By the Exhibition Stall Design editorial team · Updated 1 October 2026 · 13 min read
Short answer
The 15 questions worth asking a trade show booths vendor cover four things: who owns the work, what the price actually includes, what goes in writing before you pay, and who is in the hall during build-up. Judge the replies by shape rather than content — a name, a date, a document or a number is an answer, and anything that merely reassures you is not.
Key takeaways
- Get the project manager's name, the crew size and the build-up shift hours in writing.
- Ask what the quote excludes, never whether everything is included — the second question always gets a yes.
- Ask what the vendor would change about your brief. A supplier with no opinion is not reading it.
- Ask what your area can physically hold — at 36 sq.m the honest answer is about 11 visitors and 4 staff.
- Ask who physically does the work. Every other answer depends on it.
- Insist on approving dimensioned drawings rather than a render before fabrication starts.
How this interview works
Most vendor questionnaires fail for the same reason: they collect answers nobody knows how to read. Every firm says the work is in-house, every firm says the quote is all-inclusive, and every firm says their team will be on site. The useful skill is not asking the question — it is recognising, from the shape of the reply, whether the person answering has done this before.
Every question is therefore paired with its diagnosis. One test runs through all 15 of them — does the reply contain something verifiable? A strong trade show booths vendor produces a name, a date, a document or a figure. A weak one produces confidence, which is not the same thing and cannot be checked.
Work through the stages in order. Questions asked at the wrong moment get the wrong answers — pricing questions before the brief is understood produce a number the vendor has to defend rather than revise, and build-up questions asked after signing produce whatever is convenient rather than whatever was planned.
First stage — is this firm worth briefing? (questions 1 to 4)
This is the filtering stage, and it is best done on the phone in twenty minutes. None of these questions needs your brief, your budget or your drawings — which means nobody can tune the answers to them.
All of them are really one question asked from several directions: does this firm control the thing it is selling? This guide is written for exhibitors, procurement teams and agencies who need a stall built on time, to drawing, and safely at the venue, and most of them find out the answer during build-up week. You can find it out in a twenty-minute call, which is the whole argument for asking these first.
01
1. Can I see photographs of finished projects at my size, from a show you can name?
A good answer brings on-site photographs with the show, the city, the stall area and the year attached, including shots of the stand occupied by staff and visitors rather than empty at handover. A bad answer is renders only. A render proves somebody can design; only a photograph proves somebody can build, and the gap between the two is where most disappointment lives.
02
2. Who will be my single point of contact, from brief through dismantle?
A good answer is a name, a role and a mobile number, plus confirmation that the same person is physically on site during build-up and show days. A bad answer is "our team" or "our coordination desk". Shared accountability is no accountability, and a contact who changes at handover means nobody carries the history of your decisions onto the floor.
03
3. Can I visit the workshop or studio this week?
A good answer is a day and an address. A bad answer is any version of "later" — nearer the show, after the order, once the design is approved. The request is routine for anyone buying something fabricated, so reluctance to host it is itself the finding, and you get that finding before spending a rupee.
04
4. Have you worked at my venue, and what are its rules on height, rigging and fire rating?
A good answer is specific about the hall — the height limit, whether rigging is allowed, what fire certification the organiser demands, and when drawings have to be submitted. A bad answer is "we work at every venue in India". Breadth is not the claim you need; one correct hall rule tells you more than a list of twenty cities.
At quoting stage: questions 5 to 8
At this point the brief is out and the quotes are coming back. Everything below exists to stop you comparing two different stands by their totals. None of it is hostile; the supplier who itemises properly is the supplier who will not be arguing with you in March.
The cost drivers for trade show booths are not a secret — they are the list below. From ₹9,000 per sq.m. A vendor who can rank those drivers for your specific brief is pricing the job. One who cannot is pricing a guess and hoping the variations cover the difference later.
- Stall area in square metres and number of open sides
- Finish level (laminate, paint, veneer, acrylic, metal)
- Height, hanging structures and double-decker elements
- LED walls, lighting and raised flooring
- Distance from the workshop to the venue and build-up hours
01
5. How many light fittings, and where exactly?
A good answer is a count and a set of positions — spots on the brand wall, track over the product, a backlit panel at the entrance. A bad answer is "lighting included". Hall lighting is designed for the aisles rather than for your stand, which makes the lighting count the line most responsible for whether the stand reads as funded or forgotten.
02
6. What materials and finishes are you quoting, exactly?
A good answer names board thickness, the laminate or paint finish, and the fire treatment. A bad answer is "premium quality" or "imported finish". Specification is what the organiser's safety check examines, and it is also the only way to tell whether a cheaper quote reflects a better rate or a thinner board.
03
7. If I remove something from this quote, what does the total become?
A good answer is a revised figure within a day, because the quote was assembled from line items in the first place. A bad answer is a vague "we'll adjust" or a total that barely moves — the first means there were no line items, the second means the removed item was never honestly costed.
04
8. What would you change about this brief if it were your budget?
A good answer is an opinion: spend more on lighting, less on joinery, move the storage, drop the second message. A bad answer is "it's perfect as it is". A supplier with no view is either not reading the brief or not willing to risk the order by disagreeing, and neither of those helps you on the floor.
Stage 3 — before you sign (questions 9 to 12)
Everything here is about converting agreement into documents. Each question seals a gap that would otherwise open during build-up, when every remaining option costs money. The timing is the point: ask before the advance goes out, not after.
Nothing in this stage touches aesthetics or cost. It is entirely paperwork: what gets signed, when, and by whom. Those are the variables that separate a stand built to the agreement from a stand built to whatever was remembered.
01
9. What happens if you are late?
A good answer is uncomfortable but specific: here is the slack in the schedule, here is who we call, here is what we would do. A bad answer is that it has never happened. You are not really looking for a penalty clause — you are looking for evidence that somebody has thought about the failure case before being inside it.
02
10. Who prepares and submits the organiser paperwork, and by what date?
A good answer lists the actual documents — stand drawings, electrical load, material certificates — names who lodges them, and states the organiser's deadline from memory. A bad answer is "the organiser will tell you what they need", which pushes a hard deadline onto the party least equipped to meet it. A rejected submission costs build-up days nobody has spare.
03
11. How are changes priced, and who is allowed to authorise one?
A good answer is a written variation, priced before it is executed, authorised by one named person on each side. A bad answer is "we'll adjust at the end". Verbal agreements made on the floor during build-up are the largest single source of post-show invoices nobody remembers approving, and one paragraph in the contract prevents all of them.
04
12. What are the payment milestones, and what does each one release against?
A good answer attaches every instalment to something inspectable: a signed scope, approved drawings, the submission acknowledgement, a workshop dry build, handover of a working stand. A bad answer is a schedule of bare dates, or most of the money up front. Keep a meaningful balance payable after handover — it is what keeps a crew on the stand on show morning.
Before build-up: questions 13 to 15
Save these for the fortnight before the show. By then production is finished and everything that can still go wrong is logistical. It is also the stage buyers most often skip, which is precisely why asking gets you an unpolished answer.
The outcome you paid for is a stall layout with a clear entry, a working demo counter, storage that keeps the floor clean, and a closed meeting area for serious buyers — and it is won or lost in the last twenty-four hours before doors open. That is the window these questions are about.
01
13. What do you need from me, and by when?
A good answer is a dated list: artwork at final size, product dimensions, staff numbers, any samples to be displayed. A bad answer is "nothing, we'll handle it". Most build-up delays trace back to an input that arrived late, and a supplier who has not asked for yours has not planned backwards from the date.
02
14. Who dismantles and clears the stand, and what happens to the reusable elements?
A good answer is the same crew, inside the organiser's dismantle window, with the reusable frames and graphics named and a storage arrangement stated. A bad answer is silence, because dismantle was never priced. This is where deposits are forfeited, penalties are charged, and assets you paid to fabricate quietly go to landfill.
03
15. Who is on the floor during show days, and how fast can they reach my stand?
A good answer is a name, a location and a response time. A bad answer is a central number. Show-day problems tend to be small and urgent — a blown lamp, a loose panel, a screen that will not wake — and they only stay small if somebody is already in the building.
Exhibiting soon? Let's build your stall.
The answers most likely to mislead you
Here are the ones where a plausible answer most often turns out to be empty. Every row applies the same test — is there anything in this reply you could check next week? Have it in front of you while you talk, not after.
| The question | What a real answer contains | What should make you pause |
|---|---|---|
| What happens after the show | Dismantle inside the organiser's window, elements into storage | No answer, because dismantle was never priced |
| Can I see finished work | Photographs from a named show, with the stall area and the year | Renders only, or images with nothing attached to them |
| Who is on site at build-up | A name, a crew size and the shift hours | Our team will be there |
| What will I approve before cutting | Dimensioned plans and elevations, by a stated date | The render you have already been shown |
| How many lights | A count and a position for each one | Lighting included |
| What materials are quoted | Board thickness, finish and fire treatment, named | Premium quality, with no specification |
| What do you need from me | A dated list of inputs | Nothing, we'll handle it |
None of the warning signs is a lie. They are all true statements that cannot be verified, which is exactly what makes them worth noticing.
The size question most exhibitors never ask
Add one question to the 15 above, because it sorts designers from order-takers faster than anything else: how many people fit in my stand at once? A trade show booths vendor who has thought about the show can answer it; one who has only priced the joinery cannot.
The sums are these: 10% of the area to storage up to 18 sq.m and 15% beyond it, 5% to a meeting corner — 20% if meetings are the point of attending — and the rest to display. Display divided by 2.5 gives simultaneous visitors; total area divided by 9 gives staff on duty.
Why it matters: footfall expectations and stand capacity are usually set by different people who never compare notes. If your campaign is built around a volume of visitors the stand cannot physically hold, the constraint is the stand, not the marketing — and that is a conversation to have at briefing stage, not on day one.
| Area | Display space | Storage | Staff needed | Capacity | Weeks to build |
|---|---|---|---|---|---|
| 12 sq.m | 10.2 sq.m | 1.2 sq.m | 2 | 4 | 3 |
| 18 sq.m | 15.3 sq.m | 1.8 sq.m | 2 | 6 | 3 |
| 24 sq.m | 19.2 sq.m | 3.6 sq.m | 3 | 7 | 4 |
| 36 sq.m | 28.8 sq.m | 5.4 sq.m | 4 | 11 | 4 |
| 54 sq.m | 43.2 sq.m | 8.1 sq.m | 6 | 17 | 5 |
Figures follow the published ratios — one staff member per 9 sq.m (minimum 2) and one visitor per 2.5 sq.m of display. Build weeks exclude your own approval time.
Replies to walk away from
Some replies are not warning signs to weigh up — they are conclusions. The first group below are the failure modes specific to trade show booths; if a vendor's answers point at any of them, you have learned what you needed to learn and the next call is to the second name on your list.
- Sub-contracted builds with no quality control
- Non fire-retardant materials rejected at the venue
- Late arrival on site that eats into build-up time
- Hidden extras for electrical, carpet or dismantling
- A discount offered the moment you hesitate, with nothing removed from the scope
- A refusal to name the workshop or studio, or a visit that is always possible next month
- A delivery week offered in place of a dated production schedule
- Fabrication offered without drawings for you to approve first
- Every question fielded by the salesperson and none by anyone who builds
- No one able to say who will be standing on your stand on build-up morning
- No answer at all on dismantle, clearing or storage
Specifics are short. Reassurance needs paragraphs.
Turning replies into a decision
Write the answers down as you receive them, in the same order, for every vendor. Three columns on one page does more for the decision than any amount of discussion, because a missing answer looks exactly like a missing answer once it sits next to two filled cells.
Then read the set backwards, from the outcome to the answers. You are not buying a stand; you are buying a result at a show, and the questions only matter in so far as they predict it. A vendor who answers everything well and cannot discuss what the show has to achieve is a builder rather than a partner — useful, but you will have to supply the thinking yourself.
- The date on which you will approve dimensioned drawings
- The show-day backup plan and who is on the floor
- Who submits the organiser paperwork, and the deadline
- The material specification, including the fire treatment
- The project manager's name and mobile number
- Who does the work, and the address where it happens
- What the vendor needs from you, and by when
Send the questions with your brief
Send all three vendors the same brief and the same questions: show name, city, dates, stall area, number of open sides, budget band, and two or three reference images with a line on what you liked about each. Identical inputs are what make the replies comparable, and how quickly and precisely a vendor answers before you have paid anything is the best available preview of how they will answer during build-up week.
We are happy to be interviewed this way — written answers, every question. Design free with a confirmed fabrication order, production in our own workshops, organiser submissions handled, and one named project manager accountable from brief through dismantle.
Frequently asked questions
When should I ask about build-up?+
A week or two before the show, once production is finished. Ask for the arrival slot, the crew size, the shift hours and the hour the stand will be finished and cleaned — not the hour build-up closes.
What should I ask about dismantle?+
Who does it, whether it happens inside the organiser's window, what is cleared, and where the reusable frames and graphics are stored afterwards. Unpriced dismantle is where deposits and penalties surface.
Is it reasonable to ask to visit the workshop?+
Entirely. It is a routine request for anyone buying a fabricated product, and the reaction to the question is informative even before the visit happens.
How many vendors should I put these questions to?+
Three, with the same brief. Two gives you nothing to calibrate an outlier answer against, and five is more work than the comparison repays.
Should I ask about things that could go wrong?+
Yes, and the quality of the answer matters more than the content. A vendor who describes the slack in their schedule, the spares they carry and who they would call has thought about failure. One who says nothing has ever gone wrong has not.
What should I ask a trade show booths vendor about pricing?+
From ₹9,000 per sq.m. Beyond the figure, ask what drives it, what would make it cheaper, which lines are excluded, and what the pre-tax total is. A vendor who can rank the drivers for your brief has priced the job rather than guessed at it.
What should I ask about the venue's rules?+
Ask for the height limit, whether rigging is permitted, the fire certification the organiser requires, and the date drawings must be submitted. Specific knowledge of one hall beats a claim to work in every city.
How do I know if my stand is the right size?+