the print shop.
After the list of costs that never reach a stall quote comes a worked allocation of ₹6,00,000, offered as an illustration rather than as a standard, because no standard exists that we could honestly cite. Read it from the bottom: ₹30,000 unallocated, ₹60,000 of costs no stand quote will carry, and ₹5,40,000 — 90% — left for the stand itself.
That leaves ₹2,70,000 for the build itself in this illustration, which at ₹9,000 per sq.m is 30 sq.m of structure, or 15 sq.m at ₹18,000. Compare that with the area you have actually booked and you will know immediately whether your budget and your floor plan are in agreement — and if they are not, you have found it out at the right time, which is before the design.
- Hospitality: tea, coffee, water, and whatever the meeting corner is going to serve
- Insurance on goods in transit and on the stand itself
- The organiser's power connection, charged against the load you declare
- Exhibitor badges, extra passes and vehicle parking
- Printed collateral, samples, and anything you intend to hand over
- Photography and video of the finished stand, which is the asset you use all year
- Lead-capture devices, the data connection, and somewhere to charge them
- Product freight — the goods on display travel separately from the stand that holds them
| Budget line | Illustrative share | At a total of ₹6,00,000 |
|---|---|---|
| Stand build — structure, joinery and finish | 45% | ₹2,70,000 |
| Graphics, lighting and AV | 20% | ₹1,20,000 |
| Flooring and furniture | 10% | ₹60,000 |
| Transport, installation and dismantle | 15% | ₹90,000 |
| Your own show costs — travel, staffing, collateral, hospitality | 5% | ₹30,000 |
| Contingency, held back rather than allocated at briefing | 5% | ₹30,000 |
Illustrative only. There is no published standard split and this is not offered as one — it is a planning habit, shown with the arithmetic visible so you can substitute your own shares. The shares are whole percentages summing to 100, so the amounts total exactly ₹6,00,000. The first four rows, ₹5,40,000, are what a stand builder quotes against. GST sits on top.
What the area actually gives you
Before comparing prices per square metre, look at what a square metre does. Our planner's ratios are simple: storage at 10% up to 18 sq.m and 15% beyond it, a default 5% for a meeting corner, and the balance as display. Apply them and most stall-size arguments resolve themselves.
The visitors column is the one most exhibitors never calculate. Divide display area by 2.5 and you get roughly how many visitors can stand in the stand at once — which tells you whether your staffing plan and your footfall expectation are compatible.
Lead time belongs in a cost conversation because it is a cost. 3 weeks is the base, plus 1 week from 24 sq.m and 2 from 54 sq.m, with 2 more for a premium finish and 2 for a double-decker. Book inside those windows and the same stand costs more, because the work moves on to shifts that cost more.
| Stall size | Display area | Storage | Staff needed | Visitors at once | Build weeks |
|---|---|---|---|---|---|
| 9 sq.m | 7.6 sq.m | 0.9 sq.m | 2 | 3 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
| 100 sq.m | 80 sq.m | 15 sq.m | 12 | 32 | 5 |
Staff = area ÷ 9, minimum 2. Visitors = display ÷ 2.5, minimum 3. Lead time is 3 weeks base, +1 from 24 sq.m and +2 from 54 sq.m.
Payment, milestones and what each one should mean
We will not quote you a standard payment split, because there is not one to quote. What matters more than the percentages is whether each stage is attached to something you can verify. Terms are agreed in the quote; this section is about what to ask for inside them.
The principle is that a payment stage should correspond to a deliverable rather than to a date. Approved drawings exist or they do not. Materials are on the shop floor or they are not. A pre-build can be walked around or it cannot. The stand is standing at the venue or it is not. Each of those is checkable; "end of week two" is not.
One more thing belongs in this conversation, because it is where disputes actually start: the variation process. Agree, before the first payment, who on your side approves a change, in what format, and whether its price is confirmed before the work begins. Unpriced variations are where almost every uncomfortable conversation about an exhibition invoice begins, and they are the one budget risk that is entirely administrative to remove.
01
Keep something payable after handover
Snags are negotiated very differently depending on whether a balance is still outstanding. Agree in advance that a portion falls due after the stand is handed over complete at the venue, and agree what "complete" means while everyone is still calm.
02
Keep the organiser's bills on a separate line
Space rental, your power connection and your badges are invoiced by the organiser, not by the stand builder. Keep them in a different part of your own budget, so that stand quotes are only ever compared with stand quotes.
03
Write the variation process down before there is a variation
Agree who on your side can approve a change, in what format, and whether the price of that change is confirmed before the work starts. Most budget overruns are not one large surprise; they are six small changes that nobody priced at the moment they were agreed.
04
Get the tax position in writing
Ask for the pre-tax total, the post-tax total and the GST treatment stated on the face of the quote. It makes vendor comparison honest, and it stops your own finance team discovering the difference at the point of payment.
05
Confirm what the first payment actually unlocks
Ask the question plainly: what starts when this is paid, and what is the first thing I will be shown? A first payment that buys drawings and a materials order is a different thing from a first payment that buys a place in a queue, and the quote rarely distinguishes them unless you ask.
06
Tie every stage to something you can see
A milestone should correspond to a deliverable you can check with your own eyes: approved drawings, materials on the shop floor, a pre-build you can walk around, the stand standing complete at the venue. A date in a calendar is not a milestone, because a date arrives whether or not the work did.
A milestone with no deliverable attached is a date, and a date is not a milestone.
Reuse arithmetic: the second show is the cheap one
The arithmetic changes completely once you exhibit twice. Costing a stand against one show, when it will stand at three, overstates it by a wide margin; but it only overstates it if the stand was built to be reused, which is a decision made at design stage and cannot be made afterwards.
The worked example here is show two, with the same structure. Reprint the graphics, refurbish what the first show marked, pay for storage in between, and pay transport and installation again. ₹1,36,000 rather than ₹3,80,000: 36% of the first outing, with ₹2,44,000 of the original build simply not purchased again.
The table follows it across three shows, and the average per show falls from ₹3,80,000 to ₹2,58,000 and then to about ₹2,17,333 — a fall of 43% against the first outing, with nothing negotiated and no corner cut. That is the strongest cost lever in exhibiting, and it is available only to exhibitors who asked for it before the first stand was built.
It depends on three things being true. A modular structure that comes apart without damage; graphics as a removable layer rather than as part of the wall; and storage, which costs money and is therefore a line in the example rather than an assumption. Miss any one and the second show is close to the price of the first.
| Outing | This edition | Spent to date | Running average |
|---|---|---|---|
| Show 1 — the first build | ₹3,80,000 | ₹3,80,000 | ₹3,80,000 |
| Show 2 — same structure, new graphics | ₹1,36,000 | ₹5,16,000 | ₹2,58,000 |
| Show 3 — same structure, new graphics | ₹1,36,000 | ₹6,52,000 | ₹2,17,333 |
Illustrative, built from the two worked examples on this page: ₹3,80,000 for the first build and ₹1,36,000 for each subsequent outing with the same structure. The average is the cumulative figure divided by the number of shows, rounded. It assumes the stand is stored and reused rather than rebuilt, and that each show carries its own transport and installation — which it does.
| Graphics reprinted for the new show and the new message | ₹28,000 |
|---|---|
| Refurbishment — replaced panels, touch-up paint, relaminating what is marked | ₹18,000 |
| Storage of the structure between the two shows | ₹12,000 |
| Transport, both ways | ₹34,000 |
| Installation, crew and dismantle | ₹44,000 |
| Indicative second-show total, before GST | ₹1,36,000 |
Illustrative, and dependent on the first stand having been specified as modular. There is no structure line because the structure already exists; the refurbishment line is what a stored stand typically needs rather than a fixed figure. Against the first show's ₹3,80,000, this is 36%, so ₹2,44,000 of the original build is not purchased again. GST is extra. Space rental, power and badges are the organiser's invoices and appear in neither figure.
How to reduce cost without looking cheap
Budget by sightline. What faces the aisle deserves the spend; storage walls, back-of-house and anything above head height does not, because nobody is looking at it.
The structural saving is reuse: a modular frame with reprintable graphics turns the second show into a fraction of the first. Beyond that, hire the furniture, print on fabric rather than rigid board, and buy the whole scope from one place instead of paying three separate margins.
What not to cut is lighting. Hall lighting is designed for circulation, not for your product, so an unlit stand reads as under-funded no matter what the joinery cost. It is the cheapest line with the largest visible effect.
Read the list with the calendar in mind. These are savings at briefing stage and costs at any stage after it — a reprint instead of a rebuild saves money only if the design anticipated it, and a simpler footprint saves money only if the cutting list has not been written yet.
- One strong message instead of five competing ones, which is cheaper and also works better
- Choose a laminate that reads like veneer from a metre away, and spend the difference on light
- Book early: rush charges and night-shift labour are avoidable rather than inevitable
- Print one hero graphic properly and keep everything around it plain
- Share a lorry with your own product freight, if the dates allow it
- Keep the footprint simple — every curve, angle and radius is another line on the cutting list
- Upgrade a shell scheme instead of building raw space, for stalls under 18 sq.m
The three expensive failures
Three things go wrong often enough to be predictable, and all three are settled before anybody builds anything. The first: renders that cannot be built within the budget. It reads as a quality failure and it is really a specification one — ask what the quote names, and who will physically do the work, before comparing totals.
Next comes scope nobody wrote down — the single commonest cause of a quote that grows. Finish, fixture count, flooring type and furniture list: unnamed, each of them is an assumption, and the assumption will be resolved in the vendor's favour because you did not make it yourself.
And the third is the one that arrives latest: a total that was accurate on the day it was issued and no longer describes the job, because the brief kept moving. That is not the vendor's failure. It is what an unmanaged change process costs, and it is why a variation procedure belongs in the quote alongside the price.
- Designs that ignore organiser height and setback rules
- No material or finish specification, so the build looks different from the render
- Renders that cannot be built within the budget
Get an accurate price
Send the show name, city and dates, the area you have booked, how many sides are open, and a couple of reference images. That is a complete brief for pricing purposes, and it produces a concept and an itemised kiosk design quote within about two days.
We design free with every confirmed fabrication order, fabricate in our own workshops, prepare the organiser drawings and approvals, and put one project manager on the job from brief to dismantle. From ₹60,000 per kiosk.
One closing piece of advice that applies to every vendor including us. Ask for the itemised scope, ask explicitly what is excluded, and ask how variations are priced. A supplier who answers all three without hesitation is telling you something useful about how the build will go.
Frequently asked questions
How can I lower the cost without the stand looking cheap?+
Book early so no part of the job is paid at rush rates, reuse a modular frame, hire furniture rather than building it, keep graphics on fabric so the next edition is a reprint, and spend the saving on light. Lighting is the smallest significant line on a quote and the one with the largest visible effect.
Who pays the organiser for space and power?+
You do, directly. The organiser invoices space rental, the power connection and badges to the exhibitor. A stand builder quotes the stand, so if a quote appears to include space rental, that is the first thing to query.
Is the cheapest quote ever the right one?+
Yes, when it is the cheapest quote for the same written scope. That is a rarer event than it looks, which is why the scope has to be written down before the prices are compared rather than inferred from them afterwards.
When is payment due?+
Terms are agreed in the quote. Ask for the schedule in writing alongside the itemised scope, and check that each stage corresponds to something you can see — approved drawings, materials on the floor, a pre-build, the finished stand — rather than only to a date.
Does a bigger stand cost proportionally more?+
The build line scales with area at the published band — 30 sq.m of structure at ₹9,000 per sq.m is ₹2,70,000, and the same money buys 15 sq.m at ₹18,000. The lines that do not scale in a straight line are transport, crew and supervision, so ask your builder which of your lines move with area and which are closer to fixed.
What does a 18 sq.m stand cost?+
Using the published band, the structure alone is ₹1,62,000–₹3,24,000. Add graphics, lighting, flooring, furniture, transport and installation and the illustrative all-in figure on this page is ₹3,80,000 before GST — about ₹21,111 per sq.m — for a mid-finish custom stand.
Does reusing a stand really lower the cost?+
Directly, and more than negotiation does. On this page's illustrative figures a second outing with the same structure carries ₹1,36,000 rather than ₹3,80,000 — 36% of the first show — because ₹2,44,000 of the first build is not bought again. Across three shows the average falls to about ₹2,17,333.
What is never included in a stall quote?+
Space rental, your power connection and your exhibitor badges are invoiced by the organiser, not by us. Travel, hotels, your own team's time, product freight, hospitality and giveaways are yours too. On the illustrative split on this page they are ₹60,000 of ₹6,00,000 — small enough to forget and large enough to hurt.
Why do two quotes for the same brief differ so much?+
Almost always because they describe two different stands. On the illustrative 18 sq.m figures on this page, six substitutions — board, graphics medium, fixture count, flooring, furniture package and installation — account for ₹93,000, or 24% of ₹3,80,000. Ask both vendors to itemise against the same written scope and the gap explains itself.
Kiosk Design near you
Our crews deliver kiosk design in every major Indian city.
